we have setup below event for send email remind manager approve absence.most of employee’s supervisor can received the mail, but one employee’s supervisor can’t received the mail, and we can’t find the trigger mail from “application messages” page, we can see the employee’s supervisor from “employee file”.
Hi All, In the “Absence Request” window once the Supervisor “Approves” the absence request it gets disappeared from the window. Is this a bug or is this the way the window works? if this is the way this window works which window can use to “Authorize” an “Approved” the absence request. Regards,Nuwanthika
Hi Experts,Is there any field of cost center (CC) on employee file to find out employee costing(which cost center bear cost of this employee).
Hi everyone,When assigning personnel, I want to write the validity start date as the start date of the personnel. but when I enter this date, I get an error as follows.I have done the following checks, but I need help on which table is stuck on the date information. 1. department validity start date2. position validity start date
Hi all I have had an error occur when trying to look at the list view of an “organization” in the personal portal, [ORA-06502]: PL/SQL: numeric or value error: character string buffer too small ORA-06512: at "IFSAPP.HOLIDAY_REQUEST_API", line 2759 ORA-06512: at line 1). I have had a look and this error suggest that there is to many characters/numbers, however when looking onto this i can’t find anywhere that this occurs. this error is showing up on multiple views within the portal and happening to multiple people. is anyone able to assist?
Hi,Is there a way to add project time without impacting the schedule with specific report codes, like wage code of type information ? Otherwise how do you manage costs reallocation when employees work on several activities and they must indicate specific allowance that will impact project costs?On the top of the Time Registration you can specify on which activity you work, but you cannot use report code of type information that will not impact the schedule, and on the bottom part you can add any information you need but you don’t know anymore on which activity to backcharge the costs … any suggestions would be welcome.
Hi Experts,Is there any provision TO CARRY FORWARD Annual Leave (AL) current year to next year after completion of current year?Suppose employee have 10 days leaves remaining and current year going to finish this leaves should forward in next year like (20 this year + 10 previous year = 30days) now employee avail 30 days leave in this year. please suggest solution.
Hi All,I found an absence registration which is not calculated the Limit Used correctly. As per the below scenario, Absence Duration is 3 working days and Limit Used should be 3 days. There is no any public holidays within the period. If I RMB on the record and Regenerate Absence it will correct it as 3 days. Any possible reasons for this? Regards,Malinda
Hi All,An employee who works for a company is moving to another and what is the way to carry forward the leaves remaining to the new company
Hi Team, What is the possibility to employ a group of employees from one assignment to another in a different company? Can this be achieved in Group employee assignments?
Hi everyone!Is it possible to cancel travel request when it is selected?Thanks for infoRomana
Hi All,One my customer’s a has a request where they want their Supervisors to add Absence requests on behalf of their few Employees such as “Drivers”. When a Supervisor tris to create an absence request from the “Absence request” window an error occurs as “Insufficient Access Rights” Is this error occur because of a User permission issue ?if Yes, which Permission to be exact? If Not, What needs to be done? Window Error Message Regards,Nuwanthika
Hi All, I have two Employees who has been assigned to the work location ID “Thu” And I have created a “Employee Selection Template” and when I “preview” the Template details both assigned employees shows without any issue. But When I try to use the same template to load the details in the “Employee new Schedule Assignment” window, all the employees are getting filtered instead of those two employees. Is this a bug? or should anything else needs to be done to fix this.
Hi all, We are currently on UPD9, where we have the issue that terminated Employees are still showing as Supervisor for an employee. This should have been fixed in UPD12, so as we recently got access to UPD15, i got suprised to run into the next challenge… So for below Employee, it still shows a terminated employee as the manager , but now even two times. How is this possible? And where is the current manager now? Production: Showing terminated employees GTH021 & KBE077. (hardly visible, current manager MPExxx) UPD15: Showing terminated employees GTH021No longer shown previous manager KBE077. (good) nor current manager MPExxx - FAIL!) Extra Information:For MCP Time Reporting, employees are created in Multiple Companies, with only one company Activated for Master Company.New Manager has the same Position as the two former managers.Already Generated a new Position Access resultSo the big question. How is the Supervisor being generated and how can we ensure that the Current Manager i
Can we add deviation days for a group of employees at once? Best Regards,
The scanner we had for timekeeping died and was replaced with a Datalogic 1500i. The scanner identifies the barcode but adds #pp to the front of the scans, causing a conflict and preventing the clock-in. How do I configure the scanner to only use the numbers associated with the badge configuration and not #pp?
HiWe have changed our licensing agreement recently and I’m developing a report to show our full user licence holders. I also wanted to add a column to show employees that utilise the Time Clock CTU lincence in IFS Apps 9.My guess was that it looked for a tick in the box for ‘Time & Attendance’ in the Person Terminal Data tab of the Employee Admin screen AND that the employee needs to be currently employed. I get an extra 400+ records of the reported licence usage with this SQL…select * from terminal_personwhere TIME_AND_ATTEN = 'TRUE'and EMP_NO IN (Select EMP_NO from PERSON_PUBLIC_HR_INFO);Any idea what other criteria the licence management area applies to further reduce my results?
Hi All, Trying to do a direct role assignment. Below is the Graphical Organisation Structure. The CEO who is the parent position of RND. The objective is to give access to ADMIN parent position and it doesn’t work with the below setup. It works as expected when access role is assigned . Can anyone let me know what i missed.
Hi All, Could anyone let me know how the Employee Access group with the type ‘custom’ is used and in which scenarios and where the group is connected in creating or terminating employment. Best Regards,
I am trying to add some read only custom fields to the time card screen in IFS Aurena, in the hours summary group, but if I add field to the time card week screen in IEE, it doesn’t show as a field to add in the page designer in Aurena for the hours summary group. Only shows custom fields to add in the drop down in the header in Aurena. Is it possible to add custom fields to this area? Want it to show somewhere in this section.
Hello,I have created a substitute schedule marking June 27/28/29 as off days and assigned it to the employees and the days are properly marked as “OFF DAYs” in the employee file under schedules.Question : A person who has applied absence request from 26th June to 02nd July has to show only 2 days as the durationBUTThe duration is showing as 5 including the 3 days marked as “Off days” from the Substitute schedule.Is this a bug ? Additional info:the working days are from Sunday to Thursday and off days are from Friday to Saturday Calculation Unit : Calendar Days Regards,Nuwanthika
Reason behind this is some of the information which are available in employee clocking is missing in employee interval. When we manually re calculate its displaying the record as "Automatic". Later after we select both record and re calculate again the information is updating correctly in employee result. Do we have any automatic process to fix this?
We are going from Apps8 to IFS Cloud 22R1.We see an issue with the fact that anyone that anyone has the ability to clock an employee in/out on the timeclock or clock an employee in/out of a job.This can happen as an accident (if selecting from the drop down and mistakenly click on wrong one) or intentionally (if employee number known or by utilizing the drop down.)Has anyone else seen this as an issue? If so, were there any solutions/work arounds for this?
Hi All,One of my customers has a new requirement where the supervisor of an employee changes each month and the newly assigned supervisor is responsible to approve absence request and travel requests of the employee. I’m adjusting the Position structure accordingly but I believe once the all modules are in use we wont be able to do any adjustment to the position structure to accommodate this requirement. how can I accommodate this request without doing any changes to the Position structure each month ?Regards,Nuwanthika
how to make group above report in ifs report designer, I want to make report department wise employees department should be one time show. how to do this?