Question

set resource group "not available for scheduling" in MPB

  • 9 May 2023
  • 0 replies
  • 52 views

Userlevel 5
Badge +12

Hi All, is there any way to not include a resource group in the MPB scheduling as the same for the individual resource?

E.g. I have a work task with 4 groups in demands, but just one group should be assign in MPB, the person in this group will receve in mobile and the others are just assistants.

There is this option for individual resource, but is there anyway to do this for the resource group?

I need to include the others group in demand because of the planning hours and costs. The leader of the task will register the time report for each of them in mobile device.

Tks a lot

 

 

 