This will include questions related to FSM and PSO.
Recently active
MOBILE_WORK_ORDER_LTU permission set is missing for 24R1 in the share point. Is there a change in process on how to get this permission set for 24R1. The other LTU permission sets are present in 24R1 share point. https://ifs.sharepoint.com/sites/IFSCloudProdInfo/SitePages/IFS-Cloud-24R1.aspxProduct Version: 24.1.0
Hi Team we are continue showing some dataset delay in PSO schedule time any specific reason?
How can we filter records in lookup window, is there any way to do so?
Hi, Trying to add and set the field ‘contact.status’ as a drop down on the PLACECONTACTLOOKUP screen in the search criteria and default it to ‘Active’ contacts only. Tried setting the Default Value field in the properties for the control to the required value (AC for Active) but the default value doesnt show when the lookup screen appears. What have a i missed?
Hi all, In Microsoft Visual Studio 2022 (MS VS 2022), I noticed that the FSMVSPackage extension cannot be installed.I want to use the extension for the FSM Report Customization.The installation worked fine with MS VS 2017. I obtained the extension from the following post (FSMVSPackage): https://community.ifs.com/field-service-management-fsm-planning-and-scheduling-optimization-pso-249/fsm-report-customization-6080 My Current MS VS Version: Microsoft Visual Studio Community 2022 (64-bit) - Version 17.9.7Error message when installing: This extension is not installable on any currently installed products. Is there a way to get the extension to run? Or can I customize the extension so that it also works with MS VS 2022? Or is there a newer version of the extension that works with MS VS 2022? Best regardsLars Gießler
Hello, is there a possibility to filter after absences and see for example only the resources available for a period of time?I have tried with filter “Absence”, but then all resources disappear, and I have also tried with Activity type Miscellaneous Allocations (since PSO is integrated with Cloud), but I would like to filter after resources, and not activity.Do you have any suggestions here? Thank you very much.Iulia
HI All, Trying to access ‘Service > Work Management > Mobile Maintenance > Maintenance Survey > Maintenance Survey” but I get an error.Anybody have any ideas what would be causing this issue and how to resolve? Best RegardsRoel Error message:IFS Web Version: 23.1.5.20230907071950.0Date: 2024-06-07T09:19:25.422Z---------------------------------------------------------------------------WorkTaskSurvey/Surveys (server error)Unable to fulfill the request due to unexpected server state.Error details: N/ARequest Id: a0d49f48-a7e6-408a-9379-6be12e306d3cUrl: https://xxxxxxx.ifs.cloud/main/ifsapplications/projection/v1/WorkTaskSurvey.svc/SurveysSet/IfsApp.WorkTaskSurvey.SurveysEntity_Default()
Do we have any tool using which we can upload data directly to IFS cloud work report lines via excel upload.
Hi,There are technicians in who are associated with several Zones (Example ABCD, XYZ, Etc).But when assigning availability shifts in PSO (24/7, 24/5, etc.), it does not allow the same technician to be scheduled in two or more Zones. How can i identify what time that Particular FT is working for Both division or single division? Do we have any option available in PSO. Example here is Shiyaz left in Gray in this ABCD, since he is with another shift in XYZ. And he should be available for both zones and others. Regards,Shiyaz
We are doing some research into some of our markets and want to see why the ABE told us certain appointment slots that we asked for we unavailable. To my understanding, if i go and use the explainability service right now for an activity that was scheduled 2 or 3 days ago, it’ll validate who it would schedule to right now and why, vs what the plan looked like at the time of booking. Can we use the explainability service somehow with old plans (the plan used when creating the appointment request maybe) to see why it might have chosen who it dad back then? Can we use an API to create requests for the explainability service?
We’re getting hundreds of these warnings in the PSO Events view log every day. Any idea what config/conflict is causing this? We’re using FSM as the EA to PSO.
In PSO Events view we’re seeing many warnings for “Failed to add travel for resource xxx activity as started travelling at [date time].”Does anyone know the root cause for that so we can ensure scheduling and updates done correctly?Using FSM as the EA to PSO, and mobile devices to update FSM.
We have the problem at PSO 6.11.011 (it is fixed in later version), where columns was merged together.Previously we solved it by delete the account and create it again - exactly with same credentials. Has done it for 2-3 dispatchers several times.For one of the users, we used the same solution. But as he was the owner of the Filters, he is no longer able to delete old created filters.Can anybody advise what can be done to solve this problem? Can we delete this filter or change the owner of the filter from database? or from the application itself?Please note that I can not find the table which contains this filter details. Can somebody guide here?
Hi all,IFS Cloud/PSOI was wondering what are the configurations/basic data to Schedule automatically with PSO in IFS CLOUD.Are there any committ rules on IFS CLOUD as well? Currently the flow I am running is as follows:1. Creation of Request creation and subsequent task2. Task allocation thanks to PSO3. Dispatch clicking button "assign" to validate/modify PSO scheduling on DC Console4. Dispatch clicking "Transfer to Mobile" to send it to the resource on the mobile 5. The flow continues in the standard way thanks to the MWO Service. Is there any way to automatically validate the scheduling done by the PSO without the Dispatcher clicking Assign on every task (ex: the night before/after every hour)? I was thinking Commit rules or a Job?From my tests, Assign is important to generate the Work Assigment and to allow the "Complete" status on the MWO to update the status from Work Start to Work Done. Am I doing something wrong?
Hi All, I’m trying to find where it managed to make the complete button read-only.Anyone knows? By default, it’s read-only when task is not in status ‘In progress’
let me know how to check PSO user ViewAllDatasets define in Database ? its means table name
Hello experts,Background information: PSO standalone/Integration with EA & PSO hosted in IFS Cloud'https://host-pso-dev.ifs.cloud/ifspsoworkbench/hostl/administration/users'The integration users has been granted permission to GatewayBasicHttpAuthentication Postman is setup as follow: Unfortunately, when I execute this POST I get a Postman Status: 401 Unauthorized.Have I missed something? Please advise.Many thanksMiguel
Hello,We are using IFS Mobile 6.25.8597 (Rev.2) under Windows and are also testing the use under iOS. Here we use IFS Mobile 6.12.7886 (Rev.2). Do these versions correspond, or is there also a version 6.25.8597 under iOS?Best regards
Hi All,In the mobile fsm app, I have a list with rows with ‘Allow Modify’ set to true, so user can edit the values of that record.I’m now looking for a way in mobile to set a Row on that List to Read-Only based on some conditions. The only (possible) solution so far is to set all the fields within that row (linkend screen), to read-only.However I prefer that they can’t go that linkend screen at all, so ‘disable’ the ‘Allow Modify’ function.Regards,
Due to the nature of our business, we have a dataset that is very low volume. This dataset is for seasonal installations (so the summer months have more volume) and resources in this dataset are only booking appointments for accounts they installed. Because of this, the overall plan quality for this dataset is much lower than our other datasets that book non-seasonal work. When we do request availability for resources in this dataset, we have been noticing that the ABE is not offering all available appointment slots. We see a lot of appointment offers where Available = False and Reason_Code = 470, despite a few resources actually being able to accomplish the work during that time frame requested (Sufficient drive times, skills, time allotments, etc). When we analyze these situations, the ABE is stating that the appointment offer came back as Available = False because it would decrease the overall plan quality. Since we are booking to a specific resource, we don’t care about the overal
Hi ALl, When we have a Work Task assigned to a FSE, we use the MWO so we can track his travel/waiting and working time. This is being tracked very detailed per minute, per second, but we want to invoice per hour started or even per half day started. (so always round up). How do we do this exactly? Is this based on the Sales UoM of the Non-inventory Sales part? It seems something that we should be able to do quite easily but I never spend much thought on this. Best RegardsRoel
Hi community.I would like to know, if there is the possibility in 22R1 and 22R2 to create a Request from a project activity. Backround is the simple fact, that with the request management, the process for the customer would be better. However Work Order will be used, if the project activity is unable to create request. T&RDADUDE
Hello,Does anyone know why FSM skills with the symbol “#” are not integrating over to PSO?When I try to add the skill, they show up in the list but I am unable to save.
We recently upgraded our PSO instance to the latest version, and now, on screens like the Planning Resources screen, the time zones listed as local times / geographic location ex. America/Los_Angeles) as opposed PST (Pacific Standard Time).How can I change the time zone format back to using PST, MST, CST, EST, etc.…?
Hi,In resource planner for one dataset with multiple division can we have only one rota?
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.