Trying to create a new config field that would be obtained and calculated from another existing config field. I need the new field to do the following: Sum up on the contents of all records in Table AudAudit of field called Cf$MinQty and then get AVG Qty of the only the rows that are Not Null or Zero.
Hello community! We are considering use of DOP for our MTO parts. We have been experimenting with the DOP features and are stumped with the netting.Part X is DOP.In our scenario, we have 1000 units of part X in inventory that is not reserved or pegged to any order. My demand for part X is 5000 units.When I check in DOP, the system is still telling me to create 5000 units, and the DOP system has generated a shop order for this quantity as well.How do I get the order for part X to net against existing inventory and only release an order for 4000 units?I am currently working in IFS Apps 10, moving to cloud in early 2026.Thank you!Robin
Hi everyone,I’m working on setting up approval workflows for a couple of key processes and would really appreciate any examples or insights from the community.I'm specifically looking for examples (templates, screenshots, descriptions—anything helpful) of rolled-out approval workflows for: Creating and configuring new part numbers, including structure and routing setup. Controlling changes to shop order structures and operations, especially when they deviate from the planned alternates. If you've got anything in place—formal or lightweight—that works for you, I’d love to see how others have approached this.Thanks in advance!
Good morning community! We have a scenario where we have a sub assembly on our PS. We would like to flatten the PS to move the sub assembly components to direct components of the finished good eliminating the need to transact the sub assembly. This sub assembly that we want to remove from the PS is used in multiple finished goods (it is a blend of materials). We want the ability to see demand for the blend (sub assembly) but not actually schedule it or produce it unless we need to put it in barrels to be store in inventory (lot controlled).We have tried phantom parts, but they only seem to explode the materials in the shop order as opposed to the operations. We want both to be part of the finished good.We have tried putting the blend in our PS as a zero QPA, but had to set the component to ‘allow as not consumed’ to get it to work. This created an error because it is lot controlled (which it needs to be).And we cannot put both the sub assembly and raw components on the shop order
Hello IFS wizards, Just reaching out here to find out if its possible to generate a Shop Order/Req report that’s able to be interrogated from withing IFS, rather than the functionality we currently have that dumps the data into a printable report; I’m thinking it’s got to be possible because the report is pulling the data from somewhere, I just wanted to rather than dump the data externally and extrapolate from there, I can use IFS functionality and user interface to navigate to corresponding pages without manually typing numbers in. Any help would be gratefully welcome!Thanks all,Martin.
Hi All,We are trying to capture the user who reserves serials in a shop order. I do not see a field for this and it is not in the history log. Is there a way to capture this? Thanks.
Here is my setupI’ve got an activity with a start of 6/25 at 8 am and an end of 6/25 at 5 pm, it’s a 1 day duration and I have Resource 1 assigned for 1 hour on this day.I also have Resource 1 assigned to a project connected work order for a 4 hour task planned for 6/25 8 am to 6/25 12 pm, hours.When I select Resource Activity Load, I get the following, it is showing my Work Task planning, but it is not showing the planning of the activity resource itself.Next, If I go to Resource Activity Load Detail, I get the following, it shows .82 hours even though I have it planned for 1 hr and it doesn’t show the plan for the Work Task.I’m looking for help in understanding why these screens are like this and to understand how the system calculated .82 planned hours when I specified 1 hour on the activity’s resource plan. In addition, from the resource planning of the project, I see my 1 hour and 4 hour planned hours but when I select Resource Activity Load from this screen, I get nothing.If anyo
When Mach Run Factor and Labor Run Factor are in units/hour does this mean that the machine outputs 55 units/hour as well as Labor Run Factor outputs 55 units/hour?
Greetings!I just created a part number but forgot to add a digit. Is there any way to just edit the part number with out re-creating a brand new one all over again in IFS Apps 10?
Hi, The users are trying to update the tax code but are getting this error message :‘This record is now Active. You can only update the valid to date’ I have tried to inactivate this and the inventory part but that doesnt work. I cant find a valid to date? Any assistance on how to resolve this would be greatly appreciated. This is a new product for the business. Thank you
Greetings!I can see the definition of each action type for rules (IFS Apps 10) below, but can anyone put it in “kindergarten” terms what each means ?
Greetings!I am new to IFS Apps 10. When talking about the Part Configuration Revision vs. the Sales Rules, which one leads the other? I know they are both important, but which one would you say determines what can be picked?
Hello,I have a question regarding the Production Line. Why is the production line connected to the calendar as it is already set up for work center? What would happen if I put an “empty calendar” for the production line and the right one is correctly connected for the work center? What would be the impact?Thank you!
Today we use the operaton block function to block a number of operations from different shop orders into on operation block. It works.We now use the to a degree where the shop floor operator operates more than on operation block at a time.Is there a way to automated the shop floor operator time registrations between the two or more operation block?/Jørgen Eskildsen
Hi,We are in the process of upgrading from IFS10 to IFS Cloud.In the Upgrade scripts, we found a long running script in costing 2110.upg. This is caused by moving Cost set related data to the newly created cost set specific tables cost set 2 - cost set 11. I could not find any documentation in the release notes about cost sets 6 - 11, except in which has a note on slide 4 → “Part Cost Bucket Performance”.This is also mentioned in KB0069266 https://support.ifs.com/csm?id=kb_article_view&sys_kb_id=63f1ec64c3f99a1465365083e40131c3&table=kb_knowledge&searchTerm=part_cost_Bucket. Question is:What is the intention of IFS for the usage of cost set 6 - 11? In our solution we have defined our company specific cost set like 100, 200 and a view more. These cost sets contain > 100 millions of records. Therefore, we would like to make use of any performance gains possible. is there a possiblity to extend the concept of cost set 6 -11 further to the cost set numbers we are using in o
Hello,Can you tell me what the “Inventory value comparators” is for?thank you for your help
It is posible to run MRP so that it ignores Interim Order Demand and does not create Material Requisition?
Greetings!In my DOP Header, and I keep getting the following message about a Characteristic does not have a value. So I check in the Part Configuration Revision in FD Frame but all I see is below. How do I fix this in IFS Apps 10?
Hello, When I try to enter a broken number in the Qty per assembly field, it is not accepting rounded numbers.In the example, I try to enter a value of 2.8 kg, when I press the tab key it automatically changes to 28 kg, ignoring the decimal place.Has anyone seen this before?
We have an issue where a shop order with an outside operation has a requisition that has been converted to a purchase order BUT the PO has been cancelled. Even though the PO is cancelled, IFS won’t generate another requisition for this outside operation step. Ship WIP to Supplier is Visible because we’ve reversed the Ship WIP. Purchase requisition is still the cancelled PO.Line in status “PO Created”PO CancelledMRP won't generate another requisition for this order. I just ran it and did a search for my order ref 1 and this is the only requisition that shows up. The only way I can see to fix this is to uncancel the order in the DB.
Hi We are trying to find the best way to utilize IFS Non Conformance Report for working according to the 8D-method. This is standard in the automotive industri and we are obliged to document according to this method. Has anyone else done this and found best practice for this in IFS? We are thinking of a couple of alternatives: Create one action in the NCR, then create/process one CAPA for this but it doesn´t cover all the 8 steps. Create 8 actions in the NCR to represent the 8 steps in the method. Create CAPA actions for step 3 and 5 in the method if necessary. (It is a lot of steps/administration to handle each action) Create one NCR with one Capa, then create 8 actions in the CAPA.
Is there an option to flag a part/inventory part as a Non-Quantity Bearing Part? In Aurena 23I’m defining non-quantity bearing as:Can be included on BOMs (product structures) Does NOT affect inventory balances: No stock quantity is recorded No stock transactions are performed (Receive, Issue, Count, Move, Scrap do not apply)
Greetings!How do I add more options to my Configuration Structure Rules in IFS Apps 10?
As you know there are certain things you cannot change after a record is save. For example, you cannot change an inventory part’s unit of measure after the initial setting is made. Does anyone have a comprehensive list of things like this throughout the who system???
Greetings!I created a new option value ID under Config Characteristics below However I can not get to show up under the FD Model Option value ID in the Part Configuration Revision in IFS APPS 10