This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
Here are the scenarios we are trying to address. Parts referenced in the scenarios:Manufactured Part = sales part 3000 (manufactured from a shop order) Package Component 1 = inventory/sales part 2001 Package Component 2 = inventory/sales part 2002Package Part = package part 2000 Package Component 1 = inventory/sales part 2001 Package Component 2 = inventory/sales part 2002 Scenario 1A tech needs part 2000.Part 2000 is added to a customer order. Parts 2001 and 2002 are shipped to the tech.Scenario 2A tech needs more of part 2001 but does not need part 2002.Part 2001 is added to a customer order and is shipped to the tech.Scenario3Part 3000 needs to be manufactured and delivered to a customer.Part 3000 is added to a customer order. A shop order is created and parts 2001 and 2002 are added as material. Part 3000 is received from the shop order and then shipped from the customer order.Scenario 4In the future, part 2002 is replaced by part 20003.Part 2002 would need to be removed as a com
When attempting to run APB, the application crashes. Administrative assistance has already been taken.Kindly see the attached imagesSteps:1. Navigate to APB > ok2. open window3. APB crashes Has anyone else experienced this issue?If so, could you please advise on the possible cause and the next steps to resolve it? Prabashwari
In shop order workbench what does it mean when 'Unregistered downtime' displays next to Manual filter by ?
Hi Community,Looks like “Shop Order By-Product” supply is ignored by MRP when Shop Order comes from DOP (configured).MRP is creating a supply proposal for later demand even though projected qty is enough (scr below).By-Product line was added manually to the Shop Order, “Include in MRP Supply” field is checked.If the same Part is added manually to the non-DOP Shop Order, it is visible to the MRP, supply proposal is not created.Any suggestions or opinions? Looks like a bug.Regards, Lukasz
Hi everyone,We’re currently preparing our migration from IFS Apps 9 to IFS Cloud and are looking for insights from others who have made this step — especially around the transition from Project Delivery to Project Deliverables.As most of you know, Apps 9 supports only Project Delivery Apps 10 includes both Delivery and Deliverables IFS Cloud supports only Deliverables There’s no direct migration path between Delivery and Deliverables — except by moving through Apps 10 and phasing out one while introducing the other.We would really appreciate hearing about your experiences: How did you approach the transition from Delivery to Deliverables? What lessons did you learn (in terms of setup, data migration, and ongoing operations)? Did you identify best practices or specific pitfalls to avoid? Our current line of thinking:Based on our internal and project migration concept, we believe a smooth migration is mostly about data readiness and timing, not about custom scripts. Key principle
The access to expense sheets is controlled by “Position – Access Setup” in IFS. This way, a project manager will be able or not to visualize the expense sheets connected to his/her project depending on the position of the employees. Customer would like that a project manager could have access to all the expense sheets that belonged to his/her own project. The only way knows to achieve this target is enabling all the project managers the access to all the positions. But, if define this way, all the project managers could be able to visualize every expense sheet of any employee in any project, even if they had not access to the project. Customer have tried to define a new “access attribute” adding as a column name a custom field, but it is not included in the value list. Also have tried to define as the “old value” in the “access attribute” a select sentence, but it is considered as an invalid value when try to save it.cannot use an event either because all want is to visualize, not to m
The problem arises when engineering part revisions need to be controlled across multiple sites, alongside Inventory Part Revisions….. Example revisions below. The flow involves several locations, where one site supplies products to another. The Planning Network MRP triggers the generation of a Distribution Order to facilitate the shipment of products between sites. The receiving site treats the incoming manufactured items as purchased raw materials. Therefore, upon release of MRP Planned Distribution Orders, a corresponding PO is created for the receiving site and customer order created at the sending site. A PO release from the receiving site, intended to receive today (11/3) will be created with Revision 3, Engineering Rev C referenced. However, the Customer Order does not reflect any requirement for revision control. The manufacturing site has quantity on hand from prior production of Revision 2, Engineering Rev B and will ship this inventory against the Customer Order. When attempt
Hello, My client uses both DOP and MRP for his manufacturing.Configured parts are managed with DOP. Not configured manufactured parts & purchased parts are handled by MRP. Example :TOP PART - Configured - DOP→ COMPONENT1 - Purchased - MRP→ SUBPART - Manufactured/Not configured - MRP → COMPONENT2 - Purchased - MRP With this, DOP will create a Shop order for TOP PART at DOP Release, and MRP will handle the creation of Purchase requisitions / Shop order requisitions should there be shortages. However, we discovered that when we create a DOP structure (DOP header in status “Unreleased”), and then run the MRP at this moment, purchase requisitions will be created for shortages.This is dangerous because the structure of an unreleased DOP header can still evolve before being released is case of customizations of a product for example.→ Is there a way to make unreleased Dop orders not visible by the MRP ?Thank you,PL
Hi All, In IFS Apps10 an error occurs when trying to modify Shop Floor Clockings of an operation because the resource assigned to the work center does not exist. IFS displays an error message stating that Resource PW21 does not exist for Work Center PW33. This is correct.However, the clocking was actually performed on Work Center PW21 and Resource PW21.When the error is debugged, it is identified that if the Clocking which is trying to modify starts on 9.00am 01/11/2025 and ends at 12.00pm 12/11/2025, the backend validation checks all clocking entries across the entire site within that time range. If any time is reported for a different Work Center than the one specified in the Shop Order Operation, for any shop order in the site, the system raises an error. Interestingly, the Workbench functionality in IFS allows changing the Work Center as well, which seems to contradict this validation behavior.Has anyone encountered this issue before or found a suitable workaround for it?
Parent - MP A (Manufactured), Component - PP A (Purchased)Both Parts are Lot TrackingInventory Valuation Method - Weighted AverageInventory Part Cost Level - Cost Per Lot BatchSteps Create a product structure for MP A with a quantity per assembly (QPA) of 1 pc of PP A. Receive inventory for PP A into cost bucket 110 at $2 per unit, quantity 10. (After issuing to the Shop Order, on-hand will become zero.) Create a Shop Order for MP A with a lot size of 10. Disable auto-close for this Shop Order. Perform Manual Material Issue for PP A to the Shop Order. Create the Lot/Batch. Receive the Shop Order and review the Shop Order Cost. Repeat the Scenario Using Backflush Recreate the same setup. Instead of manually issuing materials, enable Backflush for PP A. Receive the Shop Order and review the Shop Order Cost. Estimated Accumulated Cost changed to Zero.Is there a specific reason for this behavior?
I am using Cloud 22-R2: I want the Proposed Location on a shop order to automatically pull from the Inventory Part’s Default Location rather than the standard default outbound location defined for the Work Center.i.e. multiple products are produced on a particular work center - 99% of which are required to output to the standard post production, pre-shipping location which is defined as the default outbound location on the work center. However, there is one product produced on the same work center that I want to output to a different location - a location that has an availability control assigned to it. i.e. I want to assign a particular Availability Control to a certain part every time it is receipted from a shop order - I thought I would use a unique location for this purpose. I want to use standard functionality ideally, without the need for a CRIM.I know I can manually change the Proposed Location on the shop order or I can manually change the output location when receiving/appr
Is it possible for engineers to work across multiple sites within the same company and, additionally across multiple companies.I have a requirement for engineers to carry out work orders in this regard and have visibility of engineering stocks across all relevant sites / companies.Appreciate the answer to this will likely be down to setup, that is currently what I am struggling with. We are currently on Apps8.Furthermore, are the any pitfalls with regards to this that I should be aware of?Thanks in advance.
Steps to recreate issue observed in Cloud 24R2: Identify a customer that has more than 25 Address IDs. Navigate to Customer > Address. Expand Address ID dropdown. Scroll to bottom of list and click Show More - repeat until the end of the list is reached Count the number of Address IDs from the full list.Expected result: All customer Address IDs are displayed in the list.Actual result: Some Address IDs are missing from the list. In my example, the customer has 34 distinct Address IDs in the database, but only 25 are visible in the list. Can anyone recreate this? The workaround for now is to open the filter panel and enter the customer number in the customer filter - then all addresses are loaded in the list.
Hi guys,When adding components to the Consist Of Tab in the Engineering Part Navigator on IFS Cloud the Drawing Position No tab is mandatory and it’s always a “*”. What is the purpose of this Tab and is it possible to remove it if not in use OR set default “*” when adding a new component to the BOM.Thank youRegardsIna
Hi, Does anyone know the logic for IFS Apps 10 when running costing for one specific part status, how does IFS determin what parts to include in the run?In the background job it will show x nr of top parts where detected.The number here is much larger then top parts with the specific part status. Thanks in advance!Anna
Hi.We’re successfully created a custom note field on the Standard Operation page, with it being brought to other pages via expression/reference custom attributes as well. The field is called Cc Operation DefinitionWe’ve noticed the field only accounts for the data put into it when we use the “Reference” option with “Add Standard Operation” on the pages though, using “Copy” leaves the note field blank. In Shop Order, the assistant doesn’t give you the option to select between Copy or Reference, and the custom field appears blank: On the Routing page however, where the Add Standard Operation allows you to choose between Copy or Reference, choosing Reference populates the custom field with the data thats been added to it: How should we go about making the field populate via the copy option and in other windows as well where the option between the two isn’t offered? Thank you in advance!
We copied to cost set 1, had long list of items with the below warning!!**Part 00000 on Site 0000 has been manually removed from Inventory Part (Inventory_Part_Tab), but it still exists in Costing! Part is not copied.**Cost set one is matching cost set 2, and the part in live in INV parts. ??Thank you for your help in advance,
In the 24R2 documentation:The Update Processed Transactions section in the ‘About MCA’ page reads:“All inventory parts, no matter of inventory valuation method, will have their labor and operation transactions costs adjusted from this command.”The Update Processed Transactions activity in 5.5.9.1 Manufacturing Cost Allocation reads:“The transactions of only inventory parts that are having Weighted Average setting in the inventory valuation method of the Inventory Part page will be updated from this update processed transactions command.”EDIT: I figured out what the documentation was stating.
I cannot really find a clear simple answer as to the difference between By-Product and Disassembly Components and when to use each one. It would be helpful if there was a matrix with checkboxes on each describing what they can do. In general vocabulary terms, By-Product is usually an unitnentional secondary product where disassembly would be parts… but in IFS terms, what is the difference? Are there limitations of one vs the other? Labor / part cost differences? Other?
Hello,In production processes, after 5-6 operations, the finished product is produced. Depending on the company's requirements, each operation is managed as a new repair work order in IFS setups. The manufacturing material number does not change. In these production runs, the materials to be produced are tracked manually based on the assigned lot. This lot number remains the same throughout product production. In most cases, after a shop order has been partially received based on the lot size (the shop order has not been closed), production is attempted with the same lot number on a new shop order. In this case, while reserving a lot in IFS, a history record associated with the lot exists in another shop order, or when receiving it for production, but you cannot perform any operations, I receive errors. How can I provide a solution? Best Regards,
Hello, For a shop order with an outside operation, when it is released, a PR/PO is created! For a reason, the purchasing team delayed the receipt date on PO or the supplier confirmed a different delivery date. I have done some tests and the modification on PO have no impact on shop order scheduling. It does not modify Start/finish date of the following operations. Do you have an idea about please? and is there a solution? thanks
Hello,My Workflow cannot call OData Function AqEventBusTab_Default() (requires GET) — “Null value returned for key attribute 'Objkey' of entity type 'AqEventBusTab'” Base: https:///main/ifsapplications/projection/v1/CustomProjectionAqEventBusTab.svc Function: AqEventBusTabSet/IfsApp.CustomProjectionAqEventBusTab.AqEventBusTab_Default() A workflow service task using “IFS API” cannot successfully invoke the Default() function on AqEventBusTab.The same call works via direct OData GET (Postman/Python). In workflow, using “Action = Call” (POST) leads to an error: “Null value returned for key attribute 'Objkey' of entity type 'AqEventBusTab'.” It seems the workflow task cannot issue a GET to a bound OData Function, and calling it as POST causes the failure ?
Within the APB for a selected Shop Order we can see a list of the potential statuses and of which are applicable to it.However there is no way that we’ve been able to find that provides clear definitions of what each of these statuses actually means. If we use the Help button on this tab, it brings up the window below and if in the Usage section we click on the Show Status URL it provides no meaningful information. We can explain most of these statuses ourselves, but when our client asks specifically about what the INCOMPLETE status means we’re struggling to differentiate that with RELEASED or (especially) PARTIALLY REPORTED Can anyone point us to where we can find an official IFS document that explains exactly each of these Scheduling Status values represents
Hello,How to set up auto-incrementation for a field in a custom entity? I didn’t see any option available in the interface.I saw that it’s possible to use a number counter, but I’m not sure how to link it to a field of my entity through the interface. Thank you in advance for your help.
What are the recommended HW requirements for APB?When loading about 200 operations into APB, APB is fast, planning is usable.When loading about 2000 operations, APB is basically unusable. Loading is incredibly long, APB often "hangs" during work, often displays "not responding".APB works locally, so the performance of the server where IFS Cloud runs will probably not be possible to adjust.Tested on 25r1 environmentThanks for any response