This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
Hi, Is Unit Code sill available to set as a default in Cloud?In Cloud I am not finding Unit Code in the Defaults screen (Engineering PDM Basic Data).I have looked in both Could 21R1 and 21R2, different customer environments.
Think nesting. I thought I heard some rumblings somewhere about the development of a shop order on which you can make more than 1 part at a time. I do not mean byproducts or substitute products. Thoughts?
When I create an SPC chart, it seems that the system only considers the measurement result from result number one. Why isn't the average of all result numbers of a data point of an analysis taken into account? In my view, this should be (100+39+39+39+39+39) / 6 = 49.167 Could anyone please help me resolve this issue or advise me on how to proceed?
Hello,We are trying to add the following lot/batch to a shop order and get the following error message: We are not sure what the message means. It’s not uncommon that transactions exist for a lot. Any ideas on what to check would be great!Thanks!
All, I am having trouble understanding how IFS comes up with the average issues over a period. Our periods are set by month. I’m attempting to view the average issues and receipts for period 1 of 2023 (January). IFS indicates I’ve done a qty of 1219 in that period. However, reviewing inventory transaction history, I am only seeing 1170. Is there another location in IFS that also determines issued qtys? The help doesn’t seem to indicate any specific location or even the transactions it considers to be issues (Counts, Shipments, etc.). any guidance would be greatly appreciated.
Hello Community,Currently, the production planning department has a very interesting question.They want to know (and of course see in IFS) how long a shop order will block a certain physical production area.Example: Shop Order 12 occupies all of room B and one-fourth of the production space in room A. The scheduling of the production area is of course also related to other shop orders and can therefore not be assigned to the article in a fixed manner.In other words, another resource that can be assigned to the Shop order and is focused on the shop order start and end dates would be required.My first thoughts were on the work centers. These, however, are less flexible because they are assigned to a operation in routing.The concept to (mis)use machine utilization for this, given that we don't use machine hours, also originated in the department. Do you have any implementation suggestions? Or is there a module we are without? Thanks for your inputs! Best, Lidija
How is the duration of a downtime clocking calculated? Is this determined by the calendar on the Work Center, the Manufacturing Calendar on the Site, or something else? Is the available/theoretical capacity of the Work Center Resource accounted for?
Community, after shop order splitting, the production line no is missing in the splitted shop order. screenshot see below, is this a bug?original shop order qty 3, you can see production line 10split into total 3 ordersyou can see the production line no is missing for split orders
A developer created this menu “Armony – Insert Project Demand lines”I created the "RU_PILOT" role which gives access to this menu.Then I added the role "RU_PILOTE" in the role "RU_RESP_DE_PROJET_AFFAIRES" and "IFS_ALL".The user who has IFS_ALL sees the menu while the user who has RU_RESP_DE_PROJET_AFFAIRES does not see it and I cannot understand why.
Estimate Bid Management I have a basic understanding of how this works and that we can create a business opportunity in CRM. I also recall, that in an earlier version, that I could create a sales quotation from the estimate. But for the life of me, I cannot get the same results in the Cloud Test Environment. Any clues? Thanks!
In order to prevent shipping due to a variety of reasons, we may manually block a customer order. Manually blocked orders do not allow pegging or reserving which interrupts the workflow for production and shipping/receiving. We still want to be able to produce the shop order, pegging it to a customer order and reserve the completed lot to the order, just prevent it from shipping. Is it possible to allow manually blocked customer orders to be pegged and reserved?
Community,I think I have enabled all projections in permission set about Engineering Part & Part Handling, but I still get this error when running Create New Part in below window. May I know where I missed?i can create new engineering part, but if i do from Create New Part button, i got below error.when I select Create New Part button, i got below error.
Is it possible to add an additional Handling Unit to an existing MRB case? If it exists, I have been unable to find it.Handling unit contains the part number, lot number.
I have looked at the closed topic on Availability Control but I still am not able to see who changed the part numbers Availability Control ID.Any help? The logging is turned on but I can’t search with the part number or anything. Would like to see who changed it to the current value.Thank you
I have checked the Configuration Characteristic and the value NO is there…Where else should I check?we are on Apps10 UPD14
On an inventory part, under the Revisions tab, we have old revisions that are still showing with a Product Status of “In Effect” when they should be “Not In Effect”. I’ve double checked the following:The Phase Out date is passed Product structures tied to that revision are retired - obsolete There are no alternates on these product structure revisionsWhat else might be causing the Product Status field to be “In Effect”?
Hi, after I release a DOP (all SO’s and PR’s created in a released status, inventory reservations made), I make a new PO (unreleated of the DOP). However, the part from the new PO is also something I can use in the DOP structure. Is it possible to net again the released DOP? What will happen with the underlying DOP orders, as we now have a part in stock so the underlying orders are not needed anymore? Thanks!
Historically our company has tracked what we call ‘as required’ qty in engineering BOMs typically for materials used in the manufacturing process (epoxy, paint, etc).In IFS, the design engineers will put a qty .001 (a convention we invented) meaning that the exact qty is unknown at design time, but will be updated by a manufacturing engineer when the actual amount of material needed (ie 2 gallons) is known.We want to move away from the .001 for some technical reasons. Is there an industry standard way, supported by IFS, to handle this type of scenario.
Hello all,I am looking for a way to analyze data and generate an alarm when a process is going in the wrong direction. We currently have Control Plans setup for all manufactured parts. Variable measurement checks are setup on each. We have specified Outer Min, Nominal Value, and Outer Max values.I was testing the use of SPC in IFS and defining UCL, CL, and LCL values that are within the Min and Max values. When I create the chart I do see the alarms. My question is, is this the correct solution to achieve the desired results, or should I be leveraging another feature (Inner Target Cp/Cpk)? Any guidance would be appreciated!
Hello everyone, While using the tool Shop order multilevel material availability i noticed the column (Minimum simulated start date) first i thought it represents the latest date where you can place the order taking into account the lead time (purchasing or manufacturing) But while running the simulation, i had this: running date : 13 aprilThe system gives me minimum simulation dates in the past which is wierd because even if you take the lead time into account the date will still be not in the past. Is somone familiar with this problem or might have another difinition of the minimum simulation date!Thank you in advance
Hi All, We have excess quantities on one DOP order ( Eg Purchase Order of Supply Type DOP), I want to use that excess quantities in other DOP for same part with same purchase order. Can we accomplish the same in DOP, if yes then how. Using Apps 10. Thanks All, HA
Does anyone know if there will be a new version of FMEA in Cloud that will be AIAG & VDA compliant?
Cloud 22.2.1.When splitting a shop order, users cannot enter the Order Number for the new order as they could in Apps9 and Apps10. Is this working as designed or is it a bug?
Hei I am wondering if anyone knows how to assign work leaders to a work order? Is this functionality gone and replaced with assign work to the various work tasks?
Hi, We set up control plan trigger with Time schedule of 8 hours, but when process purchase order receipt in three days, only one purchase analysis had been triggered as below snapshot, but other two days not, please help to check what is the reason for that? Your quick response is appreciated.ThanksSusan
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.