Dear forum members, do have idea how to modify the inventory part Copy Part function defaults in IFS10 ? Currently used defaults are containing lot of risks, example at alternate parts.
Hello There, Currently, I am in the SHOP FLOOR WORKBENCH window and trying to approve an operation for a specific lot/batch. Before doing so, I am supposed to enter the inspection results for the Control plan. Within that “enter inspection results” window, there is a field named “Unit of measure” that displays the value. I would like to know, if it is possible to set up “UoM” ?ora window to look at the pre-defined UoM values for a specific operation ? Looking forward to your responses.
Is it possible to assign multiple resources to a shop order operation?Example: A Shop order operation is routed to Work Center “X”.Work Center X is made up of machine resources X01, X02, X03, X04. A small order will run on X01 only while a large order will utilize all 4 machines. Can X01,X02,X03, and X04 all be assigned to one shop order operation?An attempt was made to manage it with multiple work centers where X1 represents 1 machine, and X4 represents all 4 machines, but this skews capacity views when a resource is assigned to multiple work centers.
Dear Sir; Before delivery parts to the customer, the parts (inventory items) are packed by packing material (inventory items) with a standard numbers for each packing material.I would like to consume appropriate numbers of these packing material, following the numbers of parts delivery. Does IFS have any function like packing BOM? Regards;Yasuda
Community, Does anyone could tell me the difference between the option ‘Yes” and “Allowed”? please see the parameter in distribution and manufacturing screenshot attached. Thank you.
We are new to submitting VAT reports in Germany. Does anyone know how we need to go about it? Looks like we need to register with Elster to get a certificate. If we save the VAT file to a FTP folder, can Elster pick it up from there? Any help would be appreciated.
Community, We are using APP10. in current Lobby, for shop order planning alert, we can only see very simple data, i.e. data from planning alert window. We would like to build a consolidated data source to display all the info, e.g. project ID, shop order no, component no, quantity short, required date, earliest planning date, especially, what the supply info would be, e.g. purchase requisition, purchase order, status, lead time, and etc…i think the difficult part is the supply info, there is no one to one pegged order info available (inventory order). in window Inventory Availability Planning this window, usually the supply order(purchase requisition/purchase order) due date would be the same as the shop order component required date.does anyone has this SQL statement already, mind to share it with me?Thank you.
Kindly share if you have any document . I need to understand more about PRJT11 and following postingsPRJC13 Multi-Company Project Personal Costs Invoice for the Customer Company PRJC14 Multi-Company Project Non-Personal Costs Invoice for the Customer Company
Does IFS have a way to list Single Lot requirements on Product Structures? We currently machine parts that require a single lot of material to be used for the full order. Is there a way to capture that requirement?
Has anyone used the Define Modification in IFS in conjunction with CRO? I have returned units that require to be converted to another part number and Modification seems to be able to do that. Although I have read through the help, it is not very intuitive how to set up and create a task list on the CRO Repair line to actually carry out the mod. Grateful if anyone who has done this could share their experience. Thank you.
Hi Guys, In the Quality Management > Tool > Tool Instances page, in my “IFS Training Environment”, when the “Next Calibration Date” has passed, the validity does not change from “Active”. Is there a way to make the Tool Instance Validity change from Active to Hidden, when the Next Calibration Date has passed? Again, thanks very much for your assistance. Regards, Calibration Guy
What is the business logic behind setting the Create Cost Accounting to "No, Do Not Update the Project Cost" for Correction and Recreated Transactions when you create the correction transaction at customer company end as shown below Whilst if you create a correction transaction at employee company end Correction and Recreated Transactions fetches the value from corrected transaction
We frequently change parts for other parts, a replacement part,... normaly to introduce a new component and phase out an old component. A revision change, a product improvement, a better cost, etc.When doing these changes, on a product structure, we increase the revision (with the new component included in the BoM),... but we would like always to consume all inventory of the old component, so that we do not leave "obsolete components in stock" ... with no future demands.We are investigating into the Alternate Components MRP Netting functionality, and miss one important thing: The MRP will account for the existing Qty on Hand (for calculating the needs for the new components), but will not use any of the projected stock of the old component. We many times face situation on serial manufacturing, where the new component will take some time to arrive, and we have current POs of the old components on the way (that cannot be migrated/changed to the new component). That is, a ramp down on the
Hi All, i have a scenario where i would like to add a component with the same configuration into multiple structure alternate lines as a mass update, i would normally use the find and replace on the components per product view for this when it is a replacement but i want to do the same but to add a component not replace an existing one.does anyone know if it is possible without migration jobthanks in advance for any help or advice
It is possible in IFS Cloud to do an “ Routing - mass update”?The customer need this mass upadate fro example:Change in all routings the text “prepare” to “XXYYY”Thanks for yours supportMilanko Simovic
Hi,In my product structure, there are some components connected to the first routing operation. As the first step automatic reservation will be done. Next step should be manual issue. (backflush not allowed) In case if user forgot to do manual issue, and he or she tries to report the operation, then I expect an error message saying that sufficient operational materials are not issued. I have used following settings, but still I don't get an error message, system backflush operational materials. I want to stop backflush.Settings on the Work center of the operation:Note: Operational materials are not available in the inbound location that I have defined here. According to the setting, backflush is not allowed outside of the defined inbound location. Which means, system should raise an error.Anyway above settings do not give me the expected result. Can you please help. (note: this is IFS cloud 22R1)Thank you. kind regards,Yashodha.
Hi, In one of our test environment we have the error “COMPONENT_FISNOT_SYS.INSTALLED must be declared” . The package should have been generated at the installation time based on the module_dependency_tab according to a previous post. In this environment the entry is missing. We can manually create the entry but is there any explanation to why it can be missing?Best RegardsChaminda
Hi,In a shop order we can see three cost calculationsStandard cost Estimated Cost Actual CostFor a repair shop order how this cost calculation is done ?I can see standard cost values are inherited from the part cost (cost rollup) of manufactured structure, which is not correct in my opinion. Also when I check the actual cost, it has taken estimated cost of the components which are used to manufacture the part. This is not correct. When doing a repair , manufactured structure components are not used. Repairing is done for an already manufactured part. In repairing process, may be new components are not used at all and only few operations can be take place.I don't see the cost is done correctly in a repair shop order. Can someone please describe above three cost calculations for a repair shop order (Standard, Estimate and Actual)?Note: I'm using IFS Cloud 22R1. Thanks in advance.Kind regards,Yashodha.
HiDo we have any plans to develope this funcionality in the future? It is much lighter than VIM and could be useful for many customers but it is lacking some critical funcionality (should be possible for company rental assets, shoul be possible to keep the position/line no when changing the structure, multiple lots in one position etc)?Matti
HIi need to retrieve the list of internal customers used in our manufacturing system,and compare it with the internal customer used in posting control M53 as example.also I need to retrieve the list of cost source used in the system. what shall I do?
We are having issues with freight being added to an intesite order and holding up the closing of the order and not transferring back to the PO. Thoughts on why this would be happening? Our scenario is as follows:PO is created by Site A to get inventory from Site B. Customer Order is created from PO in Site B. Site B ships the items to the address for Site A via our shipping tool Freight tracking tab is populated with data Freight gets stranded right now on the customer order Thanks!
Hi All, I’m getting below error when installing CBS in a customer application server. This customer is in Apps10 UPD13. CBSSERVER user is active in application and db. Also, it is possible access the db using sqlplus. Can anyone help to solve this issue?Thanks,Dilshani
Shop order increases packaging requirements when assembly is scrapped during operation.Example: Assembly lot size = 100. Box on the product structure QPA=1. We need to produce a full lot of 100 so we use increase lot size on scrap option. 1 assembly is scrapped, lot size increased to 101.IFS calculates requirements of 101 boxes however a box is not needed for the scrapped assembly. Is there an option to not include scrapped assembly qty when calculating material requirements?
Community, a simple question.May I know where to define the objects that will be showing up in below window, object drop down list? please see the screenshot attached. Thank you.
Is there any way to copy part characteristics to purchase parts characteristics in IFS9?If possible, could you please describe in detail steps. Thanks in advance.