This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
We have designed Order Report Excel Output, when we are running the report error is coming "PDF Not Generated" in Aurena & "Stream was not readable" through the IEE. It's a Data Rendering Limitation. If we are limiting the data less than or equal to 58,000 report is generating. Also, if we are designing the report through the designer then report output is coming in PDF for whole required (Pages 15,000 approximately. I am attaching the screenshot in a sequence for reference
We have multiple situations where shop order pick lists are being generated and the operation is missing leading to components not being picked. All structures have operations connected to them, but these are not being pulled through onto shop orders. I’m wandering whether this is because the product structure that they are called up in is planning method P (phantom)? For information: Pick Lists are created per Work CentreAll shop order material parameters are %Max orders per pick list is 1Include Unconnected material is toggled onPlanning Methods Used for manufactured parts - A and PPlanning Methods Used for purchased parts - B
IFS Cloud 23.2.9We are managing standardized parts which are certified by an accredited certification.This involves, after qualification, a freeze on the configuration of those parts and only one person in the company is empowered to modify any data on such a part. So, the objective is to freeze (block modifications) all the data we have on master part, inventory part, product structure, routing, purchase part, SFPP and sales part considering that many people can interact on these projections for classic partsAny idea to manage access/rights on many projections but only for some parts ? or is someone already got this need ?Thanks for your help
Hi,Does anyone know a simple way to add a customer field to a IFS Page?In this scenario, I would like to add the “Task Description” field to the “Work Task Posting Analysis” or “Work Task Transactions” page.The Work “Task Description” field is already in the “Work Task Cost” page but it is not an option in the other 2 pages. Not sure why but it would have been only logical to have it there because WT numbers are had to associate with an actual job without the description.Does anyone know how to do this?Henry
I am trying to find a Dormant time between the current executable operation VS last operation in a shop order. One option is I can go to Finish Date and identify but for our business need this might not be enough I am looking for when the operation in sequence was actually touched. Example I have operation 10, 20, and 30. 30 is executable, so I want to know when really the 20 was last touched? - It could be operation itself, material receiving, or last material receive date. My question is, where can I find all those dates in IFS cloud?
Can we scan the Order No in the Receive Shop Order By-Product WADACO process and retrieve the relevant Shop Order Number?If yes, please advise how to configure the WADACO process to include barcode scanning for the Order No field? Thanks & Best Regards,Thisarani
Dear All,Can more than one quality control plan be added to an inventory item?Can both be active?Kind Regards,
Is there a screen in IFS Apps 10 Aurena to view the historical interruptions that have been logged? I want to see all interruptions and the length that a shop order was on stop for. Thanks!
I would like to report machine time through machine clocking in Shop Floor Workbench (SFWB), but report labor time based on received quantity (if this is possible). I have set the work center Time Reporting Settings as follows:where Auto Report Labor Time with Qty is set to Always. When I test this, I start production on the Shop Order through SFWB and select Machine Time only. I then go to Approve the operation and receive the reserved Lot Batch with Auto Report of Operations selected.However, when I review the Labor and Operation history, there is no labor reported. I was assuming that having Auto Report Labor Time with Qty would result in labor reported (transaction code LABOR_RPT) per the standard based on the received quantity. However, all that is reported is the OPFEED transaction with qty and machine time. Is what I am expecting mistaken, or is there a setting that I have missed?
Hello,For a serialized manufactured part, at a certain operation on a shop order I scrapped 1 part out of 5 (Lot size)Then I want to receive the shop order and I got at this level one serial number part which not activated.But the problem is that I have the possibility to activate the receipt and the message below is not blocking!!This will create many incoherences :for example, in shop floor workbench, it is possible to visualize the scrapAnd also in inventory, we can find 5 parts received with standard cost and 1 part with “scrapped cost” which is not logic! Can anyone has an idea about this and how is it possible de block it please? thanks
Hello,We are using DOP for configurable manufactured parts. We want to manage the configuration of a lower-level component outside of DOP structure. However, it seems that even if the sub-component doesn't have a DOP configuration profile, the system still generates a requests from the DOP header.Does anyone have experience with this or a potential solution?" Thank
Hi, We have serialized shop orders (for Lot Size = 1), but one operation may take a few days to complete. With Shop Floor Workbench, we are trying with daily reporting of labour time and quantity. However, the system is not allowing to report a partial quantity reported when it is serialized. Not sure why as we’re not receiving fractional quantities - but merely reporting it so that the system knows the labour time and quantity each day (main objective is so that MSO will adjust the schedule).How does IFS expect to report daily quantity complete when the operations take days to complete and the part is serialized? TIA
Has anyone come across the scenario where deletion of a Shop Order operation has been allowed where there are existing Labour and/or Operation hours Transactions - albeit that those transactions were at zero cost value so no actual cost incurred or transacted and not GL voucher created? Just wondering what thoughts are whether this should or should not be allowed? We were surprised it was allowed …We’re on Cloud now but it’s also allowed in Apps9. Thanks!Linda
Hello, I know that It is possible to create consolidated pick list for shop orders in two ways:use the Create Pick List(s) for Shop Order(s). Select the relevant shop orders from page Shop Orders and click to create Pick List Report. Is there a way to create a pick list per WO ? I can’t find any. Thank you !
Hello I have a question about Configuration Usage. Changing the configuration usage to Variant or Option has any effect on system?I have learned that the master schedule does not work for a special configuration id. So i want to understand the reason of using configuration usage option. Thanks,Fatih YILDIRIM
Trying to create a new config field that would be obtained and calculated from another existing config field. I need the new field to do the following: Sum up on the contents of all records in Table AudAudit of field called Cf$MinQty and then get AVG Qty of the only the rows that are Not Null or Zero.
Hello community! We are considering use of DOP for our MTO parts. We have been experimenting with the DOP features and are stumped with the netting.Part X is DOP.In our scenario, we have 1000 units of part X in inventory that is not reserved or pegged to any order. My demand for part X is 5000 units.When I check in DOP, the system is still telling me to create 5000 units, and the DOP system has generated a shop order for this quantity as well.How do I get the order for part X to net against existing inventory and only release an order for 4000 units?I am currently working in IFS Apps 10, moving to cloud in early 2026.Thank you!Robin
Hi everyone,I’m working on setting up approval workflows for a couple of key processes and would really appreciate any examples or insights from the community.I'm specifically looking for examples (templates, screenshots, descriptions—anything helpful) of rolled-out approval workflows for: Creating and configuring new part numbers, including structure and routing setup. Controlling changes to shop order structures and operations, especially when they deviate from the planned alternates. If you've got anything in place—formal or lightweight—that works for you, I’d love to see how others have approached this.Thanks in advance!
Good morning community! We have a scenario where we have a sub assembly on our PS. We would like to flatten the PS to move the sub assembly components to direct components of the finished good eliminating the need to transact the sub assembly. This sub assembly that we want to remove from the PS is used in multiple finished goods (it is a blend of materials). We want the ability to see demand for the blend (sub assembly) but not actually schedule it or produce it unless we need to put it in barrels to be store in inventory (lot controlled).We have tried phantom parts, but they only seem to explode the materials in the shop order as opposed to the operations. We want both to be part of the finished good.We have tried putting the blend in our PS as a zero QPA, but had to set the component to ‘allow as not consumed’ to get it to work. This created an error because it is lot controlled (which it needs to be).And we cannot put both the sub assembly and raw components on the shop order
Hello IFS wizards, Just reaching out here to find out if its possible to generate a Shop Order/Req report that’s able to be interrogated from withing IFS, rather than the functionality we currently have that dumps the data into a printable report; I’m thinking it’s got to be possible because the report is pulling the data from somewhere, I just wanted to rather than dump the data externally and extrapolate from there, I can use IFS functionality and user interface to navigate to corresponding pages without manually typing numbers in. Any help would be gratefully welcome!Thanks all,Martin.
Hi All,We are trying to capture the user who reserves serials in a shop order. I do not see a field for this and it is not in the history log. Is there a way to capture this? Thanks.
Here is my setupI’ve got an activity with a start of 6/25 at 8 am and an end of 6/25 at 5 pm, it’s a 1 day duration and I have Resource 1 assigned for 1 hour on this day.I also have Resource 1 assigned to a project connected work order for a 4 hour task planned for 6/25 8 am to 6/25 12 pm, hours.When I select Resource Activity Load, I get the following, it is showing my Work Task planning, but it is not showing the planning of the activity resource itself.Next, If I go to Resource Activity Load Detail, I get the following, it shows .82 hours even though I have it planned for 1 hr and it doesn’t show the plan for the Work Task.I’m looking for help in understanding why these screens are like this and to understand how the system calculated .82 planned hours when I specified 1 hour on the activity’s resource plan. In addition, from the resource planning of the project, I see my 1 hour and 4 hour planned hours but when I select Resource Activity Load from this screen, I get nothing.If anyo
When Mach Run Factor and Labor Run Factor are in units/hour does this mean that the machine outputs 55 units/hour as well as Labor Run Factor outputs 55 units/hour?
Greetings!I just created a part number but forgot to add a digit. Is there any way to just edit the part number with out re-creating a brand new one all over again in IFS Apps 10?