Hi,
In a shop order we can see three cost calculations
- Standard cost
- Estimated Cost
- Actual Cost
For a repair shop order how this cost calculation is done ?
I can see standard cost values are inherited from the part cost (cost rollup) of manufactured structure, which is not correct in my opinion.
Also when I check the actual cost, it has taken estimated cost of the components which are used to manufacture the part. This is not correct. When doing a repair , manufactured structure components are not used. Repairing is done for an already manufactured part. In repairing process, may be new components are not used at all and only few operations can be take place.
I don't see the cost is done correctly in a repair shop order. Can someone please describe above three cost calculations for a repair shop order (Standard, Estimate and Actual)?
Note: I'm using IFS Cloud 22R1.
Thanks in advance.
Kind regards,
Yashodha.