This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
Hi Community, What are the other places where value in shop order priority category is used other than CBS and APB? BR Champika
I want to know if after purchase order lines have been closed, the system can automatically close the same PO at header level. Thanks
Hi, I am looking for any information or contact or company that uses IFS who has gone through the computer system validation process to meet the regulatory compliance. This is a framework of good practice applies against regulated Pharma and medical device industry.I am looking for information to share their experience and lesson learn during the process against IFS Application.Although this is posted under manufacturing, it can be applied in other area too.Any information will be gratefully received. Thanks.
Good afternoon, Is there anyway to refresh an IFS window automatically? Normally, we do this manually using the little refresh button on top right. We are using IFS 9. Thanks,
Morning we are using IFS APPs 10 and currently reviewing how we plan and schedule our manufacturing shop orders. Currently we run MRP followed by CRP once a week which will generate all purchase and manufacturing requisitions with a mix of dates past due and present.When we convert a requisition we release the shop order straight away (with some dates in arrears) but only when the manufacturing department request replenishment ,to me this seems an incorrect method to adopt.I have prosed that once we run MRP and CRP, review the action messages and are finally happy with the plan and schedule, that we then convert all requisitions to planned for the current month and then release shop order to the manufacturing departments 1 or 2 days before the shop order is planned to start. This way MRP wont reschedule the requisitions each time it runs and will be able to measure the schedule adherence of all manufacturing departments and the accuracy of the planning.The question i have isWill it neg
Hi Using IFS APPs10 and currently reviewing and updating the Manufacturing Labour Classes and wanted to know the system implications from deleting persons from manufacturing labour classes, if any?i.e. will it remove all manufacturing historical reporting data or effect historical shop order costings.regardsJamie
we have a requirement of changing the component part in product structure and recipe structure which is in buildable state. What is the correct process of doing that.
Hi,If an employee reports in the Shop Floor Workbench on multiple operations concurrently, there is a time share calculated and shown in the time card day (tab "Mfg Clocking").The duration of the clocking records is calculated automatically based on this time share value when the clocking is stopped in the Shop Floor Workbench: Clocking Duration = (Stop Time - Start Time) * Time ShareAn exampleDuration = (09:30 - 07:30) * 0.8510637999094638374924393623 = 2 * 0.8510637999094638374924393623 = 1.70 (rounded)(09:30 - 07:30) * 0.1489362000905361625075606377 = 2 * 0.1489362000905361625075606377 = 0.30 (rounded)This calculation is correct. When the employee clocks out his attendance time, the duration of the shop order operations is calculated again:As the basis for the calculation is the already calculated duration used and not the start time and stop time of the operations:1.70 * 0.8510637999094638374924393623 = 1.450.30 * 0.1489362000905361625075606377 = 0.04That is not correct
Dear all,I created a part ‘hammer’ as configurable as seen below – It says this will enable the configuration tab in Inventory part window, its not enabled IE there is no configuration tab in inventory part window. So is there way to enable configuration tab in that page? Setup is done as below – But unable to receive stock into inventory with below error displayed – Thank you and Best regards,Sakun Edirisinghe
Hello, Our finance department is attempting a cost roll on some new parts and they are receiving this error: “The sum of the quantity on hand and the supplies does not cover the demands.” Any ideas? Is this a part setup issue or may that the materials used in the product structures are not set up correctly?
Hello, On the customer order the invoice is still printing despite the print invoice checkbox being blank in sales basic data. Does anyone know why?
Hi, We have a mix up of serial numbers. 2 Parts with the same part number, however the the first one should have the serial number of the second one and vice versa. We cannot just physically change them, the serial numbers are engraved and have different wear (they came back from the client under a RMA) How can this be changed? Rename serial doesn’t work as the serials were allready created in the Part Serial catalog.
is there a way to keep track of old revised recipe structures or product structures . Will there be a revision number..if i choose Restricted in structure/routing update in site setup will that help.
Hi,How can you search for Draft Customer Orders in IFS? ThanksCharlotte
For Shop Orders we have function “Mass update Shop Order structures” which you can use for component replacement in many Shop Orders at once. Do we have the same function for DOP Orders?
HiI’m having an issue where the operation after a set of parallel operations does not set as executable thus preventing the operation to be done on the shop floor workbench.
If a component i.e. “AG-TF-SUB-02“ is defined as “Not consumed“ in product structure and is driven by Master Scheduling and the assembly i.e “AG-TF-SUB-01“ which contain “AG-TF-SUB-02“ is driven by Master Scheduling it isn't recognized the “Not Consumed“ Status of Component AG-TF-SUB-02 and demand for “Not Consumed“ Component Part was created. Would like to know your opinion about this behavior. Product Structure AG-TF-SUB-1 Master Schedule AG-TF-SUB-1This is correct Master Schedule AG-TF-SUB-02Is this the expected behavior ? Subsequent MRP of Parts work as expected.
Can I phase in and phase out a revision on the same day?
Hi, Can someone indicate how this page works and its benefit plz. As it stands, when I paste a part no. into the search and enter the screen the page is blank. Are there preliminary data requirements? thanks, Joher
when we use MRP Type code of G with a cover time of 5 days on a Manufactured part, it does not combine the requisitions into a single requisition. Has anyone successfully used G codes on Manufactured parts
I’m facing strange IFS behaviour in Routing in IFS10. When I choose “Labor class” then in the field “Setup labor class” there is shown the same record. And after saving it disappears. It is impossible to choose different “Labor class” and “Setup labor class” in one edition. You need to save line and then choose the second value and save again. Do we have a fix for this bug?
Dear Experts In Window Control Plan - Manufacturing, may you suggest me how to set the number format in field to do not deduct 0 (Zero) behind?For example if I input criteria value or measured value is 2.500 the system will show 2.5 but I need system to show like this 2.500 instead by remain the number of digit after decimal point as I set. RegardsNithipatch
I have a strange request. A user wants to suppress printers setup in the print agent when the print dialog appears. I don’t think this is possible without removing them. Can someone please verify this or offer wisdom into how to do this? Thank you!!
Hi all, I am working on quality management subjects and I would like to create Audit and Non conformance report from customer order page. First of all, I know that should to add object connections page to do this. However, I can not find services relating to Audit and Non conformance report. Could you please help me find the services? ThanksOzge
Community, would like to borrow your mind here. Multi-site BOM set up procedure.for example a manufactured product 20-100. it is to be manufactured in 2 sites.20-100 (manufactured) - site 10120-110 (purchased raw) - site 101 20-120(purchased raw) - site 101 20-120 (manufactured) - site 102 20-121(purchased raw) - site 102 Site 101 will do final assembly for part 20-100, site 102 will manufacture part 20-120 and via distribution order transfer the material 20-120 to site 101 to do the final assembly.so, question here. from Engineering Transfer, how I could transfer to site 101 with part 20-120 Purchased Raw part type? since part 20-120 is already defined as a manufactured part. I have tried Detailed Transfer, in Engineering Part Transfer Graphic window, the part type cannot be changed, as I am planning to change the part type from Manufactured to Purchased Raw for part 20-120 in site 101. Thank you.