This will include the questions related to Enterprise Service and Assets Management, Asset & Product Design.
Recently active
Hi IFS Guru, Can anybody enlighten me on the following scenario: I m creating PM Action on piece of an equipment without Work Task Template, need to put some information about craft man hour etc. I can visualize that once Work Order is generated from PM Action, you can go and put steps, material and man-hour for each steps. But this will create a lot of work for the planner, to go and amend all the Work Order with the required info, is there any work around by putting all these detail without using Work Task Template ? I am using IFS Cloud Version R 22.1.1 Shez
Hi All.I’m using IFSAPPs10 UPD17 and we are thinking on upgrading to IFS cloud. is there any material (word, slide, pdf) comparing the IFS cloud x IFSAPPS10?EAM, lobby, solution etc.Also pointing the improvements like change site of the serial object while moving.Tks a lot.Br.Lopes
How can I put these two fields from the attachment screen required?
How can I change the this bar title?I want show Request Id instead of Task Id.
Hi All, is there any way to not include a resource group in the MPB scheduling as the same for the individual resource?E.g. I have a work task with 4 groups in demands, but just one group should be assign in MPB, the person in this group will receve in mobile and the others are just assistants.There is this option for individual resource, but is there anyway to do this for the resource group?I need to include the others group in demand because of the planning hours and costs. The leader of the task will register the time report for each of them in mobile device.Tks a lot
Hi IFS Guru,I am trying to create Fault Report (FR) on the piece of an equipment , selected the equipment, site and item class is connected to Equipment so it is auto populated, when in the “ Fault Information” section try to select “Symptom” is not appearing as drop down menu, is there anyway to connect Symptoms with the equipment type so that when the equipment will be selected in FR respective symptom should appear. Appreciate your help on this matter. Shez
Hi All!Is it possible to make all WO of MP visible in the tile of portal maintenance engineer as non affected?Thank you All
Hi all!We are using the maintenance engineer portal to create maintenance tasks.Do you know when do I need to provide information on those fields on resource detail page?Is there a link between this field and the LoV of resources groupe. The resource group LoV is not rising up when the field (Site & Org main) is not filled.Thank you
Hi,I would like to know the real business reason of why Category objects are not included in PM actions.For example, let’s assume I have a Solar farm and I need to Group all panels by adding this as a Category object so all solar panels can be inspected other than defining separately each.Then I add this category object on a Service Contract but here I could not create a PM action so that I cannot create regular work orders activities for this objects? Instead we can include a category objects in a work order though its not possible in a PM then we need to add Contract details each time in work orders which is not feasible?I understand that this is possible if the Solar farm is defined as a functional object setting the relevant object level. Then please explain how exactly we can use this function with some actual business function? Best Regards,Kasun
Hi I would like to used QRCode that point to IFS screen The url a catch does it change or it never change ? if it often change what is the solution ? Regards, Thanks
Heavy Maintenance Contract for Non-Routine ManagementKey steps in the process• Define Heavy Maintenance Contract with relevant information• Connect Heavy Maintenance Contract to Maintenance Order• Connect Heavy Maintenance Contract to Maintenance Events• Release Maintenance Order• Report Non-Routines from Work Tasks (i.e., from Execute Work Task page)• Add corrective task cards to Non-Routine• Set Non-Routine to Under Preparation• Create Sales Quotation • Get Approval for Sales Quotation• Release Non-Routine• Generate invoice preview for Non RoutineSteps Create Sales Quotation and Get Approval for Sales Quotation are explained in detail below. Non-Routine Approval integrated with Sales Quotation FlowWhen Heavy Maintenance Contract is used in heavy maintenance execution, if planned material and resource demands exceed the agreed upon cap values (price cap and/or quantity cap), and “Commercial Approval Needed” field is enabled, customer approval is needed
Hi,in work task with workorder connected to projectis it possible to have invent order by default instead of project order ?because my stock is not on project.Regards
It would be nice to have the ability to choose to define a maintenance document reference, revision number and revision date on the maintenance order that would then be spread to the work tasks. This would allow the engineering or planning groups to define what the current revision of their reference document is when creating and starting the maintenance work. Keeping that information on each work task will then allow the technicians that perform the work to know at a glance which specific documents and revisions they should be following to complete the work. Technicians would also need the ability to modify these reference fields in case of a mismatch or error.
Hello,Has anyone faced the issue in apps 9, the search field in a wizard not lasting till next time, it always gives a new search wizard, without the previous memory? This is not common for all the users but this is not user friendly for a planner that he has to enter the data every time he comes from a different page where else the standard functionality would allow you to see the searches from the previous day as well.Any suggestions or feedbacks?
Hi All,I’ve tried to close a task and WO related to the tile terminated but I can’t decrease the value of the tile. Do you have an idea how to bring to zero the number of the tile “terminated”?.Thank to all your kind idea.Andry
We have found an issue when we create a Customer Order that originates from a Business Opportunity.When we change the quantity, it will add another line of discount and doubling it. Business Opportunity created for 2 units and converted into a Customer Order: Changed quantity to 3 units and get this pop up (the first 25% discount comes in automatic from the Customer Agreement?): Now line level shows 50% discount instead of the 25% mentioned in the agreement: When I right mouse on the line and go to Order Line Discount, I can see 2 lines now - 1 for agreement and 1 for manual? Doesn’t matter if we add and deduct the quantity, an additional line will be added? Is this a bug or a setup issue in the Customer Agreement? Thanks,Michael
Hi, Is is possible to générate maintenance plan with earliest date 15j before due date ? the line is uopdatable manueally but we would like to have it automatically 15j before due date.and lastest finish = due date does it need Event ? or a parameter coud allow that ? Regards
Hi, What's the trick to get serials in this screen. The part has valid serial numbers that have been shipped and or in stock. Anyone have a VIM guide? Like how does VIM work / Fleet Asset Management work. It’s not “uber” intuitive.
I wonder why not all PMs are shown in a planned resource in the Resource Analysis window:Planned TasksPlanned ResourceSecond PM:Planned TaskPlanned Resource Now in the Resource Analysis for this defined resource only PM Action 14428 is shown:Resource AnalysisWhat needs to be done to get a proper snapshot? RMB “Refresh Snapshot...” doesn’t work :(.Thanks in advance
Hi, There is an issue in generating Order Report in APPS 08 and it is getting executed when tested from backend database. Any help is appreciated. Thanks,Dhanushya
Hi, IFS has multiple asset related tools. Looking for suggestions on the following. I can’t get into details else you will know the client. Client has a vision for the future, where they have visibility to all assets, the content / configuration of all assets. Assets can be located globally. Assets would be owned by the client as well as owned by other agencies. Number of assets would be large, probably several hundreds of thousands. Vision is the ability to know the configuration of an asset before a service technician steps on site for a repair or enhancement. Part of the business is managing these assets in terms of service, upgrades, repairs. Knowing the configuration of all these assets would be very helpful for increasing up time (consider most assets as critical to the safety operation). Suggestions would be very helpful, I have my ideas, but that’s just based on what I already know. This will be for a future effort, so this would include IFS Cloud version / not limited t
When it comes to defining project deliverables, there is an option to create an asset structure (followed by a functional structure) and an equipment structure. What are asset structure (also functional structure) and equipment structure in a real business context? Can someone provide an example from the real business world?
Hi team,In the scheduled tasks, is there any way to set the current system date as the value for the above marked “From Date” field dynamically everyday?Thanks in advanced.
I have a Service Contract with a service line that has a Location as the scope.This location is connected to the customer of the service contract.Location has multiple Serial Objects connected to it.When I create a PM action connected to this Service Line, I can select any of the serial objects connected to my location.But I cannot generate any Work Order from this PM Action. I get this error in PM Action/Maintenance Plan/WO Generation Error note column.ORA-20110: PmAction.NOTASKGEN: No Service Contract found, Work Task not GeneratedLooks like the PM generation process does not find serial objects connected the location.Am I missing something in my data setting or is this a functional limitation?Thank you.
HiDo you know why i get an error when i accept the assignment in worktask ? I like to create an other visit. Ressource capacity Parent ressource capacityThanksregards
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.