This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
Assume a manufactured inventory part with a purchased part in product structure with routing operation work guidelines where we connect an attachment via the Object Connection Transformations window.(which adds the document to the work guideline as a link)On Shop Order window, when we RMB>Reports>click Work Instruction…Check box Print Attached Documents> ticked, Work Instruction is printed for Shop Order, but Attached Document is not.
Hi,Wondering whether the barcode device could be used for scanning Op ID (barcodes on shop order work instruction). This barcode device is already configured for IFS WADACO already.Thank you.ZR
Hi Everyone,Could anyone please confirm when have created a forecast on 31st of this month and it is in PTF. After running MS-Part 1 system has created the supply on 31st which is getting balanced with the same quantity of customer order but I want to understand why system has created one more line on 1st of the next month. Refer ss attached.I want to understand the logic or business requirement for this. Thanks in advance.
Upgrading from IFS8 to IFS10 UPD9. User see following error in IFS10 when try to use the function ‘Copy costs to cost set one’. IFSAPP can perform the task successfully.Can someone please help me what settings i am missing in this scenario for the user to perform his job. Looks like i need to register this task somewhere but i have no clue what to do and where.
Hi,For one of our user reset current view does not work corect.When the user try to Reset Current View or Reload Configuration it will not set the same settings as base profile that the user is connected to, Do anyone have some suggestion on how to solve it? It is working for other users that are connected to the same base profile./Magnus
Hi Everyone,We are currently in the process of reviewing the Material Review Board module on IFS9.Was just wondering what the benefits of the MRB module are? And how anyone else has successfully enforced the module within their company. Are there any training document that we could use within a test environment?Many Thanks
Dear all, very simple question. I would like to reflect the already reported time on the operation in APB. It works when the Adjust functions are applied (prioritize already reaported, preserve the sequence of the already scheduled), otherwise APB is showing entire lead time of operations. I do not like to use any Adjust functions, sice bot are applied to all operations which is not requested. Is it any way how to do it?Note: IFS 7.5, version of APB 2.6.1.0. I tried to find any LCS solution/bug, maybe I missed the appropriate fix. Thanks for any advice. Best regards,Zdenek B.
For a shop order with material completely issued, when the materials are unissued to a different location, UNISS transaction is created to the original issued location and not to the location to Unissued which is selected above. System does not directly transfer the materials to the selected un-issue location without having internal transfer transactions.1. What is the business value of these internal transactions?2. Here, two transactions are created even without the Shop Order reference. It looks like the material movement has been done within two locations which has not actually happened in the business. How to explain this behavior from business perspective?
morning can any help shed some light or even a guiding principles in what direction to set (backwards or forwards) when scheduling shop orders ?I understand how each schedule direction effects the start and end date but am unsure of when to use either direction.currently we use backwards scheduling for all shop order but we have an arrear of shop order going 4 months into the past.To me logic says forwards scheduling because you can not start a shop order in the past so why plan it in the past, but i could be wrong.Appreciate any help/ advice or opinion on this topicregardsJamie
Hi we are using Apps 10 and have recently connected the material to the operation but have had issues with shop floor operator inputting an extra digit and over issuing material (in this instance it was paint) to the operation.is there away you can prevent this or even better set a tolerance of allowable over issuing for example a maximum of 10% of the required usage can be over reported?regardsJamie
Hi I am using IFS Apps 10 and trying to pre-define were material is reserved and issued from. On the product structure i have set the ‘Reserve/ Issue Method’ to reserve and Backflush but this reserves material from any available location. Am i correct in thinking for it automatically reserve material from a predefined location I need to input the location in the ‘Reserve/ Issue from Location’ tab?If this is correct would I also need to define the ‘Default Location’ on the component inventory part as the same location so when the component material is received into stock it will automatically suggest locating the material into its default location? kind regardsJamie
Hello I have recently noticed that our IFS Apps 10 is scheduling operation out of sequence, as below op 30 ‘Inspect and NDT to checklist’ has a planned op start date of 30/04/2021 which is 3 days before op 10 ‘Tack’ up is planned to start 05/05/2021. I have looked at the routing below for the part and can not see anything that jumps out as being out of the ordinary and the operations are in the correct sequence. both work centres are set up using Finite capacity, utilisation set at 100% and concurrent operations set to ‘Allowed -group start in sequence’ as below.does anyone know what could be causing the system to schedule out of sequence? regardsJamie
Hi, In APB, I would like to set that that Shop order B cannot start before shop order A. This for the simple reason that Shop Order A produces material needed in shop order B. It’s al fine with the need dates, but as soon as we start rescheduling, the system does not alert us if we schedule shop order B before A. Also, the system will do it himself if we let him schedule. Can this be avoided? Best regards
Hi,We have recently added a second shift and I am trying to schedule shop orders for both shifts, however I have only been able to get APB to schedule orders on the morning shift.Steps I have taken:New calendars created for morning shift (6am - 2pm), afternoon shift (2pm - 10pm) and entire day (6am - 10pmWork centre and applicable labour class linked to entire day calendarEmployees individually assigned morning or afternoon shift calendars I am sure I am missing something simple, hopefully somebody in here can spot it :)
Hello, could someone please point me in the right direction for training documents, webinars or videos that may help with Demand Driven MRP setup and functionality. Thank You
Hi I am fairly new to IFS Apps 10 and would like to know how to stop operations from scheduling to start in parallel in the same work centre? Within this work centre we only have 2 shop floor employees and have tried to replicate this by setting the ‘resource quantity for calculation’ 2 and set the ‘capacity calculation bases’ to group.How do it get it to schedule so the same operation doesn't plan to start in parallel?regardsJamie
New to control plan module. If my control plan is for part only and not process could my control plan be tied to the part regardless of work center? We have parts that we run on 6 or 8 different work centers. A lot of work when you have as many parts to set up as we do.
Hello- Can anyone confirm that this ‘unit cost’ is (or is not) the statistical value per period (in a weighted average org Apps10)? Best-Christy
Hi, We have quite recently started with IFS and i am working with projects and tasks.We use tasks to report project time on however we struggle a bit if for example the designer can start a few days earlier than what we agreed on, and want to register time ahead of the activity start. Can you somehow use the offset function but with a negative number? So we do not need to change the activity early start and change the Gantt schedule? Appreciate all the help i can get./John
How’s user (IFS ID) connected to Employee easilly? I would like to make sence userid, person and employee. Regards; Yasuda
We are planning to ‘Automate Pick, Pack and Ship’ operations. Does IFS support this functionality? If yes, can someone provide any related information/documentation?
It looks like Invoice Status are slightly different between IFS9 and 10.We have noticed that in IFS9 we have “Not invoiced” and in IFS10 we have “Notinvoiced”.We upgraded from APP9 to APP10. For example, we have some searches that are based on that field (text), and because the Status text is not the same, the search return no values.Is this possible to edit, the status text in IFS10, to be exactly the same that we have in IFS9 today?
I have defined the following; I know that I need to define addition «FACT Item IDs»My question:Where in the Business Reporter can I select now the new parameters out from the view «SO_ACTUAL_COST_DETAILS_UIV»Here I cannot find anything. Thanks for help
Maybe better to ask, “how is Lot Batch Master” and the Expiration Date field within supposed to work? How does Expiration Date load? I have shelf life setup for the item. Looking at the view, raw data, I see Best_Before_Date does have a value, but Expiration_Date does not.I am trying to understand how IFS works. We need to use an expiration date for our product and thought Lot_Batch_Master was the way to go.For what it is worth, Inventory Part in Stock record does have the Expiration_Date field loaded with proper shelf_life calculated date.IFS version 9.17
I want to know how the Total Est Level Cost is calculated in shop order estimated cost?The product is weighted average costing based.