This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
Community, I have a remote warehouse set up as a putaway location already. and I can see it in the inventory part operative Valuesafter run Refill Putaway Zone, PR, PO is created and released.but I still got this error message, no putaway zone can be found. May I know where I missed?
Hi first post - please be gentle!! we use IFS 10 - we have supplier 360; Customer 360 …. is there an “Inventory part 360” Nigel
What projection permission is needed to view only work task in Aurena IFS10 ?
Hi, if we use the standard Ship WIP to supplier, we only have the delivery note that can be printed. We would like to have more documents in some cases, comparable to the options we have in the shipment flow/ customer order flow. How can this be achieved? Thanks!
Hello,We are currently using IFS Aurena and I need to write a quick report which allows me to pull inventory part usage by date range and the following data points:Part NoQuantity UsedCostCode Part Values How can I do this?
The time in ship/date time on a customer order line defaults to 12:00 AM. How do we change the default time on a ship date to say, 3:00 PM? We run Master Schedule at 3:00 AM. Because it runs after the ship time of 12:00 AM, we get MS Action Proposals of Actual demand is past due (late shipment), even though the line is set to ship that day and not actually late. IFSAPP10Thanks, Eric
Looking for Shop Floor Employees to report time within Shop Floor Workbench.Not all employees have logins to the system so the supervisor will enter both time and number of team members.Reporting in real time not always possible so need the ability to easily modify times but would also like to have a timeline to ensure accuracy.Does anyone have suggestions on how to do this?
Hello all, I am hoping to understanding if the following functionality is possible in IFS Apps 10 UPD 15. Currently, I have a Lot/Batch tracked part where we define a Lot number upon receipt. Currently, the part is set to backflush. I know that if I change the consumption method (issuing), I can force the system to prompt for a Lot Number. Is the same possible for Backflushing? Ideally, when the user is reporting a Shop Order completed qty in SFWB, the system would prompt them to enter the Lot Number of the component part they are consuming. I have not seen anything in the help that would indicate if this is possible. Any guidance would be greatly appreciated.
Hello,We produce a single product by combining three different inventory materials, and then place it in a plastic bag before putting it into our stock. The plastic bag is not an item kept in stock. How can we reflect the cost of this plastic bag?Thank You for Your Insight..
PM Condition Based generations has stopped generating work orders. What might be the problem.
Hi,I have the following case in a Data Source condition:SOURCE_REF1 IS NOT NULLANDCASE WHEN TO_CHAR(SYSDATE, 'D') = 1 AND TRUNC(PLANNED_SHIP_DATE) > TRUNC(SYSDATE)-100AND TRUNC(PLANNED_SHIP_DATE) < TRUNC(SYSDATE)+2 THEN 1WHEN TO_CHAR(SYSDATE, 'D') = 2 AND TRUNC(PLANNED_SHIP_DATE) > TRUNC(SYSDATE)-100AND TRUNC(PLANNED_SHIP_DATE) < TRUNC(SYSDATE)+2 THEN 1WHEN TO_CHAR(SYSDATE, 'D') = 3 AND TRUNC(PLANNED_SHIP_DATE) > TRUNC(SYSDATE)-100AND TRUNC(PLANNED_SHIP_DATE) < TRUNC(SYSDATE)+2 THEN 1WHEN TO_CHAR(SYSDATE, 'D') = 4 AND TRUNC(PLANNED_SHIP_DATE) > TRUNC(SYSDATE)-100AND TRUNC(PLANNED_SHIP_DATE) < TRUNC(SYSDATE)+2 THEN 1WHEN TO_CHAR(SYSDATE, 'D') = 5 AND TRUNC(PLANNED_SHIP_DATE) > TRUNC(SYSDATE)-100AND TRUNC(PLANNED_SHIP_DATE) < TRUNC(SYSDATE)+4 THEN 1WHE
Hi Community,One of IFS customer is experiencing an issue that when they perform site MRP, it does not create supplies for seval random parts. But when they re-perform site MRP without any changes, then the system will make supplies for those parts but without creating supplies for several other parts.But selective MRP for the part always creates supplies as expected.What can be the reason for this?Your suggestions would be really appreciated.Thank you,Nimesha
Hello, I’m trying to understand the functionality of MS Set 0. Supply Chain Planning>Master Scheduling>Master Schedule SetsI understand Set 1 is system generated and data here is used for MRP/CRP and also as a user I can create multiple user defined sets to use for forecasting, before copying over to Set 1. The field description tells me Set 1 is always “Current” and Set 0 is “Base”. However the help function only refers to MS Set1. Is anyone able to explain the purpose of MS Set 0 and what happens to the data in this set? Thanks!
Hi all, I need to schedule an IAL to run once a year on the 1st OCT. Is this possible in APP10?Many thanks,Ben
Hi, is it possible to get a breakdown per component of the SOMTRLV material cost? We tried to run an internal report but there is always discrepancies when match to the figure on the inventory transaction history.
Hi, Are there any other planning programs which can used, besides the advanced planning board?Any programs with a proved integration? Thanks!
Hi,I am trying to generate HUs in Shop Order via packing Instructions. I understand this is inherited from Product Structure Alternate.However I cannot see to connect the Packing Instruction for the Product Structure. The existing Packing instructions are not fetched for the LoVwhat am I missing ? Kind RegardsYashodha
Can anyone share their experience using the part configurator but NOT using DOP? IFS documentation seems to pair these two functionalities but there is internal resistance to DOP as others would prefer to immediately generate an engineering part number from the configuration tool and skip using DOP. We have historically built an item and brought it into inventory and then picked it to the order and have used projects as a way to connect material/shop orders to customer orders. There is a mindset that there is no advantage to using DOP. I’m hesitant to run with that idea given the documentation seems to point to DOP as being the “best” option in a CTO environment. I’m of the mindset that it would help decrease part proliferation as we have definitely had new part numbers created for essentially duplicate systems which is inefficient. I welcome any pros/cons regarding using DOP with the part configurator to aid in internal discussions.
On release of a customer order, a Pick List is automatically printed. We want to stop the system printing this Pick List only for 1 order type. However, we still want the system to automatically print the invoice and delivery note. We do not want to make any changes that effect any other Order Types. How can we configure this behaviour for this order type?
We are on IFS 10. We have historically been an ETO business and used engineered parts and projects. We are working to launch some CTO offerings where we will use the configurator and potentially DOP. DOP seems to be the recommended process when using the configurator. There are some strong opinions of DOP within our group, both positive and negative. We don’t want to have purchase orders pegged, but it would be great to have shop orders pegged. What is the best way to go about accomplishing that without having to manually set pegging preferences for each line on a DOP structure?
Hello,I have a database of Routing Operations and Work Guidelines that I would like to delete since we would like to migrate new data. What is the best practice to do so ? Should we delete first the guidelines then the operations or we can delete the operations and it will delete the guidelines too ?
Other DOP headers are attached to the customer order line and total of pegged demands is greater then the customer order line quantity
Hello, What might be the cause of not being able to schedule the SO operation? The scheduling result shows Unscheduled.Has anyone encountered this previously? Thank you for your help!
Hi community,Looking foreward fo your suggestions on the following,For an inventory part, purchase lead time is set to 07 days and it shows the expected delivery date of 07/19/2023.Safety stock is set to 60 and min lot size is set to 80.No available stock or existing supply/demand.Aftter performing MRP for the part, it has generated requisition to replenish stock with a qty of 80 at the supply date 07/21/2023 (considering working days of the site) The question is whether the expected date is overwritten by the calculated event date and if so, the expectation defining the ‘expected date’ for the purchase part Thank you,Nimesha
Hi,We enter the characteristics when opening the inventory card, we want to see the characteristics of the parts when making a purchase request. How can we do this ?
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.