This will include the questions related to Enterprise Service and Assets Management, Asset & Product Design.
Recently active
Hi,we like to use beside OpenStreetMap also OpenSeaMap Seamarks:https://t1.openseamap.org/seamark/{z}/{x}/{y}.png OpenStreetMap:https://a.tile.openstreetmap.org/{z}/{x}/{y}.pngDoes anyone know how to enrich the selector with this layer ?Or how to configure these as basemaps?Thanks! OpenStreetMap in IFS GIS Mapother tool with additional OpenSeaMap Seamarks
Hi,Where can I find documentation for the following Database tasks? Cleanup Document Tw Settings Document Transmittal Notifications Update Document ESign Status to Expired I cannot find a good description of what these jobs do.I have looked at About Document Transmittals About Digital SignatureJust tell me where to look :-) Thanks in advance!/Anne
We have on-boarded a large application wherein the application takes a pathway back through an Integration/Coordination process, through to the Server/data endpoint.ie,Application → Integration/Coordination → Server/DB ServerWe have relations setup between each node to show data flow from the App to the Integration and the DB to the Integration point. This is the flow of data. However, when our Service desk receives an issue with the application by an end-user, it will only show connection to the Integration point and not through to the server/db infrastructure.Question: Using relations, how would you represent that the Application is connected to the Server/DB Server as well as the Integration/Coordination point?
Hello, we are facing the challenge to set up a maintenance plan where the trigger is the completion of the previous’ period maintenance activity. At the moment our Maintenance Plans are set up as Calendar Triggered with a 12 month interval and a 2mo expand backward and forward window around the start date. The target date will be the same every year as will be the window around this date. Now if one year, the maintenance gets completed at the beginning of this window and the next year it gets completed at the end of this window, the interval between services can be very short in one season and very long in the other. What we would like to achieve is that the target date for next years maintenance is dependent on the actual completion date of last years maintenance. this would avoid extremely long or short intervals and allow certain activities to be slowly moved into different seasons if whished, by performing the maintenance early (or late) in the window multiple years in a row. Is
Hello,on the "Isolation order" page when I press the "approved preparation" button an error message appearing forcing me to fill the dates, but we would like to have to fill them. Is it possible to withdraw this obligations during the transition to the "approved preparation" status?Thank's
hiI added 2 fields in Person Screen with Page Designer. the 2 fields already exist: : First Name and Last Name. There are not translated and in page info path is missing ? why ,ThanksBest Regards
Hi All, i’m not sure what is exactly going on here so I thought to see if anyone has a suggestion on what is happening. Situation:We have Service Contract ‘8’ I added a couple of Service Lines Each service lines is associated with some Objects through the Scope tab Service Line ‘3’ has 1 object using the ‘Use Line on Structure’ option enabled (see printscreen - I also added a shot of the Eq Obj Navigator so you can see what objects are included in the structure of Object RTI250115-001) NBow I go to my PM Actions. I already created 3 PM actions for 3 objects belonging to that tree structure (Object Id’s ending in -003 / -004 /-006). Now I also want to create a PM action for Object -006 connected to Service Line 2 but this seems impossible. IFS will not allow me to select that combination.When I select Service Line 2, the drop down is limited to Objects ending in -001 / -002 / -005 = the objects that were not previously used. Why is that? Why would that limit my selection? P.S. I did alr
Hi We would like to show our workordre / worktask in a map, and “drill down” to the worktask using the map. Is this something that is possible in IFS Cloud? if so, how ?
Hi,What is the minium List of permission needed for a user to acces to IFSCloud:Is this list enough or some permission not needed ? Best Regards
Hi,Webclient page's NavbarLogoImage is not displaying and is showing a broken image. How can I fix this? Do I need to adjust the path or replace the image somewhere? Where should I load the image correctly?Any suggestion would be helpfull!Thanks,Akshay.
Rental Demand is added from Project activity and Intersite flow is used to deliver the rental tool, to a remote warehouse.We need to return the part after rental period. Since part is now in offshore remote warehoouse, we need to return this part back to onshore main warehouse and then to the original toolpool site that the tool repository exist. How can we use shipment orders in this flow to handle return.I can see only supplier shipment option is available. so there is no way to create shipment orders.If I create a shipment order manually, there is no way to reserve the same rental tool which I have rent IN using the project activity. Please provide a way how can I do the return and ship to onshore location from offshore.. The text I can see in hep is only this :Rental returns are initiated from Manage Rentals. Once a rental a return is initiated, a supplier shipment will be created. On the supplier shipment the parts can be reserved, picked and delivered. The rental period can be e
In Service contract when you set to periodic invoicing is their way to check invoice amount in each generated occurrence before creating invoice?
Hi all, I'm working on implementing Linear Assets in IFS App10. Even after Map Element Position, accessing the Viewer tab is returning the message below:Ifs.Fnd.FndSystemException: Explorer: An Unhandled Exception has occurred ---> System.ArgumentNullException: Value cannot be null.Parameter name: path1 at System.IO.Path.Combine(String path1, String path2) at Ifs.Application.Linast.frmLinastVisualizer.InitializeMap() at Ifs.Application.Linast.frmLinastVisualizer.PopulateMapPositions() at Ifs.Application.Linast.frmLinastLinearAsset.vrtTabActivateFinish(SalWindowHandle hWnd, SalNumber nTab) at Ifs.Fnd.ApplicationForms.cTabManager.vrtTabActivateFinish(SalWindowHandle hWnd, SalNumber nTab) at Ifs.Fnd.ApplicationForms.cTabManager.__TabActivateFinish(SalWindowHandle hWnd, SalNumber nTab) at PPJ.Runtime.Windows.QO.SalQuickTabs.CallTabActivateFinish(Int32 tab) at PPJ.Runtime.Windows.QO.SalQuickTabs.SendTabmTabActivateFinish(Int32 tab) at PPJ.Runtime.Windows.QO.SalQuickTabs
Sort the hidden columns so we don’t have to search/hunt as much.
Dear Community,I hope you're doing well.I have a couple of questions regarding the Tech Portal – New Work, and I would greatly appreciate any guidance you can provide: When a New Work is created through ‘Report work that I have done’, the following screen prompts me to record the Resource Group (which is mandatory). However, I am unsure where this data is linked or utilized in IEE. Could anyone provide clarification on this? On the same screen, the duration of the work is recorded, but I noticed that there is no time report generated for the completed work. Does anyone know how this is matched, or is there a way to create the time report during the same process, rather than after doing it from completed tile? Any insights or suggestions would be greatly appreciated.Thank you in advance! Best Regards.Aravinda Dissanayake
Hi , Is it possible to add Non Inventory Part in worktask > Material ? or there is an other place ? and the option Add Spare Parts From Detached Part List doesn’t appear ? Do you know whyand Add Spare fromObjet is Empty (there is only Non-inventory part declared)ThanksRegardsThanks
Hello,we met the issue in IFS Cloud.Created Purchase Order for serial part and reserved Serial number for that part:When we use Incoming Dispatch Advice for Purchase order receiving and execute function “Receive with Serials/Lots”, system doesn’t provide reserved serial number and asks to fill it manually:But if I use form “Register Arrivals” and execute function “Receive With Serials/Lots”, reserved serial number appears without any problem:Maybe it is some kind of bug in the form “Incoming Dispatch Advice” that the same function works diffrently?
No matter what in IFS Cloud the search is a ‘begins with’ and it returns incorrect results. Here’s an example of this…When you search IFS Cloud does a begins with search no matter what. In this case I need to update all the equipment at condition-monitoring sites with the maintenance strategy.I make this search string containing the (41) Object IDs that need to be updated.VS-07;VS-06;VS-03;SE-01;RC-03;PU-56;PU-55;PU-53;PU-51;PU-50;PU-21;PU-11;PU-109;GF-04;FA-07;DC-07;BL-18;BL-14;BL-08;BL-07;BL-06;BL-04;BC-99;BC-74;BC-73;BC-72;BC-71;BC-66;BC-47;BC-44;BC-38;BC-37;BC-32;BC-28;BC-27;BC-26;BC-25;BC-123;BC-122;BC-12;BC-11Because of the ‘begins with’ functionality I get (44) results because IFS Cloud also returns PU-1101, PU-111 and PU-21 when it should only return PU-11 and PU-21. The yellow items shouldn’t show up. Pain and SufferingWe run into this with part numbers and other places. I’m sorry I haven’t a perfect log of where we run into this, but we can’t be the only ones with a probl
When trying to update a Measurement via Measurements for Object we are getting this error message and I have no idea how to resolve?Is this something Sys Admin can resolve OR is this a bug that requires reporting to IFS CEC? Thanks,
Hello,Is IFS Cloud able to check that a person has a certain competency before they can book time to or work on a Work Task?
in the "sales contract" screen I wanted If the status field is "Completed" and the remainder to be invoiced is different from 0 then all the text in the item line must appear in red. how to do it?
Hi R&D Team, One of our customers has requested an enhancement for the FSM mobile application, particularly for the iOS version.The request addresses a situation where pending messages in the mobile app's sync queue are not sent to the server if the technician switches to another app, such as Teams or Google Maps, causing the FSM app to move to the background. As a result, these pending sync messages remain in the queue until the FSM app is reopened. For example, if a 'task completion' message gets stuck in the queue on a Friday evening, it will not be sent to the server until the technician reopens the app on Monday. This delay disrupts business processes and impacts the proper execution of workflows. The iOS imposes a limitation on background sessions, allowing them to remain active for only 30 seconds. After this time, the system terminates the background application. Consequently, if users do not open the FSM application before all messages are synced to the server, some messag
"Move Task" option is not available when the Connection type is Work Packages. Can we get this enabled to move work tasks to another work order even though the work order is initiated from project deliverables work packages side.This is important to customers according to the below business requirement> We need a functionality to be able to move work tasks to another work order, e.g. in the event that not all tasks are possible to complete in a planned period. The remaining work tasks will need to be moved to another(or new) Work Order, where the other/new Work order will often need a different activity connection.Standard cloud “Move Work Task” is restricted to only certain Connection Types for the Work Order (e.g. Equipment) - we intend to use Work Package as Connection Type for Work Orders originating from Project Deliverables. “Move Work Task” is also restricted by Work Order status, it seems once the WO has reached status “Prepared” or beyond the Move Work task function is no l
Hello, im struggeling with a workflow configuration. The workflow is as follows:Create a Faultreport in window (Fault Report) (FaultReportHandling) to trigger workflow (after) Check if priority_ID = 1 else close workflow. Get WoData (tried both prepareworkhandling and faultworkhandling API. Set WorkType with PrepareWorkHandling. Release Wo. I’ve tried many different scenarios but it always fails when the release action is included with below message or "Resource not found”. If I remove the activity “Release Wo” the workflow works and “Set WorkType” does what it should.I can also get this to work if I only work in the “Prepare Work Order page” but it’s not what I want.Can anyone assist? BR Johan
Is it possible to set the generation date of a PM to create a Work Order based on the completion of another PM.For example, you would set the Next Due date of the Year 2 service, based on the completion date of the Year 1 service. So the Year 2 service would be due 12 months after the completion of the Year 1 service.
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.