Hi community.I get the following error: I am sure the limit was reached and recorded, and I am super sure, that the invoice was not created. What seems to be the problem? T&RPS: Internal environment no customer project.
I am trying to create a PM Action that would generate daily recurring work request for a night shift that works 22-06, start of generated work task should be at 22. The problem appears to be date change in midnight.In date type “From Time” must be bigger than “To Time” thus has to define separately rows for 22:00-23:59 and 00-06. The one minute gap is needed as otherwise the “Latest Finish must be later than Earliest Start” is raised already in PM Action. Unfrortunately the work request generation sets the start time at 00, not 22. The day type in calendar that I use is as below. Any good ideas how to generate work requests that start at a certain time and have the earliest-latest span through the work “day” that starts in different date than it ends?
In the Maintenance Plan within Fleet and Asset Management, there are two calculation rules, Inspection and Overhaul, that works exactly the same way if the Cycle flag is set to No Cycle.Does anyone currently have any maintenance plans where the combination of Calculation Rule = Overhaul and the Cycle flag = No Cycle?
Hi, Is it possible to perform External service for the Company Rental Asset? The scenario is, Company rental asset at a regular internal of time, inspection is performed externally. I got the below error message in the Material Purchase Requisition. Thanks in advance!Kind Regards,Thanga.
PM Maintenance Plan Due Date calculation is NOT CLEAR.PM Maintenance plan, next planned value is calculated based on , either(a) The Last Measurement at Maintenance(b) The Predicted Value at Maintenancewhen performed Value Base is YES. The calculation for Planned value is clear using 2 fomulars, but it is not clear how the Due date is calculated.It says, LENEAR REGRESSION is used to calculate the Due Dates of the maintenance plan based on the planned value.we did some testing using some measurements created but linear graph we drawn using Ms.Excel is not matching with the maintenance plan due dates.Does anyone of you know how the Due date is calculated using LENEAR REGRESSION. If you know any equation, please help me.
Dear all.I checked the 23R1 DEV and noticed, that the Repair Order process still isn’t working.When is the date expected? Repairs are pretty common and yes managable with the manual process, but since there is a button Repair Order, it’s rather hard for the consultant to explain, why the function is not there. T&R
On what screen in IFS10 can a user find the same functionality that was available on the “Route PM Actions” screen in IFS8? Thanks!
Hi all,I’m running into an issue in which the Serial Object Warranty badge is indicated as ‘No’, however if you select the ellipsis and select Warranty, you will indeed see a Supplier and/or a Customer Warranty has been set-up. This behavior is visible on the Serial Object as well as the Equipment Object Navigator.Process Steps:Receive Part with a Warranty Template defined (i.e. 1 year) Deliver this part to a Customer with SM Object creation specified on the Sales Part Navigate to either Serial Object or Equipment Object NavigatorHere is issue I see: Is there something missing from the set-up?Thanks.
Hi Community,In IFS Cloud 22R1 SU3, the Customer No is not inherited from the Object party when creating a new Work Order on this Object from the “Prepare Work Order” page. Is it a bug or is there a set up missing somewhere ? Thanks
Hi All.I’m getting this message as I press the + plus buttom to create a new line in planning tab inside the work task of a work order.This happen with the owner user.Does anyone know something about it?Tks a lot------------------------------------------------------------------------------------------Error while serializing contents.This error happens when the server cannot serialize the data to be sent to the client.A common cause is that one attribute's length exceeds the defined maxlength in the projection.To find more info, open Log Window or Debug Console, refresh and then check Network Tab in DevTools. In the response there can be more detailed information about the exception.Url: https://pettst.avcweb.com.br:64080/main/ifsapplications/projection/v1/WorkTaskHandling.svc/Reference_ActiveWorkOrder?$filter=WoNo%20eq%2085008&$skip=0&$top=2Request Id = 73f0e6bb-7261-44e4-adfe-2430f49601e6Date = 2022-10-04T13:28:31.496ZClient version = 10.14.127.0
Hello, I can’t reach IFS server in chrome. All needed extensions are downloaded. I tried to uninstall chrome, uninstall and reinstall extensions, cleared cookies, cache and browsing data still nothing happened. In barracuda testing connectivity, everything is going through, but can’t access in chrome.Maybe someone had this problem??
Does anybody know the formula in Risk Analysis for “Calculated Risk Estimate” based on 3-point method in IFS?
Is it possible to add an administrator group for a PM action? It can be observed that this is possible for both PM Program and Work Task Templates. When going to the PM Planning lobby, there are "My PM Programs" and "My Work Task Templates". The aim is to see the PM actions, for which a particular maintenance engineer is responsible.
Hello,I’m wondering if it’s possible to adjust the future due dates on a PM action with Performed Date Based set to Yes without a new work task being created/completed? Every time I try to manually change the due date on a line in the maintenance plan, the system won’t change any future suggestions. We’re running apps 10 update 13.A little background on the specific scenario:The PM generated a work order for 10/5/22, but because it falls during a major outage at the plant, it was decided to skip this instance and perform the maintenance when the unit is back online. The WO for 10/5/22 ended up being cancelled. The major outage will be completed by 12/12/22, so we want to adjust the next due date for this PM to line up with that date. I can manually adjust the due date for the next maintenance plan line and save, but the rest of the due dates don’t adjust. The Earliest Start, Latest Finish, and Remaining to Due fields also remain the same for the original due date. I’ve also tried chang
We are using IFS 10 UPD7 wherein the Inherit Measurement functionality is not available.Since there are some serial objects which are being moved between equipment's and running hours of the serial object is tracked for maintenance, repair and replacement, it is needed to auto update the measurement readings from the parent object. Would like to know is there any patch available to get this functionality in IFS 10 UPD7 version. Thanks in advance,Siva Ganesh M
Where is the documentation for the PLSQL API? I need to check if my parameters are correct for Plant_Object_API.Set_Planned_For_Operation__I’ve found REST API documentation, but that doesn’t help...
Hello everyone, I would like to know, if it is possible to generate a PO for a CO rental line ?When I create a CO with a rental line, any PO is generate by the systems and I can’t linked them together with indexing ? Is it possible ? Regards,Nicolas.
Hi, I am using IFS Enterprise Explorer. Client vers: 9.0.57.0, Server vers:6.90.20.0 I am a new to the application - with little training, so I am sorry this should be a veryy easy question. I would appreciate some orientation around the ’Structure in Tree’ dropdown options for (I am assuming) ...ordering the Object Hierachy. See the attached picture. I seem to have (by default)... an Object ID ordered Hierarchy. The Dropdown for ‘Structure in Tree’, displays ‘Location’ and ‘Process’ fields (amongst others). I would like to know where these fields are exposed in case I can edit them to display the Hierarchy more intuitivelyI am aware that I could add Structural Parent Objects (and provide Alphanumeric ID codes) however it seems from the drop down and from other answers in the knowledgebase that options for re-ordering the tree are already available .. I have Serial and Functional Objects, and have been looking in the Serial Object and FUnctional Object Tabs (to the right of the Tree),
Hi All,One of my customer is looking feature in IFS which can be used to conduct Audit on their equipment’s. Asset Audit can be done by internal Auditor or by 3rd Party vendor.Here is a link of an example how usually Asset audits are conducted. Do we have direct feature tied up to Asset Management in IFS where such audits can be conducted and maintained in application for a asset.https://www.sortly.com/blog/how-to-perform-an-asset-audit/I am aware the audit process requirements and technical parameter will change based on different business area of customers. But do we have something common ? Work Around - Use Work Task Template to capture Audit questions, PM Action to fire WOs periodically per equipment. This will maintain audit history based on specific Action used on PM Action and Work Type on WOs.Thanks in advance for your reply.Regards,Srinivas J T
Dear Community, We are currently on IFS Cloud 22R1 (update 5). We were informed that the feature ‘Miscellaneous Resource Allocation’ would be available as of 22R1.Am I checking in the incorrect location or is it available in a later update? Below screenshot of my IFS Cloud view: Thanks!
Hello All, Any one have ideas on how to acquire IFS Report Designer software that is compatible with IFSAPP 7.5 Regards
Hi,What is the business case when should we copy Project Deliverables Structures to Asset Design, when to Equipment structure? Customer in Cloud.In project deliverables we can copy the project product structure to either Asset Design structure or Equipment structure. This is a parameter setting which one to use. Now I’m wondering when should we choose one or the other? I have understood that from asset design we can copy the structure further to Equipment structure.Anyone knows about this?
When creating a Retrospective Work Reporting EAM, a Work Type is entered. On the Work Order that is created, the Work Type is blank. Is there a way to automatically have the Work Type added to the Work Order? The Work Type shows up on the Work Task associated with the Retrospective Work Reporting EAM but my client would like it to also show up on the Work Order record. Thanks,Gregg
Hi,We are fairly new to IFS and still learning. We now have some of our equipment’s that have been disposed off. The Finance Team have processed them to remove from the Service Contracts and Fixed Assets but we are wanting to confirm the best way to remove the Serial Objects.Do we scrap them to remove from Inventory or is there a better Disposal Process to follow to correctly remove these assets as Live Assets in Inventory.Thanks,
Hi all, We want to use Aurena but it has a lot of errors and functionality missing. For example: Create a purchase requisition by using the wizard, and without articles, you can not “Connect it” to a work order or a work order task… only Project and ordinary account-dimensions… Are we the only customer who is missing this ?
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.