This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
Hi,Is there not any possible way to “Ship WIP To Supplier” for many Order No at once and not - One by one? Etc Report Shop order Lines ?
Hi All, How can I adjust the number of decimal places in the ‘Quantity Per Assembly’ field? I have already adjusted ‘Regional settings of the application’ and ‘Region settings of the machine’ but no impact. Best regards,Devni
Hello all, I am trying to find a way to prevent a Shop Order Operation step from closing automatically in the event there is a failed QA analysis confirmed. I believe a Subtask could be used, but it appears they cannot be attached based on an event. I do not want to require approvals for any Shop Order Operation, only those with a failed analysis. In IFS, is it possible to trigger any sort of event to require a sign off in the event an analysis is confirmed with a failure/out of spec? Any guidance would be greatly appreciated.
Community, Does anyone has experience building integration with Kardex Remaster? we are going to have Kardex VLM installed in May, and we are looking for IFS integration solution. Thank you.
Hello, I have configured a Subtask with an Inspection Sign Off requirement and qualification profile. I have also set the Site to consider qualifications. However, any account is still able to complete this sign off from the SFWB. The help in IFS seems to indicate this is all that is needed to perform a security check and prevent unqualified accounts from completing the sign off. Is there an additional item that must be configured to activate this functionality? Any guidance would be greatly appreciated!
Hi,Capability Check is not supported with project connection. Capability Check will therefore not be possible to run when the demand order has a project connection in IFS cloud 22R1. 1. This function is possible in IFS Cloud 21R2. What is the reason for the change(limitation) in this function ? 2. Is there any alternate to do capability check when the demand order has a project connection ? (in IFS Cloud 22R1) kind regards,Yashodha.
I need to add some custom fields in IFS cloud environment to recreate a customer scenario. Is there a method in IFS cloud to add custom filed directly? Furthermore, if I need to add number of custom fields in IFS cloud what is the best method?
Hello together,I received a customer question.Prehistory: they set up their material OH costs so that they are generated by backflushing for a shop order when. The material OH should only be applied for purchased items. (This was already achieved in a test).Now the question:they would like to set up the purchase part OH costs especially that they are counted on/to the issued material batch(es) for the shop order (the OH costs relates directly to the backflushed material batch).How do the cost classes/schemas have to be set to realize this?Example: OH costs=10%, average puchase price=10€, price of withdrawn batch: 9€. Then the overhead costs for this should be 0,9€ -> 9,9€ on the shop order for purchased parts.Is somebody familiar with that? Thank you for help in advance! Regards Markus
Hello Community,We just upgraded from “9” to “10” UPD 13. Production/Quality has noticed MRB’s no longer create in “In Process” ( “9” ) but in “10” create in “Planned”. This is adding steps (and a little confusion) to the process when creating an MRB via RBM off a Shop Order Line. Is there any control on the “Default create MRB”? We’d like to set it as “In Process”. I’ve looked in all the usual places for this type of setting, nothing….. Thanks, Troy
Hi All, During our implementation we created custom Move Tickets and Barcode labels to identify product on our Shop Floor. The reports and labels essentially contain the Part Number, Description, Revision, Qty, Operation Sequence, Next Operation Sequence, Work Center, and Shop Order number. We have the PN and SO barcoded on the reports as well. Ideally, if possible, i would like to make use of the standard IFS warehouse labeling reports. However, it appears that the only options would be to print the Shop Order Reports (Work Instruction Report, Shop Order Report). My question is - are these the only reports in IFS that can be used to label product that is being produced? How would work in progress be labeled to indicate where the next WC location the material should be taken to for additional processing? Any guidance would be appreciated.
Hello, I would like to connect Shop Order, Work Center, Supplier to Quality Audit screen as an object. What should I enter into service list field which is available on object connection screen ? ShopOrd is currently connected with NCR as an object but I would like to connect it to Quality Audit Screen as well. Can you please help ? Thank you.
Hello, I am trying to connect a control plan for a shop order which is pegged from customer order. IFS is showing me an error that “Cannot connect control plan to this shop order” . Is it a bug or standard functionality ? We need our QA team to inspect and enter analysis for customer orders created to address quality issues. Please let me know. Thank you.
Question was raised by one of the customers regarding the following. Customer has ordered 6 of a part for a project.Accidently they receive 12 into project inventory.The mistaken 6 received were counted out and not done as a cancelled receipt.The project still think there are 6 more to ship or deal with yet they aren’t there. How can we close this activity and remove it from the Unfinished Activity work.
Hello all, I am attempting to resolve an issue related to MRB cases for a single part. Currently, we have an MRB Inventory Location that material is moved to prior to the creation of an MRB Case. The issue I have is that in multiple instances, the same parts may require two MRB cases for nonconformance is. Below is an example of the process.: 100 parts moved to MRB location (PN 12345)50 of the 100 are related to nonconformance - Feature Size50 of the 100 are related to nonconformance - Surface Contamination Today, I can only create one MRB case for the entire 100. I must then make notes in the case to outline that there are actually two different reasons for containment of the parts. This also lead to labeling confusion as which parts have the specific nonconformance. Ideally, if you could simply create two MRB cases, one for each nonconformance, this would allow for correct labeling and management of the disposition for each group of 50 parts. The only workaround for this that I have
Hello all, Is it possible in IFS (10) to have the Lot Size of a shop order increase in the event that the reported qty from Shop Floor Workbench exceeds the original Lot Size amount? Often times we over run a coil fed job, which will result in the original Lot Size not matching the actual reported qty (Lot Size - 1000, actual completed qty 1230). Any guidance would be greatly appreciated. Thank you!
We have a part in Inventory Parts in Stock.The part shows 4 on hand and 4 reserved.Unfortunately, there is nothing in Stock, when selecting Reservation Details,, nothing shows up.We need to remove this, or set to zeroI created a count report, but this part does not show up, so i can’t set to 0Any ideas in removing this, or changing the values to 0.
I have a Control plans that are not active however there are items that are going into QA and requiring inspections. Is there anything else that can cause an item to go into QA upon being received?
Hi all,Sometime we have to start an operation on a fixed date. The other operations then have to be rescheduled according to that date. In the example below.Operation 20 must start 27-05-2022 06:00:00.The following operations are then rescheduled, but the operation (10) before does not rescheduled . How do we make it do that?
Afternoon,Using the Shop Floor Workbench in Aurena you can filter by barcode.Is there any specific settings that enables the barcode ID field to allow scanning input from a mobile device (camera) instead of having to manually input the barcode ID? Appreciated, Jamie
Hi, we have a intersite set-up, where the production and the warehouse are located in different sites. All stock is in the warehouse in Site 2, the production is in Site 1. What is the easiest way to generate a pick list for our production in Site 1, to be picked in site 2 without losing the link? Because we want to pick in Site 2, put it all in a box and send it to site 1. Site 1(production) needs to be able to identify easily for which shop order the box is when it arrives. We are playing around with DO generated by MRP, but the problem is that we lose the connection with the shop order.
Dear Sirs;I use Interactive Scheduling Client on CBS APP10.Please take a look at the picture below.The date S2 and S3 is holiday. You can find 3 shop order plan across the holidays.I hope that those shop orders is schedlued complete before the holiday.Any idea to control those case?? eRegards;Yasuda
Dear Sirs;As CBS module activated, the following message is appeared, CBS may detect some error when creating shop order. Routing master setup for the production parts may have something wrong.PLease help. Regards;Yasuda
Hi Community,we want to have part_no keys created automatically by the system.One company is already using several ranges for parts in IFS Apps 10 today.Now we need to develop a concept for Part_no ranges on a global level, which is usable for several sites. Challenges: Using a sequence could provide a part_no which is already in use should we put a prefix per company or simply one ascending number or a combination of both how can IFS Apps support this setup? Or do we need to develop something?How do other customers resolve this challenge?Thank you for any feedback / proposals / sharing your concept :-)Regards Martina
Hi, what is the smootest way to receive more in a defined lot/batch Qty on a shop order? In our current process, the output is variable and hard to predict. Whith the same amount of components, we sometimes produce more (or less).As the finished part is lot tracked, we create a Lot nr up with the expected qty. However, if we produce more, we nowincrease the lot size manually increase the Lot/Batch qty manually adjust the components ‘Qty per assembly’ so our stock is still ok receive the correct ammount I believe there must a more user friendly solution for this? Thanks!
Hello All, I’m attempting to grant access to a user to view the contents of Database Task Chains in IFS 10. I’ve granted access on the Permission Set, and the user can now create database chains, however, they are unable to view any chains they have created. The table is blank when they attempt to populate it. I am able to view the contents, but I have the IFSAPP full grants. I’m assuming there is another area the user needs access to, but I do not see anything in the help that indicates what needs grants. Any help would be greatly appreciated.