Hello everyone. I’d like to know if anyone does the following or if it’s even possible.
We use standard costing. Site A manufactures a part that has material, labor and OH cost bucket IDs. The part is then transferred to Site B. Currently we use the P-150 cost template to set the standard cost in Site B to be the same as the standard cost in Site A. The problem is that the cost in Site B is only associated with cost bucket ID 510. I’d like the material, labor and OH costs from Site A to be the same in Site B. Is this possible? Thanks!