Employee A is a shop floor workbench user.
The primary labor class is Labor Class A, which has a defined cost of $10 per hour with no overhead in the Manufacturing Labor Class Cost Tab.
Use HR schedule - Yes
The company details - use employee labor costs -No
Site settings are configured as follows:
On a given day, if a shop floor employee works 8 hours at the normal rate (which is $10 per hour) and an additional 3 hours of overtime (at a rate of $10 * 1.5 = $15 per hour),
Is there a way to input this overtime rate for the cost calculation of the finished good? Currently, the total of 11 hours is calculated at the standard rate specified in the labor class cost tab.