Can someone please explain how MS Level 0 and "Sales and Operational Planning" interact with each other . I found an option to export the forecast to MS Level 0 . What is the purpose of this ?. This is to disaggregate the forecast to connected MS level 1 Parts and to plan the actual Manufacturing/Purchasing? If this is the case what is the point of importing the Demand Planner Forecast ? Or to simply Calculate the RRP load ? How the operational plan affects the actual Manufacturing/Purchasing?
We are currently working with IFS Cloud (23R2) and have a requirement to add an additional column to the ‘Print Pick Lists’ window by creating a new custom attribute. However, we have encountered an issue: we are unable to locate the entity ‘PrintPickList’ or the corresponding LU in the ‘Entity Configuration’ window. Additionally, we attempted to create a new entity named ‘PrintPickList’ in the ‘Entity Configuration’ window, but encountered an error during this process. Could you please clarify if it is possible to add custom fields to the ‘Print Pick Lists’ window? If so, could you provide guidance on how to achieve this?Alternatively, is there a possibility that this functionality has been disabled for this specific window?
Hi I was wondering if there was a standard process for dealing with First Article Inspection. I was hoping for something that would inform users when a product is finalized and the shipment is coming in. Thanks.
Hi, When 2 separate employees are trying to report to a same shop order operation from Shop Floor Workbench at the same time, one employee is getting the below error.There can be situations where more than one employee will be working on the same shop order operation at the same time. Therefore, it seems that this error is not quite that much valid.Is there any way we can avoid this error, and allow more than one employees to report the same shop order operation at the same time ? Thanks,Thushitha
When creating a Purchase Order, I have a part with the correct description but when selecting it on the order line, an old description populates. Is there something I’m missing that need to checked and updated? The LOV from the PO line has the correct description (pic1) but when selecting that same part, it shows an old description (pic2)
Hi all,do we have any chance to create a demand and issue configured parts (DOP) from project?Any workaround or tricks that can be shared as we receive this error message: Thank youKRF
Hi all, I’m looking to visit a business, to gain insight into how other companies are using IFS within a Manufacturing Maintenance background,. Specifically at the moment, looking at Planned Maintenance planning. We’re based in Doncaster, UK so preferably within the UK. Our Company produces Plastic parts and underfloor heating for the Plumbing industry, Any help would be greatly appreciated - TIA
Hi Experts,Can you please share some reference documents on Disassembly Shop orders (Order Type) and Background to it.Can it be used for Servicing the Csutomer Owned Products like Engine. MRO Solution is not part of the Scope so, we are planning to Disassemble and Repair it via Shop orders.Appreciate your help. Thanks !RegardsLokesh
I think in discrete manufacturing industries, there exists a very similar requirement as described in https://community.ifs.com/ideas/shop-order-material-transport-tasks-53431 . We are an industrial equipment manufacturer with several hundred employees in the shop.The shop is very diversified, with welding, machining, inhouse assembly of mechanical, hyddraulics systems or electrical control cabinets.The different types of shops are in different buildingsAll shops are structured with several workcenters. Every workcenter is a collection of several physical workstations.The warehouses are also distributed in a range of several km.Same parts can be stored in multiple different warehouse segments, sometimes close by the requesting shop, in the main warehouse or even in the outdoor storage.Due to this structure of shops and warehouses, we have implemented a CRIM to support the process as described in this idea.Process:in general: request - pick - pack - transport (+issue) - receive(+issue)
Hi All,Does anyone know if there is a way to apply authorisations for standard Inventory scrap process?We’re using Apps 10 Aurena.Thanks
I want to add a custom field where ı marked in blue. The entity of this page does not show in the entity configurator.How can i add custom field to orders field?
Hi, We would like to ‘pre-pick’ materials: for certain shop orders, all materials needed should be moved from Location A to location B. The actual picking happens after that: We pick from location B and the material goes to WIP (=issued) How can this be done? Can we easily create for example transport tasks to move all materials for a shop order/shop orders from location A to location B? Thanks!
Can we do the search in context in prod9 also in the cloud? Is it possible?
Hello everyone,I've reviewed the available topics and I'm unable to find a clear answer to a question I have. We have a list of 24 items that we need to use as Non-BOM items. I would like to know if there is a way to prevent those parts from being moved to Shop Floor Inventory locations. I only want those 24 items to be restricted from those locations.It would be great if there was a way to set limitations in the inventory part/product structure or at the inventory location level. However, I would be satisfied if I could have some form of AVID set on those parts to limit their movements to shop floor locations. Thank you very much for your help.
Hi, I’m trying to use APB with Laborclasses and i had an error like picture in attachment. How can I fixed that ?
When calculating items costs in the background, item costs are calculated only for the structure alternative * and routings *. Is it possible to set all other alternatives to be calculated as well?Thank you in advance
Hi all, I am reaching out today, as a unique issue has come up regarding the supply chain department, and I am not sure if there is any current way in IFS to address the issue presented. We are currently running IFS Apps 10 UPD 22. We are an MRP shop, so all demand is run through MRP and we process Shop Orders and Purchase Orders in the system. Our supply chain team was recently notified that one of our customers is moving to a “market place” system that all ordering should be done from. In the past with this vendor we would simply use MRP and create/convert PORs to POs. The new system essentially rips all of that out of our hands and is to be done on their platform. We would basically receive the product in and pay the invoice, but have no Purchase Order.The vendor has stated that we do have the ability to download the info from they system to an XLS/CSV, but I do not see how that solves the issue for us. If we manually create POs in our system, there is no connection to what was orde
I want to force an approval or signoff of an operation before it can move to the next operation?Any suggestions? Thank you,
Can having alternates of a product structure revision affect the ability to transfer a new engineering revision, thus creating a new revision of a product structure?
I have one raw material. Based on testing, this raw material can be classified into 3 different groups with one group being the base material itself. Each classification is then used in three different end products. The different classifications are specific to its end product. How would I manage this in IFS?
Hi,I need to develop some integration tools in python and PowerShell that needs to communicate with IFS Cloud through API calls. Does anyone have any sample code (including the generation of authentication token) that I can use as a starting point?Thanks!
All,I am working with a client that needs a second overhead rate on the labor class that is based per hour. I know I can define additional labor overhead cost elements but they are only allowed to be based by unit produced or as a percentage of labor.Has anyone figured out a way to get the second labor overhead rate to be per hour? No, I do not want to do a calculation to figure out a rate per piece based on the standard labor hour of the item as that does not account for variations in actual hours during production. Nor is it a percentage of the total labor .Thanks!!!
Hi Can you create a lobby tile from a saved search and if so how?
Hi,In the Reserve and Backflush visualization dialog box I cannot see the available quantity.However, the this inventory item is in stock and if I select manual reservation for the SO material line I can see the stock lines.In the SO line, inventory part is in stock, and both windows' part ownership is company-owned.What could be the reason for this?Thank you in advance.
In 23.2.9, we are not able to connect a material requisition line to a non conformance report.It seems that in the object key ref, the key order_no is missing. So, we cannot search for a material requisition line from the material requisition number. Conversely, when trying to attach a NCR from the material requisition window, we got an error message. Hereafter are the parameters of the object connections : Any idea regarding this ?