Hi,
In our shop orders, the last operation is not mandatory. Based on how the previous operation went, we might need to do it or not. It’s the operator himselve who decides, on the spot.
How can we easily do this with the shop floor workbench? Ideally we would have the option to close the operation and in the same time, the shop order and receive the material. The last operation can be just closed.
Any idea?