My customer is looking for the possibility to have a multilevel configured structure for a Shop order, but where phantom parts are still present.
I know Manufacturing structure screen allow the user to get the full multilevel mBOM, yet it is not a configured mBOM.
On DOP header, there is also a multilevel mBOM, which is configured, yet phantom parts are not visible (because they’re phantoms).
Does someone know if a report that would generate the following bom can be built ? :
Multilevel BOM
Configured BOM
Phantom parts are visible
I think this would be helpful for others too !
Best answer by JohannesWittwer
Hi,
We are building aerial ropeways in an ETO, EPC, complex project environment with a high manufacturing depth. This requires multilevel product structures up to 15 levels. We make extensive use of phantom parts (MRP Code P).
Some assembly shop orders for a fabrication group may have up to 2000 components on one shop order as a result of multilevel blow-through of those phantom parts.
Therefore we have the requirement to have those phantom parts still present to have some means to keep a structured part mBOM in Shop orders.
We have customized this as follows:
additional tab in shop order: Multilevel K-Part Structure
giving a view of standard material lines plus all components with MRP-Code P (or K-parts) visible (marked in green)
the phantom parts are used in the shop order reports to keep the structure visible
structure ordering in column “Ordering” - in a multilevel chapter format
supports even multilevel MRP-Code P blow through
RMB function “Replace phantom” (to support changes on any level of phantom elements including all sub-levels.
this supports all processes, where a shop order is created from a product structure.
this does not support engineering parts with provide code phantom
We are building aerial ropeways in an ETO, EPC, complex project environment with a high manufacturing depth. This requires multilevel product structures up to 15 levels. We make extensive use of phantom parts (MRP Code P).
Some assembly shop orders for a fabrication group may have up to 2000 components on one shop order as a result of multilevel blow-through of those phantom parts.
Therefore we have the requirement to have those phantom parts still present to have some means to keep a structured part mBOM in Shop orders.
We have customized this as follows:
additional tab in shop order: Multilevel K-Part Structure
giving a view of standard material lines plus all components with MRP-Code P (or K-parts) visible (marked in green)
the phantom parts are used in the shop order reports to keep the structure visible
structure ordering in column “Ordering” - in a multilevel chapter format
supports even multilevel MRP-Code P blow through
RMB function “Replace phantom” (to support changes on any level of phantom elements including all sub-levels.
this supports all processes, where a shop order is created from a product structure.
this does not support engineering parts with provide code phantom