This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
I am trying to set up a custom field that is a checkbox which is going to be true if all the checkboxes are true at line level below or it wont get checked in the checkbox if even one of the values at line level has the checkbox unticked(due to line level logic) I tried to set that field as a read only field and wrote below script ( I am using using select statement as Implementation type) - select CASE WHEN((select count(CF$_TEST) from PART_AVAIL_STRUC1931493261_CFV J WHERE CF$_TEST = 'False' AND J.TOP_CONTRACT = :TOP_CONTRACT AND J.TOP_PART_NO = :TOP_PART_NO) > 0) THEN 'FALSE' ELSE 'TRUE' END FROM DUAL Now when I finish the process by selecting field type as enumeration and boolean where enumeration is FndBoolean I get the attached error Can somebody help me understand, where is the issue what I might be doing wrong ?
When manually reserving a serial object, it would be beneficial to filter by the customer or shop order to identify the finished goods from a specific shop order. This would be helpful when a shop order has a large quantity of finished goods (i.e. serial parts) so it is too cumbersome to filter by serial number. And if there is another shop order with the same part and config ID, it is impossible to tell which serial parts belong to which shop order. Suggestions please?
Hi I have a finished good with a standard cost (BOM & Routing exist) but I want it at zero cost in my inventory, ie all actual cost on the shop order comes as a shop order deviation in P&L. I guess the best idea is to set the item to ‘zero cost only’ but when I try to save it I get an error But I have no idea how to set the cost of the product to zero!Anybody now how to move forward here ? Thanks, Søren
Hello Community,We are using IFS APPS 8. What is Back Fulsh , Auto Report of Operations and Simplified Material check and its uses while reciveing shop orders. For teting purpose I have create a shop order with Lit Size of 1000.Then I have manually reserved this shop order with only one qty of component parts in Material Tab.Then I have Issued manually One qty.Then I have reported total 1000 qty.Then I have Checked Simplified Material check option in Receive Shop order window in Material and Operations and received manually 1000 qty. This behavior of shop order receipt does not required coponent parts stock in system.If only one component is reserved and issue then user can receive 1000 qty shop order in system. I need to know what is the purpose of this Simplified Material check tab. RegardsDeepak
When the Site is set to auto build tracked structures, what logic is used for allocating reserved lots of component parts to the parent serials/lot(s) on a shop order? What determines how much of each lotgoes where?
I want to generate purchase requisition when the levels of some parts get to a certain level but first i have to activate a kanban circuit. Somebody know how can i active a kanban circuit i use IFS10.
I have a manufactured part I only want to build when I have actual demand, not to forecast. I would use a planning method of next level demand, however, there are very long lead times for the purchased raw material to build the component and I would like the Finished Good forecast to drive requirements for the purchased material. Consider this example…Finished Good – BikeManufactured Component – WheelPurchased – Tire I want to purchase enough tires to support the Finished good demand. However, I don’t want to assemble the wheels unless there is actual demand for the bike. Reason being there is a very long lead time on tires and a very high cost of assembling wheels.Is it possible to not have MRP generate requisitions for the component or finished good, but still generate purchase reqs for raw materials? Is it possible to accomplish this, and still have the make parts included in CRP?
Listed here is what I can tell is the list I have available to myself to search for approvals. I don’t see where I can search approvals on projects or requisitions. Anyone know if this is an option?
Can anyone explain why there is missing numbers the inventory barcode sequence? What happened to 39501 ?
Hi all,Our current Manufacturing Lead Times (as found in ‘Inv. Part’ - ‘Acquisition’) are not accurate.This is because the calculation used by IFS totals all the values we’ve specified, including the queue times (entered manually) for each work center in the routing of a part. This formula doesn’t seem correct. Case:Consider part, P, which has an MLT of 100 days.P could have 3 operations, at 3 different work centers, with 3 different queue times.WC1 - (queue time against the calendar in working days) = 10 WC2 = 20WC3 = 70 In isolation, the values for each work center are true. For example, if anther part, P2, has only WC3 in its routing, it may need to wait 70 days based on the loading of the resources to begin work. However, the original part, P, routed through WC1- 3 doesn’t have a lead-time of 100 days. Since the 70 working days of queue time is greater than the preceding operations, this would absorb the wait time for the 2 prior operations. So, the actual queue time for P would b
Is there a way to search by Report Distribution Groups, and individual?
Hi,Is there a way to Filter out work centers from APB Master data. When there is a long list of work centers that are no longer use or RRP work centers which will not used in APB planning, would be nice to remove from the Master data.
For example:If you have the same part in two companies/sites. In the Aurena client, first set the search criteria to one site. Then run the search for the part number.Both the parts from the two companies/sites are fetched for the query results regardless of the previously set site search criteria.In IEE client this filtration is available and only the part corresponding to the filtration criteria which was set initially will be displayed.
Hi all,Another one thats driving me up the wall.Apps10Requirement is to insert sysdate + 14 into target completion date when a user creates an NCR.First stop was writing a custom event to populate the field.I’ve made so many code alterations i cant even remember if this is the correct one now so use it as an example.DECLAREpragma autonomous_transaction; INFO_ VARCHAR2(200) := NULL; OBJID_ VARCHAR2(200) := NULL; OBJVERSION_ VARCHAR2(200) := NULL; ATTR_ VARCHAR2(200) := NULL; ACTION_ VARCHAR2(200) := 'DO'; DATE_ VARCHAR2(200) ;CURSOR GET_DATE_ IS select to_char((sysdate + 14),'DD/MM/YYYY')from dual;BEGIN OPEN GET_DATE_; FETCH GET_DATE_ INTO DATE_; CLOSE GET_DATE_; Client_SYS.Clear_Attr(attr_); Client_SYS.Add_To_Attr('TARGET_COMPLETION_DATE',DATE_, attr_); NON_CONFORMANCE_REPORT_API.modify__ ( INFO_,OBJID_,OBJVERSION_,ATTR_,'DO');END; If i dont add the pragma then i get the mutating trigger etc.If i add the pragma i get. So figured to get around this i woul
In App10 Quality Management/Quality Control/Basic Data/Quality Basic Data - Part window the part lines cannot be deleted as shown below. However, this functionality is available in App9. Refer below screen capture. Any reason for this change in App10 when compared to App9?
When i create a fault report system always generate work task with customer order type ‘SEO’.Is it possible to change this default value?Vasco
I would to know if the operation status of maintenance object can affect the manufacturing work center status or availability?Or the other way arround when i report the work center has downtime because a problem. is it possible to automatically generation out of operation in maintenance object?Vasco Silva
I was trying to create MRP (Perform Site MRP) and this is the error text mentioned in the background job.Environment: APP10 Regional TEST CMB I tried the same in APP10 TECH CMB as well. But received the same error twice.Does this happen because of an issue with the Customer Order? Any thoughts/suggestions on how to resolve this/ complete MRP would be highly appreciated. (There is a similar question for “Perform Project MRP” which is posted 11 months ago but with no answer.)
Is it possible to move an inventory part to a Quality Assurance location if the part was not received on a PO? Manufacturing would like to move non-conforming parts to a non-conformance location until final disposition is determined.
Hi i am currently using IFS APP10 and have never used the Production Line Management window before.The company I work for are a build to order manufacture and we do a lot of repeat order work and have a core product that is manufactured every day.would a product such as our core product benefit from being set up as a production line in IFS?could anyone provide a brief explanation as to what exactly the Production Line Management window can do and when to use it? regardsJamie
Dear IFS community,Sateba is just starting his IFS project (We are producing Sleeper & Bearer for rail market).I’m looking for a French company which is already using IFS on manufacturing module to get 1 hour feedback on the following module/functionalities : MPS/PDP, MRP/CPN, shop/production order, component consumption methodology, how to deal with shop floor requirment ( Standard screen, custom screen, Wadaco,…)Best RegardsAlexandre PILZ
Hi,we have a question,in Part A, the serial rule is the In Inventory and/or At Receipt and Issue. Before receiving Part A on shop order, a serial structure is required. question arise here, is it mandatory that all the sub components have to be serialized and/or lot controlled parts?Thank you.Ron
Hi,The very first time I connect to an APPS10 environment with Enterprise Explorer, I have the Login Window in English (picture 1).I have to change the language in the EE options to have it translated in my language (FR) when I connect the 2nd time (picture 2).Is it possible to have the Login Window translated in a specific language the very first time I connect to the environment ? Thanks,/Hervé
Hello all, We have a shipment we were trying to undo on a consignment order. Normally this is not a problem, but on this particular part, we are getting this message:“UNCODELOV is not valid for lot/batch master. Contact system support.” When I have tested this, it appears to be related to the lot quantity rule being set to many lots per production order in the master part record, but not 100% sure about this. Thanks,Rich
Hello, I got a problem with unreleased activity.The MRP runs and generates Shop Order Requisitions (SOR) and Purchase Order Requisitions (POR).The problem is that the MRP creates an MRP Planned Demand needs. This needs are related to Shop Order Requisitions in Status “Proposal Created” not accepted by the planning team. Exemple:I got two Finish manufactured products A and B with planning method A (MRP): Product A = (composed by one unit of B and other of C)Porduct D = (composed by one unit of E and other of F)So, the planing steps are:Execut MRP. Check Shop Order Requisitions (SOR) and there is proposals to Release 2 unit of product A and 3 units of product D for the same date. You decide that you will not accept the SOR for product A and ignore it. And Accept SOR of product B. You run MRP again. (Because I know if I change the demand of higher planning levels the demand of levels below will not automatically change. The proposals are fixed) Then you go to your Purchase Requisition li
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.