This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
Hi,We would like to connect several NRC’s to one CAPA - do you know is that possible? We’re using 9.14.Thanks for your assistance. Miia
We recently upgraded from Apps 10 UPD4 to Apps 10 UPD7 and it seems like there was a change in behavior in the Create Project Wizard. The “Copy Existing Project” box is now checked by default and we haven’t been able to figure out where to turn it off. Does anyone know if this can be unchecked by default? And if so, where?Thank you,Joann RMB in the left side of the navigator window or the bottom area of the window. Select Create New Project At the bottom of the the window 1/7 the Copy Existing Project box is checked by default
Hi all,Is it possible or in the pipeline to be able to navigate to the workbench with a filter. E.g.:$filter=OrderNo eq $[ORDER_NO]
Hi Guys ! I want to ask something related to IFS Development Tools in Visual Studio.How do I change the database connection when doing a Start Presentation Object Scan?For example, previously I used database connection A and wanted to change the connection to database B.Can anyone help me? Thanks.
Is there any way to manage the default behavior of boxes in the Create Project Wizard? For example, I’d like to default Project Unique Procurement and Project Unique Billing to checked.
Afternoon allDoes anyone have experience of using IFS to manage effectively the discontinuation of a sales part.Ideally I’m thinking of a solution where a part can be “ticked” as discontinued or planned discontinuation which would automatically identify this to all relevant departments to carry out their actions?Thanks
Does anyone know if it’s possible to schedule the “Calculate Order Cost” for all Shop Orders on a particular site or can this job only be run manually one shop order at a time? Thanks
I’m looking for a list of recommended methods in IFS for Functional Areas to jump start our work in defining these for SOX SOD purposes. For example, I’m looking for all the methods that can be used to adjust inventory without a Customer Order or Purchase Order in support of a Physical Inventory FA. Any suggestions?
I have a scenario where I've issued Project Inventory to a Work Order and have run Revenue Recognition. The revenue I expected to see was not what I expected to see. It looks like the system is not taking note of the fact that the project inventory was issued to the work order and, therefore, it was not consumed.I retested by issue the material to a Demand and Revenue Recognition DID calculate properly.Maybe it's a bug but perhaps someone can help me with understanding why Revenue Recognition "sees" the issue when I issue to the demand, but not when I issue to the demand of the WO.I"m all ears!Patrick
Hello, I have been trying to find a way to view all raw material that is used at a given work center. Ideally, I have reviewed material usage, component where used, but there does not appear to be a way to search by Work Center. I am hoping that there is an area within the system where this data can be viewed. Any help would be greatly appreciated!
Has anyone tackled slitting metals using IFS, for creating setups/shop orders?
how to create the directory in apps10
I see there was webinair on IFS Apps 10 - IFS Sustainability (ECO Footprint) Overview and Demo.Is there some recording or documentation from that demo available?
As part of our business agreements, we have the ability to return inventory to our suppliers on an annual basis that show no movement. We transitioned to IFS in early 2020 and majority of the inventory to be returned was purchased in our legacy system.I am aware of how the RMA works for returns tied to customer orders as well as when a PO was generated within IFS. Does anyone know how to return inventory when there is no PO tied to it within IFS?Thank You
We use the project management in IFS 10 Update 8.Now the user want to make "Projects Time Registration". We got an error masage "You cannot modify projekt transaction of the company XYZ without a valid position assigment". The employee has a correct position assigment. We had to set the Self-Access Role ID to "REG_NO_AUTH" in the HR-Module Employee File - Employment - Assigments - Organization. After that the user could register his projects time.We have to the set this role? Or is there another option?We don't use the "Time Management" in the company.
We continue to try to provide value added lobby data for manufacturing shop floor personnel using IFS Apps 10 UPD 6 (soon to be UPD 8). We want to display operations currently ‘running’ for each work center (started or interrupted but not completed/closed). in Work bench, there is a Gear icon and an ! icon that display for started or interrupted shop order operations. is some representation of those statuses held in a table somewhere that we can interrogate? or better yet, is there a ‘canned’ lobby element that already exists? Thanks
Do you know of a report in IFS8 that includes the operation’s labor factor (routed) , the quantity (lot) produced, and actual time posted to the operation as displayed by employee? Currently I run an operation and indirect report and manually key in the labor factor (routed time) per part number produced and then export and pivot table. I have also tried utilizing shop floor clockings and enter in the quantity produced. Both activities take a significant amount of time.
I am trying to see if i can set up graph for trends for our aging DO’s and it is not working for me, i have the data set for my aging DO’s but want to see the rise and fall by month, currently when i try it, it pulls it by only the obj status date, i am trying to see if i have 30 in jan and then 20 in feb and 40 in march for example. thank you in advance for any help, below is the data set i am working with
Hello,We originally set up multiple Change Order Templates, but have decided to reduce the number of templates that we would like our Engineering team to be able to select from. Is it possible to remove previous templates from the LOV in the “Copy From” field? If so, can I have some guidance on how to perform these steps. Thank you for your support
Morning, We’re testing Project Time Registration. When a user F2’s on this screen they see time registrations for all empoyees rather than just being restricted to their own - as happens on the Time Registration screen. Have we missed a setup screen? Thanks, Chris.
In shop order operations, it seems that the Overlap functionality does not work correctly. While CBS and APB are not used, and Infinite scheduling is used, see the below example,Calendar configuration has 5 working days (Mon-Fri) 8 AM to 12 PM and 1PM to 5 PM (8 hour day).Work center utilization - 100 %, all operations efficiency - 100%, Resource capacity of the WC - 100Operation 10 has 24 Machine Run Time (unit - Hours) and no set up timeOperation 15 has 12 Machine Run Time (unit - Hours) and no set up time and have a Overlap of 50 percentSame work center for both operation.As I understand, the start date/time of the second operation should be 12 hours (50% of 24 hours) after starting of the first operation, which should be 1/25/2021 1.00 PM. But it is scheduled as 1/26/2021 10.00 AM (18 hours after). Is system check something other ? Or system calculate in a different manner ? Thank you in Advance. Thushitha
We are trying to create multiple versions on an Estimate. However, when we try to change either the components or the operations on one version, it changes on both. How can we adjust these independently?
Hello Community,We are using IFS Version 8.We are observing opening of shop orders after closing then successfully.What will be the issue.
Hi All, I’m not sure exactly how to word this, but I’m hoping someone can help.I have a finished good part that I’ve set to have a safety stock. MRP is kicking out shop order requisitions, but I would like to have the requisitions automatically released to shop orders instead. The part isn’t Master Scheduled. I’ve tried a few settings on the Inventory Part with no luck. Does anyone have any advise on how I could accomplish this?
Dear All, Please share the document with screenshots for how to use batch balancing functionality in Aurena or IEE. Thanks in advance! BR, HA