This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
Hello, I have one question regarding APB/MSO.When MSO will replace APB, will APB functionality still be available on environment (just won´t be supported anymore?), or will be APB functionality no longer available to our customers.This should happen during R2 release. Thanks a lot for any usefull answers.
Why is there a gap between the start date of a parent DOP Order and the finish date of its component DOP Order?24.1.1Site Mfg. Calendar = 24/7 with all dates generated through 2030.Site Picking LT = 0.Each Work Center uses calendar 24/7 (1440 minutes/day) with capacity calculated through 2/15/2025.Each Work Center has only one resource, valid from 1/1/2020.All QPAs in every structure = 1.All lead times have been calculated (manufacturing, purchasing, cumulative).DOP Header is for 10,000 lb and is the only source of load for these work centers.DOP Structure has been created but not released.Each part consists of only one operation in a part-specific work center running at 1000 units/hour, so each level takes 10 hours.CRP has been performed.DOP Structure, all levels shown are manufactured parts. DOP Gantt Chart DOP Order details CRP Load showing gaps I was expecting the four DOP Orders to be slotted for one day each from 8/29 back to 8/26.
Hi!We are having a problem when trying to create inventory parts for a new sales site, with the type code Purchased(raw).The master part is configurable, and it is manufactured on the manufacturing site.The manufacturing site has the inventory part created with type code manufactured.Routing heads and configuration structure heads are removed, so should not be an issue.When i try to create the inventory part for the site i get the error: We are running IFS Cloud 24.1.1.
Hi All, I’ve been looking at a scenario where Master Scheduling is being used in conjunction with Order Gap time, but I’m struggling to understand the logic of how MPS is generated. I’ve set up a simple example in my test environment (24R1) to demonstrate: Max Lot size = 10Order Gap Time = 1 (just to simplify - in reality this would be different hence why rate by period hasn’t be set up)Test 1 - Works as I would expect - the MPS generation stops at the PTF, so the system cannot keep the Projected balance positive and an Action Message is generated. Test 2 - However, if I split the forecast into 2 overlapping periods, the Order Gap time rule is ignored and multiple MPS/SORs are generated on the same day and the project balance is now always at 0 or above.If I add a large forecast at the PTF, I get a strange pattern, I think where each demand entry (forecast) is searching back for a free day, hitting the PTF and creating one SOR for the max lot size. However the overlapping demands are
We’re trying to include a Scrap Factor allowance for Purchased Parts so that when we Order some of them for use in a Manufactured Assembly, we can allow for the Scrap Allowance during the Purchasing part of the cycle not during the Manufacturing part.When you search on-line there seem to be 2 different formulae that can be used to calculate the Scrap Factor. The first is (Number of Scrap Items / Number of Completed Items)*100.Example: Demand 100Scrap Factor 20%(20/100=0.2)*100 = 20 The second is (Demand / (1-scrap factor) giving the equation Example: Demand 100Scrap factor 20%100/(1-.20)=125.We suspect based on our testing that when considering Scrap Factors in MRP that IFS is using the second of these 2 Formulae but can find nowhere in any of the Documentation that actually confirms this, can anyone help us out
IFSAPP10 UPD9 - We have an issue where when completing an operation that Receives into Inventory we can’t enter 2 different locations.Step one - approve Op and receive half of inventory to a location. Have unclicked Close Operation. Leave Report Time checked. Step two - approve op and receive rest of inventory to a new location. OK button will not become active. If I unclick Report Time OK is now active but I will receive a cost variance.Any ideas how to do this?
We get this error when clicking on “Finish” in Kanban Reorder Point Request form.Where can we give the rights to execute method [KANBAN_REQUEST_MANAGER_API.CREATE_ROP_REQ_SCHEDULE] ?IFS Cloud 22.2.5Application - CMD(1): Error: Must have the right to execute method [KANBAN_REQUEST_MANAGER_API.CREATE_ROP_REQ_SCHEDULE] to be able to create a new batch schedule.Application - CMD(1): Done finishCommand.- Must have the right to execute method [KANBAN_REQUEST_MANAGER_API.CREATE_ROP_REQ_SCHEDULE] to be able to create a new batch schedule.Application - CMD(1): Execute finishCommand for 1 record(s).Application - CMD(1): if({"expression":{"==":[{"var":"record.TaskOption"},"Now"]}})Application - CMD(1): > "FALSE"Application - CMD(1): action({"name":"IfsApp.KanbanReorderPointRequestHandling.TaskVirtual.ScheduleTask","projection":"KanbanReorderPointRequestHandling","bound":true,"params":{}})Application - POST: [object Object]Application - SEC_INS - (Server Application Error): Must have the right
Hello, IFS community!I was wondering if anyone knows a way to consolidate shop order pick lists? When I go and print shop orders for the warehouse, we have to manually write out a list of needed items to be picked from inventory. We find that it slows us down a bit, so wondering if there’s a shortcut in IFS where it automatically does that for us? Any help is greatly appreciated!
I have a case with a user who cannot retrieve any reports.Neither Report Archive under Infor Services or Report Archive Ordered by Me under Favorites. I have checked her profile and compared with a collegue who has access.I have instructed her to open run (Windows+R) and paste this code:cmd /c rd %localappdata%\Apps\2.0 /s/q.This in order to clear local app data.I have also cleared her profile locally for the Report Archive under User Profiles..Finally I have added her in the Distribution Group for her Sites.Nothing of this has worked.Can I have some advise please?Kind RegardsDaniel Långsveds
I have created an lobby who is counting the amount in a certain “Work Center No” but I want to have the number of an specifik “Operation Description” In this case only count TestingThis is the output.and this is the definition
Could someone point me to where I may find work instructions with examples for IFS site, production line, work center, and routing setup to support visual shop order planning? I see some general structure documentation on these and a few demos explaining new UI for Aurena, but I'd like to understand the optimum way to set up the architecture for our manufacturing sites & lines by referencing a step by step work instruction with some hypothetical examples.
Hi Who can tell me more about the critical path? How exactly is this determined? What is the basis? Lead times? Thanks for the help
HiI want to record a negative transaction for an operation on a production order. How can I do this? Best regards
Hi, im tyring to create a query for a quick report to easily export a list of characteristic values for variable part number, i cannot see how this report connects the object key from this view with the object key from the technical_specification_both table where the values are stored. i looked at this once before a long time ago and i recall i used an API could anyone help ?
Community,below part is serial or non-serial tracking in inventory/receipt and issue? I have only After Delivery Serial Tracking check box checked.
Hi, I need some advice.COPYING COST SET 2 TO COST SET 1. Without Capture Cost Sources set to “on” the material cost from the product structure (Bill of material) do not get connected via the connected object setting in the project. Any insight please. See word document attached. Regards, Sean.
Has anyone had any success with calculating the Cumulative Lead Time field? I’ve not been able to get it to work. I was advised by my previous employer a case had been filed, but there was never any resolution provided. This was a number of years ( and releases ) ago… This morning, I updated the purchase part lead times for some parts in a structure, and ran the Calculate Cumulative Lead Time job, but the cum lead time field in the manufactured part doesn’t update.
When we scrap material on a shop order operation, the “Scrapping in Operation” transaction is only pulling through the labour component of the scrapped part. From what i have seen all the cost buckets that make the unit cost of the part including the material should be included. We have rolled up the part cost and everything appears as it should be elsewhere. How do we configure the system so it pulls the material components into the scrapping in Operation transaction? Any advise would be appreciated.
We are looking to upgrade from IFS 10 to Cloud.Is it possible to use MRP to plan Customer Owned material in Cloud?If not, how are people planning Customer Owned raw material?
CześćNa zleceniu produkcyjnym chcę zarejestrować ujemną transakcję dla operacji. Jak to mogę zrobić.
I am working in the Apps 10 UPD 23 GCS IEE environment and I am trying to manage a Shop Order Multi-Level Repair Structure. I can get the structure to appear but when I RMB on any of the components in the tree, the component replacement selection is grayed out.Is this due to a permissions issue? If so, what permission should be granted to allow that function to be used? Thanks!!
We use standard costing and our product structures are defined accordingly. When we produce a product, say 1000 pounds of final material, the system reserves and backflushes the required materials based on the product structure.Given that our production is measured in pounds, it is challenging to predict the exact amount of material the recipe will require. We want to know if there is a way, after completing the shop order, to adjust the quantity of material used (either by adding or reducing it). This adjustment would allow us to see the shop order cost variance. Currently, we cannot see any variance as it always matches the standard cost.Is there a method to achieve this adjustment post-production to reflect the actual material usage and, consequently, see the cost variance? TLDR : Can we manually issue more material than the assigned quantity in IFS?Thanks
We currently use the "Receive Case" option at the Supplier for Purchase Part level, allowing us to receive parts into different options. Our process involves receiving the material into the Arrival section, inspecting it at Quality, and then moving it into Stock, which suits the Purchase Parts well.However, for shop orders, we're receiving them into Picking locations and applying an Availability Control ID to prevent the material from being consumed on Shop Orders/Customer Orders until after inspection. We're looking to streamline Shop Order Receipts by receiving directly into the Quality location and then transferring to Stock post-inspection. Unfortunately, when processing shop orders, the Quality Assurance location types aren't appearing in the Location No field in the Receipt window; only Picking locations are visible. Despite setting up the Inventory Part Default Location with a Quality location, it doesn't automatically appear in the Shop Order Receipt window.Are there specific s
Hi Everyone,When we search for “Manufacturing Structures” via the navigation menu, it is labeled as “Product Structure” on the page. Could someone please explain the reason for this?Additionally, could you please clarify the difference between a “Manufacturing Structure” and a “Product Structure”?Thank you in advance for your assistance.Best Regards,Sithari.
Hi all, I have been working on creating a migration job import new Functional Objects in IFS Cloud. I keep getting so close with a solution, but now am running into a new set of errors... it feels like I've tried everything. Any help is greatly appreciated.When I enter SITE1 into the contract field, the migration job doesn't recognize the input. That being said, when I enter SITE2 into the contract field, I get an error that I don't have access to the site - that tells me that the migration job is able to read the field but cannot recognize either SITE1 or SITE2 as being valid. I was doing some deep diving into the migration job and the Equipment_Functional entity and found something interesting...In the Migration Job source mapping, when I load Equipment_Functional.CONTRACT, it does not have the same attribute flags as other CONTRACTs, such as Inventory_Part.CONTRACT or Purchase_Part.CONTRACT (and Migration jobs with these CONTRACT fields work perfectly): Equipment_Functional ViewPu