This will include the questions related to Procurement, Demand Planner, ASC, and SRM.
Recently active
Hi All!We runned into a Purchase Requisition with an duedate which we could not understand.Hope someone in the community can help explain this.It seems somehow that MRP is not creating an requisition with dueadate earlier than an already existing Purchase Order.This is the scenario step by step:We had an customer order(-5902), which was placed well ahead. And we ordered the parts for that order, also well ahead. (duedate 15-5-2024, And Purchase Order-57 was created, also duedate 15-05) well ahead order placed, and PO released (MRP executed) So far as expectedLater, another customer ordered the same part. (Customer order -5903)This wanted date was before that ‘well ahead’order.’(Duedate 13-02-2024)The leadtime for the inventory part is 1 day. second Customer Order placed, MRP not yet executedso far as expectednow we expected that running MRP will create an Purchase requisition with duedate 13-02-2024.MRP for part settingsBut.. an Purchase requisition with the same duedate as the other p
Hi,Can anyone let me know whether we have any report or method to check the Inventory part in stock details based on past date?For example, Inventory Part in Stock for 31/12/2022 date?Thanks in advance.
How do I update unit cost on an inventory part that is set as weighted average?
Hello, I am trying to perform ABC classification, frequency class for site and I am getting warning “no statistical information was found.” Can someone help me or share thoughts if you have experienced this issue?
Example case:We have a part with a minimum lot size of 50 pcs.We create a non project related demand for the part of 2 pcs and run the MRP.A supply of 50 pcs will be planned. OK so far.Now we create a project related demand for the same part of 2 pcs and run the PMRP.Another supply of 50 pcs will be planned, even though in planning 48 pcs would be left from mrp planned supply.MRP/PMRP do consider quantity on stock, but not planned quantities of the other.Effect:We buy/manufacture 100 pcs instead of 50 pcs for a demand of 4 pcsUnnecessary procurment/manufacturing, incoming inspection, warehouse, scrapping costs.We already had that topic checked by IFS R&D. Works as designed.Any other customers having the same issues?
Hello community,Is there any possible way to enter parameters for multiple data points in a purchase control plan analysis? For example, I have two data points: length and height. When I receive 200 pieces of a part from a purchase order, I need to enter controlled parameters for these data points in the control plan analysis one after another for the 1st data point and then for the 2nd data point. Do you have any ideas on how to be able to enter both parameters for one part and then move on to enter parameters for the 2nd part, and so on?Many thanks for your ideas and time.
We have 2 material lines on our shop order we wanted to delete. The PO was cancelled and the items unassigned from Project however the pegging is still showing to the PO so it won’t let us.Any idea how to fix this
Hello everyone, one of the big flaws of RFQ module in IFS10 is that you cannot send RFQ to supplier who are not already created in IFS as master data.i was thinking of using prospect supplier and allow the users to create a prospect supplier to whom they can send RFQs.i would like to know how that works and is it possible to switch a pospect supplier to a real supplier
hello everyone,I can't cancel PO line because of the following error, taking into consideration that “handle return material authorization” in the customer order screen is not used in my companyThanks
Hi,I would like to ask an explanation how is system forecast calculated if Moving Average forecast model is used. According to documentation I understand that it is calculated as average of adjusted demand for selected period. It works fine if adjusted demand is not outside standard deviation (red or yellow background). But when it is, I really don´t know how it is calculated and what is included in calculation.For example - Moving Average for 3 period.Adjusted Demand Average is 3968,12System forecast is 1672,33. Could somebody explain?ThanksRomana
Hi, using Apps 10. Some months ago, we received a part. We received it at QA, did inspection (pass), moved into stock at location XX. We wanted to use the part, but then noticed that it was not OK. So we want to send it back to the supplier. The easiest way (as far as we know) is to return it using the PO. So we moved the part to location XX, put the ‘to inspect’ qty at 1 and re-initiated the inspection. But when trying to return the part, it showed the error “Location XX does not exist” When we check the part serial history, we can see that the part is there and that this was the first picking location of the part after it arrived. Any idea where this come from?
Hello everyone,I encountered an error while trying to return a part based on inspection results. The error message states that the location does not exist, even though the location does exist. The part is currently located in the same place where it was received. Can someone assist me with this issue? Thank you in advance for your help.
Hello Everyone, We have an error on a PO receipt that needs to be cancelled. The error states that the received quantity is no longer available in the receipt location. The data shows otherwise. Does anyone have experience with a similar problem.
We have a couple of work orders with the following issue. For WO we ordered materials, i.e part nr. 100024743, but that one line was never used.The PO and the PR are closed, logistics Issued with Internal Transfer, but now the MR can not be closed, and thus the WO and the Activity cannot be closed respectively. Usually the Material Order can’t be closed until material on the PO is issued, but we never used the materials.What would be the best way to close the Material Requisition here?
Hi All;Is there any way to cancel purchase requisition line and a purchase requisition header. On IFS 10 there is no function to cancel purchase requisition but is there any other way for purchase requisition lines to stay still but behave like deleted, ignored by the further steps of procurement. Thanks in Advance
Is there an easy and fast way to add the same document text to a large amount of inventory parts?
Hi,Looking for some knowledge and or experience with this area of IFS and intercompany order processingOur colleagues in a sister company sent IFS order confirmations via messaging for 2 no PO’s nos. P108324 & P108325.(see attached)However, both PO Lines are showing as Released (NOT confirmed) in IFS which seems incorrect. Can anyone advise why the POs are only showing as released and not confirmed? Is this an IFS bug? We are using Apps 9. RegardsJohn
We start the process by creating a request for a product from the purchasing material request screen. We have an approval process set up for requests. Once the request is approved, purchasing personnel can change the material supplier or even split the request into two different suppliers. However, this operation cannot be performed because it is approved. How can we proceed without putting it through the approval process again?
It is getting more and more common to buy services as a subscription model rather than just buying a product up front. The whole SaaS model is based upon this.My question: How do you in this community deal with these purchases?My experience is that companies purchases subscriptions without a purchase order and deal with manual postings on invoice.If we would use the normal flow in IFS, and create a Purchase Order for this purchase. I would have to make a receipt of the PO to get invoices to match. That would be as much, or even more, work than just to deal with the invoice. Also, I don’t want to receive a larger amount than I am supposed to pay each month which would force me to do a receipt each month.Ideally there should be a functionality where I can create a PO and accept invoices/payments with re-occuring settings (for instance each month for a 2y period). It should be enough to approve one time that the purchase/payments will be done in accordance with Supplier Agreement.
I miss having the opportunity for total amount for offers in Order Quotation as we have different offer for same job. Also miss having the opportunity to put in Charges at that stage, as we often forget to add that in PO later. What are your thoughts about this? HKK
Hi all, Some of our suppliers are offering “Core Deposits” (When they return their used components (called "cores"), we refund their deposit.)Do others have the same agreement and can tell how they are handling the deposits in IFS?
we want to modify purchase order received data via API. it can aslo modify TRANSACTION_HISTORY DATE_APPLIED field. does anybody give me a favior for inform me API function name. thanks
We would like to be able to authorise a Purchase order / Purchase Requisition Authorisation Step via email. process would be for the Authoriser to receive an email related to the Authorisation step. the email should use the Yes / No buttons available in Outlook to Approve the PO/PR. has anyone done this using Outlook/Exchange and in APP10. We are also considering touch apps , but emails approval has been requested by the business.
What is the IFS recommended way to handle the disassemble of finished goods. Eg- We might on occasion take apart finished goods and convert them back into component parts. Currently, we achieve this by simply count out finished goods and count in components.
All our inventory is project specific and planning is accordingly done via project MRP. The ‘run project MRP’ functionality does not have the option to plan with alternate components (where MRP does). In the following topic there is mentioned due to which reasons IFS has made this choice:'Plan alternate component' in PMRP | IFS Community In case of an engineering change we would like to use up the left-over stock of the ‘phased out’ part before switching to the new ‘phased in’ part. Are there system settings or is there a way of working which can be used to simulate the ‘plan with alternate component’ functionality? Where:The ‘phased out’ part’s stock is used up before switching to the ‘phased in’ part The ‘phased in’ part is ordered in time The alternative can still be used in case multiple engineering changes are in place