This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
Community,Have you experience handling below error?Below error is from repair shop order when doing goods receiving. but the part 1066883-07-HY-0056 is already issued to this repair shop order.kindly advise. Thank you.
Community, in our manufacturing site, Part A is part type Manufactured, so does in Engineering Part. Now we decide to purchase it instead of building it, then we changed the Engineering Part Provide Code from Make to Buy. but when we are doing transfer, we encountered an error, see below, may I know what is the right procedure to resolve this issue?
We have a situation at a customer where they have a multi-level Repair Shop order that have been received and now have to be unreceived so that the purchase order receipt that the part came in with can be cancelled and the correct part added to the PO and be received.The system does not allow the unreceive of multi-level repair shop orders.What will the process be to get the item unreceived so that the Purchase Order receipt can be cancelled?Any help will be greatly appreciated.
Hi,what is the reason for MRP Planned Demand lines in the inventory part availability planning window? There are no actual demand orders generated in the system for these lines.
Hi,Is there a way to have a picklist generated and reported for a shop order but not have it automatically issue to the shop order? We have distinct separation between the operators who pick the stock and the operators who use the stock.We would like to have it so that the “Warehouse Team” carries out the picking and the “Operations Team” carry out the issuing to the shop order.Any advice would be appreciated.
Hello, How do you make another structure the default one? Is the only way marking is as “*”?How can we phase out the *Alternate? Thanks for any input,Alina
Hello, Our business works on a project basis. We want to be able to reserve parts and track them, from procurement to production, on a project basis. So we are evaluating the possibility of working with PMRP.Where it gets complicated is that we need to purchase for some article larger volume to take advantage of economies of scale. With the possibility of taking into account the surplus stock in the calculation of the PMRP, our need is met. However, we are encountering a blocking problem at the purchasing level. It seems that the PMRP does not take into account the ongoing purchase orders for inventory replenishment (therefore not related to the project). The PMRP does not consider them and asks us to buy the parts, while a purchase is in progress at the general stock level. Have you encountered the problem and is there a solution? Thanks in advance for your expertise!Regards, Coralie
Hi everyone, Our quality department needs to track certain lots.For this, they need to be sent an email (for now the best option), for when the lot is issued in a shop order.The way I’m thinking of doing this is to create a custom field on Inventory Part in Stock or Lot Batch Master, and based on that, create a custom event on issues from a shop order, when this custom field is not empty. My question is if this is the best option, or if anybody sees a more efficient solution for this?Thanks,Carlos Mendes
Hi All, Our customer would like to use a Rental process for certain machines. But his machines are ‘Configurable Sales Parts’. I tried to set-up a Confirable Sales part with Sales type ‘Sales and Rental’ but this seems to be blocked by IFS. This seems rather strange that we can’t have a rental for configurable machines. What is the solution to this issue? Best RegardsRoel
using shop order pegged materials with multilevel product structures. The top-level shop order may have 1 or more component rows that have a shop order pegged to them as supply. Those next-level shop orders may also have 1 or more component rows that have shop orders pegged, and so on. When scheduling the orders in APB we get an incorrect plan. The problem is that neither of the 3 planning settings (Infinite, Finite, Always Finite) give us a plan in the way we would expect for these material lines, and also does not give us a reflective view of the work center capacity plan, as the demanding shop order may not schedule when set to Always Finite, schedules before the supply orders when set to Infinite or schedules far out into the future when set to Finite.
Hiwe are using IFS 7.5. The system here has been used since 2009 and never really cleaned up. We are implementing an upgrade but in the mean time we would like to tidy these things up.We have shop orders dating back to 2009. Is there a way to mass close / delete shop orders without doing any further issuing of materials / Operations? We have done stock takes etc so don't want to impact any materials. We just want these orders to show as closed.
Hello together,is anybody familiar with customer warranty and supplier warranty?Are there special functions behind it? Thank you and regards Markus
IFS10 How do you make a native field required?
Hi, We have various shop orders with an outside operation for the same supplier. We let IFS generate the PR, and combine them manually into one PO. However, how we can quickly see the Operation Material Allocations (=components that also need to go the supplier) without looking at the Delivery note? We would like to add them to the PO if possible, or at least have an overview of every outside operation with its Operation Material Allocations. Thanks!
Hi to everyone,Environment: IFS Cloud 22R2 Looking for a solution for a machine manufacturer Topic:In case a request for a demo/rental-machine comes in, the machine has certain requirements. In many cases, an available machine needs to be adjusted to fulfill the needs of the client.For example, the customer wants to rent a configuration 1 machine, but there is only a configuration 5 in stock. Required solution:We need to define the flow how we will communicate the changes that need to be done on a machine before it can be rented out.And is it possible to issue a part with a certain configuration on a work order and return another configuration of the same part? We appreciate any help - thanks in advance!Best regards,Nadim
Hello,We are a new IFS customer and are in the process of implementing IFS Cloud 22R2.Our company does a lot of customization so we have a lot of parts that can be in all colors. In our current system, we have 1 item code and this single item has in its characteristics the color. Therefore, we can use this part in hundreds of colors, we still have only one article in our ERP.We do not find this possibility in IFS. Although it makes sense to have 1 item code for 1 color, it will generate a lot of administrative work in our company for the creation and management of all these items.Do you know a way to manage the colors of an item without having to create separate codes? Of course we need to be able to order and manage them in stock by color. Thanks in advance for your support!Regards, Coralie
We have a need to have one invoice per shipment. The problem we are having is that when we have multiple shipments for the same order or different, it combines all the shipments into one BOL and one invoice. We need one invoice per shipment per order.Our shipment type on the customer order is set to AP (add to exiting shipment) instead of NP (create new). I was wondering if that might fix the issue.
Community, have you seen this error. when we are trying to select an Alternate Part, system prompt this error. Thank you for advice.
How to restrict user to issue RM by following FIFO in the shop order or Material request? User must issue goods from the first lot that means according to Minimum receipt date of the lot. Is there any option in IFS10 to do this type of operations? Currently user are free to select any lot to issue from stock.
Hi,How does a user can retrieve the previous results keys for reports run as Quick reports ?Are the report keys are getting archived ?
Apps10 Upd11.Weighted Average, Cost per Part.I have (1) of part A in stock, inventory value = $1000.I receive (1) of part A into stock, actual cost = $2000.I now have (2) of part A in stock, inventory value = $1500/unit, total of $3000.When the inventory unit value changed from $1000 to $1500, is this revaluation ‘event’ visible anywhere, is there any history of this for someone to see? Or is this just behind the scenes and no record of it is stored?
Hi, which is the easiest way to compare a certain routing with actual clockings? We would like to see how much the real clockings differ from the routings, and update the routings afterwards (if needed)Important is that we see different different part revisions/ routing alternates if applicable.It’s for planning purposes that we have correct routings, costing is less important for this thanks!
We have the following CRM process flow: creating a business opportunity reviewing technical and commercial feasibility creating quotationOur question - where would you recommend to document the technical and commercial feasibility in IFS?Our idea was to do that in a new project, where we also have the possiblity the book time spent on the feasibility study. Unfortunately it is not possible to link a business opportunity with a project.
In App 10 testing one of the customer who I am working with, received following error message when trying to copy a project - the dates for the project are within the dates: calendar * has not got enough working days in the period you want to copy the project to! Make sure the calendar is generated for the entire project period
Hi there, We are about to start using the SOD Analyzer in IFS10 and preferable do not start from scratch. I therefore like to ask if anyone has a good list of (standard) functional areas, conflicts between those functional areas and the underlying methods? Any input is more than welcome so we do not have to reinvent the wheel. Thanks in advance for your support!
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.