Question

Control Plan data points responsibility divided into several parties

  • 27 September 2021
  • 1 reply
  • 84 views

Userlevel 5
Badge +12

Hi,

What is the best way to handle the below scenario in setting up Manufacturing Control Plan?

 

I have several Data points to check. But the responsibility is divided into Operator, QC and QC lab. Some data points checked by all parties but some by one party.

 

Since we can have only one control plan, I have to register all the Data points under one Control plan and once the Analysis Result generate all the Data points comes in the Analysis Result. So the all data points in the Analysis Result are not relevant for a specific party.

 

 

Is there a better way to setup this scenario?


This topic has been closed for comments

1 reply

Badge +1

Were you ever able to figure out a solution to your issue outlined above?