Skip to main content

We use pegging in shop orders a lot, and having just started using the ‘projects’ section of IFS we are now in a position where we are executing our first builds. 

 

We need to peg a shop order (created through shop order requisitions) into a shop order material line that has a supply type of ‘project inventory’ but are struggling with this? Is this possible, or does IFS stop you from pegging to project inventory lines? 

@charh98 from the documentation on Supply Pegging:

  • Automatic and manual pegging cannot exist for the same supply or demand.
  • Only supplies with the supply code set to Inventory Order can be manually pegged.
  • Only demands with the supply code set to Inventory Order can be manually pegged.
  • The scrap factor on the inventory part is not taken into consideration.
  • The demands with the supply code set to either Project Inventory, Project or Non-inventory cannot be manually pegged. (Automatic reservations for though, are possible for parts in project inventory).

So it is not possible to peg any supply to a shop order material line with supply code of Project Inventory.