This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
Hi,in the inventory part lists screen we have a custom attribute (Owning Department).Is possible to create a lobby page with counter elements per Owning Department?So for example, if there are 5 departments, 5 elements should be presented on the lobby screen.Or do we need to make a separate element per Owning Department and place these on the lobby page?Looking forward to your answer.MfG,Dietmar
We are in an implemenation project with IFScloud and would like to discuss configuration issues with shop floor workbench. Who has experience with this tool? We would be happy to have a reference call on this topic.We would be happy for this exchangeThanksMichael
Can a Part Certificate be removed from IFS 10? Once it has been generated in a shop order build and received into inventory?I have proved a shop order can be unreceived to break down the parts back into inventory but only if a Part Certificate has not been generated. If certificate has been generated, I get an error saying “this part serial is used by 1 row in another object (part certificate) “
Hi I have a client that has several sites set up in IFSAPP9. One site is not calculating the MRP on parts. Other sites are calculating the MRP information for the part. We have looked in both inventory part and master part for a field that would be stopping the MRP calculation and cannot find anything. Has anyone come across something similar to this?
After adjusting the calendar to reflect overtime, re-generating and re-calculating capacity etc, the capacity shows up as available in the APB (see attached picture) but it is impossible to place any load on the time added - no matter if you’re doing a re-scheduling or manual drag-and-drop. If I use the manufacturing visualizer to drag-and-drop, the extra capacity is used so it’s just the APB that isn’t working. Version is App10, upd 13.
Hi,We had a set up like below on our routings. There were 2 operations – first extruding, second packing. As we did not want to report each operation separately so we chose milestone operation - when we reported second operation the first one was automatically reported.As extrusion and packing usually happens parallel we changed the parameter on second operation into parallel. From that moment automatic reporting of previous operation stopped working. To solve the issue we started using ‘Auto report of operation parameter’ when we completed into stock.The problem appears if we add one more operation to above connected to finishing. We would like to have operation first and second reported when we report second operation. However because of parallel parameter operation first is not reported. It is reported when the last (third) operation is reported .That causes issues – especially that components are not buckflused when consumed. Is there any way to solve it?Best regards,Bernadeta
Hi, At the moment we build in PPM time on a WorkCentre using resource breaks. This allows planners to see it in APB but the factory teams have no visibility of it via say workbench. Is there a way to maybe schedule the associated works order and then make it visibility to the teams on the line? Thanks!
Community, I have a weird problem that never happens before. I have a part needs to be repaired via shop order, so it does come with the repair structure, and routings are all in Buildable status. but when I am creating a repair shop order, the component parts are never loaded, except for top parent part is there, looks like the repair structure system just ignored. I tried multiple times, comes out the same result. anyone has the same experience and how to resolve this issue? Thank you.
Hi, how do you guys block capacity in production, without having shop orders? For example: during a project, you allready know that you will need some capacity in production, but the shop order can’t be made yet. You know for sure you will need the CNC machine, but cannot make the SO yet.We do want to reserve the capacity in production. We can’t wait untill the SO is ready, as this will delay the project. Thanks!
Hello!We’re using Alternate Inventory Parts. If, on a Shop Order, you have to use an alternate part, the work guidelines do no update - it keeps the Shop Order Material Work Guidelines of the original part. While I can obviously create an event to do this, I just want to make sure I’m not taking the hard road. I would think this would be a built-in process.
Hi everyone ,One of my user can not see Action List’s columns . He has a same permission sets with everyone else. The others can see the columns but he cant. Is there any idea why he cant see?
Hello IFS Users.I have a finished goods assembly on hand that I need to return to stock at the component level. I’m hoping I don’t have to do it with a bunch of inventory adjustments, but instead use some type of shop order or rework order to disassemble the assembly and return its components to the stockroom and charge the labor as well to do the disassembly.Has anyone done this type of disassembly process using IFS?Thank you all for your input.
We somehow managed to connect a Manufacturing Labor Class to a Resource that has a resource type of “Machine. This prevents us from assigning a true person resource to the labor class, creating an error message that says “Resource Type Machine cannot be parent to Resource Type Person”. We cannot break this linkage and create a corrrect resource connection after so many trials and errors. Any help is appreciated.
Hi, If I drag and drop operation to a occupied resource (workcenter), APB will automatically reschedule the operation that’s allready there. However, I don’t want that. I want to temporarly overload the workcenter, and afterwards drag and drop the operation that i want to move to another date.How can I turn the feature off?
Hi,When we create a count report in IFS, it seems to only create count reports for a bin location within whatever parameters that we define where inventory exists. Is it possible to create a count report to include ALL bin locations within specific parameters to also include the empty bin locations? If not, has anyone come up with a viable solution to also be counting empty bin locations to ensure that physically something isn’t in them, but not in the system? Thanks,Curtis Carpenter
A shop floor user is clocking into up to 10 shop orders at once (Allows concurrent labor clockings is enabled). The Time Share calculation is causing issues with cost postings. Time Share is a factor calculated based on the remaining labor hours on an operation. This is then multiplied by total clocking duration to give a duration per operation. This is less then ideal. They would strongly prefer the labor time is even split over each shop order they are clocking into (clocked into 2 operations, multiple labor time by .5, clocked into 4 operations, multiply by .25, etc....)In the attached example an employee was clocked in for .62 hours. Because Operation 5699 had less remaining labor than 7302, less labor is applied to Operation 5699.Does anyone have a fix/work around/suggestion?Thanks all for your help.
Hi. We are using the screen Resource Analysis to review manufacturing demand against planned avilable resource but can't work out what the ‘Preliminary demand’ and ‘Planned demand’ is used for?our graph only shows Shop order, CRP calculated and Absence data (see below). regardsJamie
Hi All, We got an issue from a client saying that they need to check the deviation of production for the month of January 2023. So, we suggested to get the costing from ‘Shop Orders Costs’ window after running ‘Aggregate Shop Order Costs per Shop Order’ job.But the client is saying they are calculating the costing from Product Structure level and wants to know the difference of logic deviation between product structure costing and the shop order costing.App version: 8Thank you in advance.
Hi Team,is it possible to delete an incident if automatic notification was already sent to the distribution list? Thanks
Hi,I’m trying to add a custom field to the Register Arrivals screen to display currency code of the purchase order (source_ref1) but I receive the following error: Any help would be much appreciated.
Problem:We have produced a machine with a part serial structure. The machine was sold and delived (Sm-object checked of), meaning that it created a serial object structure with the serialised parts. Now we have discovered that a wrong serial no was registered on the komponent part. Therefore I want to change the component parts serial both in the serial object structure and in the serial part structure. Does anyone have an answer as to how this is done the best way? It is in APPS10UPD15
Hi,We are new IFS Customer implementing IFS 22R1.We are currently strugeling with the Production Quality Control. We are producing in one piece flow. Therefore, we produce one piece of the production order and want to reply to the complete Quality plan (all questions) for this piece. Once done, we move to the production to the next piece of the same production order.We understood from the consultants that’s not possible. In IFS, we need to reply to the first question for the complete production order quantity, then move to the next question for the entire production order quantity,... Even if it’s possible to move to the next question before replying for all products, it requests a lot of “click” to move from screen to screen. By doing so, we will loose a lot of productivity in our production. How other factories producing in one piece flow manage this in IFS? Many thanks in advance for your reply.
Hi all, We have a qualification profile with several certificates, which are all valid for a specific operation.The employee doensn’t need to have all the certificates, meaning that he should be considered capable for the operation with only one of the certificates.Is there a way to consider the qualification profile fulfilled with only 1 of the certificates?
Hi,I have to build a custom event that would trigger when the Purchase Order header status is changed. And it has to create a quick report or generate an excel file, adding purchase order line details to it.Is there a way to do this?Thanks,Supun.
22R2Looking to use handheld barcode scanners in the manufacturing processes for various transactions. 1. What type of handheld scanners are supported by IFS Cloud 22R2?2. It appears that Scandit license is needed. Does IFS provide that license or does it have to be purchased separately? 3. Is there any documentation on how to set up the scanner to connect to IFS.4. Is there any documentation on the configuration/setup in IFS to use the scanner/barcode.