This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
Hi, How to move part from one location type to another? Currently Part A sits at ‘Picking’ location but we want to move this to ‘Arrival’ or ‘Quality Assurance’ ? I am trying to move it using transport task but it is showing me an error that “cannot move to location type “Arrival” when not connected to purchase order. We have received PART A using purchase order. Please let me know how can we proceed on this. Thank you for your help.
Dear All, I am new in Aurena and don't know about Aurena development. Could you let me know about this that What is difference between Development in Aurena and IFS 10. Is Aurena use inside IFS 10 or we use in IFS 9.0 use also? Have anyone video then more appreciate and help me. Thanks in advance.
We have picking days set as 3 days but all Shop Orders seem to finishing just in time for the demand. We want stock to be on our shelves 3 days before it needs picked for the demand shop order or customer order. Anyone else having this issue ??? Or have we a setup incorrect ??
IFS Apps 10 UPD We have shop orders that are set to Auto Close but are not Auto Closing. The Close Code is set to Auto CloseThe Qty Complete is equal to the Lot Size StateMaterial = Completely IssuedOperations = Completely ReportedProducts = Complete Received Can anyone please advise what the program checks when the system attempts to Auto Close the Shop Order as I cannot see the issue. Thanking you. John
On the Engineering Part Revision screen, IFS provides a RMB option called Copy Services. When clicked, a dialogue box is shown which allows the user to specify a Source part number, and then select if they want to copy the Structure, Documents, or Characteristics (or any combination there-of).In IFS Apps 10, I can use this function to copy Characteristics (attributes, values, and Info) from one Eng Part Rev to another, but when i try the same in IFS Apps 9, the option for Characteristic is always greyed out. Details of my process are as follows…Open the Engineering Parts screen and create 2off new parts… Part No: RHU-TEST-111, Part No: RHU-TEST-222, Open the Engineering Part Revision screen, and search for RHU-TEST-111Open the attachment panel, select Characteristics,RMB, Select Technical Class…Select an existing technical class template (I used a tempate with ~50off attributes)Populate the Value and Info fields on one or more attributes.RMB, Save Attributes On the Engineering pa
In Operation clocking window IFS75 , account date and transaction date are not similar , there is 1 day dif.What could be the possible setting which caused this?No Time off set define in Time clock terminals / No site off set defined.Thanks
How can I identify common parts across various Product Structures
Hi, Does ‘Planning Alerts - Shop Order’ need to be configured (if so, how) before this page is useful? I’ve done partial testing by selecting ‘Approve Planning Alert’ for what is deemed as ‘Alert - High’. No changes occurred to the orders/parts question. At least, not according to the history of said orders. I’m not sure what to expect with this page, i.e. is this anything like actioning exception messages in other MRP vendors? What is the scope of these alerts? many thanks, Jay
Hi all,Apps10 has this nice new feature called ‘operation block’ for splitting reported time between multiple shop orders. But it does not seem to be working on the materials. Hence, how do we issue material the same way to multiple shop orders (and unissue afterwards)?
Hi all, I’m scheduling an entire product, to be manufactured from scratch, with MRP (Apps 10) and APB.How can I plan the upper levels of the bill, i.e. the assembly parts, to start only when the component pieces are projected to be available based on their CBS scheduled finish dates. So, the shop order for part .’..GA’ has an Earliest Start (as found in the header of the order) of much greater than whenever the requisition was accepted. Typical product:Level 0 = General AssemblyLevel 1 = Sub-assembliesLevel 2 = Piece Part Requirements Our capacity constraints are in making the piece parts (L2) which are time-consuming operations. Hence, I need to finitely schedule that list of parts in APB based on resource loading then, schedule the upper-levels to start based on the projected availability of L2. Tying materials with ‘Operation No.’ in ‘Product structure’ doesn’t provide assistance because the resulting action messages are downwards-looking. Early/Late Order actions would be among
Hello Guys. I am looking notes of Aurena, I don't know about Aurana anything, In my company started working In Aurena (IFS 10) in after few days. Please assist me, how can do work,developement in Aurena. Highly appreciate for such kind of help for us. Thanks in advance.
Hello,We have a question regarding fulfillment dates and feedback loops.We create a customer order for an item and put a planned ship date of 3 days from today Site MRP is run later and determines we will need to build the item and manufacturing lead time (and purchasing lead times) dictate it will take 3 weeks to buildIs there a mechanism in IFS that will alert (or modify) the original customer order that the original date is no longer feasible? Or are custom events or reports the only method?
Hi Guys, Kindly assist us that how to Copying user profiles and use other environment of same user in IFS 8 . Screenshot will be more helpful.
Hello,there are differents ways to create routing alternate by copy :from copy part,copy alternate , copy routing head …we would like to keep in all cases the origine routing alternate that create the new one.Is ther a way to get this information?Thanks
Hi all, Can I get a reference or manual for how to execute MS and then tend to any messages that may occur. What is the name of the page on IFS? thanks,Jay
Hi all, How can I update Need Dates for Shop Orders, in the event the Required Date for the independent demand against the top-level is changed?For instance, a product could be given a Required Date of next month. MRP then calculates backwards to determine the date at which each material in the bill must be available to salsify said date, using the component lead time (unprotected). I take it this is how Need Dates are calculated. But, if the business has a change in priorities, and we decide to amend our master schedule, I’d like to find a way to update the raised/released/started orders based on us having manually edited the Required Date.That way, when APB is executed over a group of orders, taking Need Date as a means to determine sequencing, it can reflect changes in our priorities at the top-level.Is there a report to provide this alignment? Any data requirements? As of now, we are not using pMRP or DOP. Just IFS Apps 10 (with APB for CBS Scheduling). thanks,Jay
Hi everybody!I have some documents to send to users and want to send them from IFS(via email). The problem is I want to schedule when I can send. For example: every month,every hour exc.. I looked over Document Distirubtion but the trigger is only when document release.I dont want to use backround jobs or event action because these are not depent on an event. I want to use as a reminder. Is there another way? I use IFS 9 Thank you
Dear All, Kindly let me know that what is use of XML file in order report in ifs 9.0
Hello Guys, Please let know about Result Key use in order report (IFS 9.0 v). What is use Result key and why use.
Does anyone know the name of _api that provides IFS transfer from Ms Project? I want to add a field to the transfer process.
Hi, we are currently on our way to implement the project module in our apps 9 environment and an enduser asked the following: does anyone know a good way to claim capacity in production for project needs, i.e. to make sure that there is free capacity for the manufacturing demands in a specific project?Br Jonas
Please suggest if there is any way to handle this in IFS8
Is it possible to prevent users over reporting operations against shop orders? A user a over reported the quantity produced on a shop order which I am wondering if there is a way to prevent happening again.
Hello,I am looking for a way to enable the “receive into inventory on last operation” by part number. I see that there is a way that you can do it by work center, but I can’t find anywhere to do it by part number. If anyone knows of a way to do this, I would greatly appreciate it! Thank you,Matt
Hi,I’m looking to find the table/view where this field resides. Any help would be greatly appreciated. Thanks,Mike
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.