How is the WIP value determined for the first receipt of a FIFO shop order? 24.2.1 On the first receipt (i.e., partial) of a FIFO shop order where the operations are using a Fixed Resource Share and are being reported through auto reporting, I cannot determine how the Machine Cost is calculated. Setup: Manufactured part = FG1, valuation method = FIFO. Routing op 10, WC A, 1 unit/hour, fixed resource share = 0.3. Routing op 20, WC B, 1 unit/hour, fixed resource share = 0.3. Work Center A, cost = 30.00/hour, no overheads Work Center B, cost = 20.00/hour, no overheads FG1 product structure consists of only one component (COMP1, valuation = FIFO), QPA = 1, Estimated Material Cost = 1.00, Cost Set 1 = 1.00. Nothing on the Produced Parts tab. FG1 Cost Set 1 = 16.00, template M-110 with only standard buckets. Zero on-hand inventory of FG1. Execution: Shop Order lot size = 5. This is the only shop order in the system for FG1. Receive (1), backflushing and auto report operations. OOREC transaction for 44.00 shows Cost Buckets: 110 = 1.00 300 = 43.00 Where did this 43.0