Does anybody know if the way IFS handles Estimate Item  > Required Date for components of BOM’s has changed from Apps10 to Cloud?

In Apps 10, when I add an Item Type of PRODUCT (Part with BOM) and enter a Required Date, the subcomponent dates are planned.

 

When I perform the same process in Cloud (24R2), my entered Required Date is populated into all sub-components. They are not planned like Apps10.

 

I cannot find any reference to this functionality changing. Does anybody know if and when it was changed?

 

Hi ​@AntChrisJ,

I checked this in 24R2 and did not notice any difference. It planned the subcomponents, considering the lead times into accounts. Do your parts here have any lead times?


Thankyou for confirming ​@Yathartha Karunananda, I do have leadtimes throughout the BOM, so it may be something else or a bug.