This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
I am trying to use Command_SYS.Mail to Attach file created on the Database Server.I figured out how to attach a file from the Application Server, but my Package will run on the Database server and create a file on the database server.Is there anyway to tell Command_SYS.Mail to Attach a file from the Database Server rather than the Application Server?Version: IFS App 8.Thanks for any help.
Hello, We have encountered an interesting issue. I wonder if anyone has a solution to this. Process which we would like to have in IFS is:Company manufactures Part A that is serial tracked and it should stay this way.In most cases Part A is a finished good, but sometimes is further processed.If further processed, Part A is a component to another manufactured Part - B. Part B is also serial tracked and it should stay this way.Part B, in simplification, is made by cutting one piece of Part A into two pieces of Part B.So, from one serial number of Part A we receive two serial numbers of Part B. #There is no way to create Product Structure of Part B including component Part A, as qty in assembly cannot be 0.5 for serial tracked parts.#There is no way to receive serial-tracked By-Product.#There is no way to issue on Shop Order (lot size = 2) just one piece of A and receive 2 pieces of B.Running out of option here, or is it just lack of imagination? :) I'd be grateful for any ideas.Regards,
Hi, using APPS 10 and experiencing a slight issue with the ‘Reserve/ Issue from Loc’ specified on the product structure not being pulled through to the shop order (see below).the structure revision on the product structure and shop order are the same and on the inventory part ‘Reserve/ issue from:’ is set to Only Specified Location to ensure it only reserves and issues the material from the correct location (below).When checking the Reserve and Backflush Visualization on the material line within the shop order is shows there is no locations acting as priority to reserve from.does anyone know what else could be casing this?regardsJamie
We just recently upgraded to IFS 10 UPD9. In the past when we modified Standard Operations, we would RMB and Propagate Standard Operation Changes. In the pop-up window the Replace Work Guidelines and Replace Tool Info were checked by default. Now they are not. Is there a way to make the default be checked? (see attached screenshot)
Hi, I’m not sure if its even possible, but can a shop order output several different part numbers?i.e shop order is for a family of parts to restock a shelf, so the parts produced would need different part numbers, so that they can be consumed by other orders.Thanks
Hi, for IFS Inventory Couting - Coute Report, does it support the following situation:1. Parts actually existing in Location physcially, but not in IFS DB, how to report this?2. Same like above , for Lot/Serial managed Parts, does it support above situation? In Reality , most case is , the parts put on the wrong location/shelf.eg: In IFS DB, Part-A in Loc-1 , while physcially, Part-A in Loc-2.For IFS, we can report in Loc-1 - Parts-A : qty 0while we CANNOT report part-A in Loc-2. How we deal with this?
Hi, In the current lay-out of our advanced planning board, all shop orders are showing line by line, in a step wise matter. Isn’t it possible to see them all next to each other, on one line?If i have many shop orders on different workcenters, i cannot see them all on 1 page. Also, it is possible to change to workcenter of a shop order in the advanced planning board, or do I need to do this in the application itself and reload? thanks!
Hi, For a customer who is in UPD 8, they are unable to search with 'Source Ref' field in Deposition shop order window. Has this been solved?
Community, A question for APB. do you know how to save my own Gantt Chart List in the APB drop down list? e.g. My Own Shop Orders. please refer to the screen shot attached. Thank you.Ron
In a shop floor, the time and quantity reporting may happen in different time phases. Lets say , some shop floor has sensory devices where once the final goods are coming out from the conveyer, the number of units being produced are immediately reported to the ERP ( so to the APS- Advance Planning and Scheduling System). In some instances, may be not so immediately but fairly quickly after one batch of items is made. Usually by the machine operator. May be later in n the day by the shop floor supervisor. This could go even weeks and the items may be reported once the order is ready to ship out and reporting may be done as backflush operation.In any case, The quantities and times are updated to the software system and the current production plan should reflect the effect of these reporting. Lets take a simple example, A production planner of metal fabrication company create a production schedule for 1 month but constantly updated based on new customer order arrivals ( lets say daily
Is there any way to set status 'Tentative' to a Routing whose status is 'Cancelled'?We have Routings whose status are 'Cancelled'. We'd like set them to 'Tentative' status for some reason.Is there any way to do it?(This is a case that a status before “cancelled” is “Plannable”. We know if it was “Tentative” before cancel, “Review” RMB sets its state “Tentative”.) Using APPS10Routings tab on Engineering > Routing > RoutingThank you.Kazu
Dear IFS Community, In my company we’re working on a solution to control documentation associated to a PO sent to external users. We’ve spotted that Document Transmittals serve our purpose. Do any member has experience on this? The idea would be to create a RMB, or an event, that when triggered from a PO would create a Document Transmittal with all Documents associated to the PO. Thank you in advance for any input on this matter.
We are running Cleanup of Inventory but no records are removed. We upgraded from APPS9 Upd#6 to APPS10 Upd#11 in September, Background job for Cleanup of Inventory show “Ready”. Is there something else we need to do to remove records from Inventory Part in Stock with “0” Qty on hand”. What am I missing? Thank you.
Hello all! Sometime, some operations is sub-contract in our shop order, because we have no capacity. A purchase requisition will be created automatically When ‘Ship WIP to suppliers’. Then buyer release PR and ‘requisition to order’. But sometime, after done these actions, the planner find we have capacity to manufacture this operation in our workshop, don’t need sub-contract this time. Then planner user reverse WIP shipment. Then delete this operation. At the same time, the related purchase order is canceled also. But buyer don’t want planner have right to cancel purchase order line, because buyer need confirm the PO status with supplier first. Maybe the supplier has finish the production, the PO line can not be canceled.My question is, how to forbidden planner user cancel PO line when he delete the sub-contract operation? The system just delete this operation. Don’t do anything on related purchase order line. The planner need inform buyer and then buyer do the action ‘cancel PO line
Community, borrow your brain here. we would like customer order line with package part, not be involved in the planning, so we need to uncheck “Release for Mtrl Planning” this box on customer order line, but system prompt the error. it said cannot be updated for package parts.how to make this happen? Thank you.
Is it possible to create a Kit - Part Number, that will relieve inventory of all the parts that make up that kit?
Hello - we are looking for a resource to guide us through getting IFS FDA certified for CFR 21 Part 11. Has anyone been through this process or worked with an IFS consultant to accomplish this? We have been spinning our wheels now for a couple of months and are hoping to get some traction through crowdsourcing.
Hello, I wonder as i said how does work “Extended Fiend Validation” option at rmb. And let me know why these “Warn If Result Selection Combo Exceeds” is passive at the “Purchase Order Line Part” area. I Though it can reassign the max records for shown in some screens, but i was not used it before. It can be usefull, if u let me know how it turn to active. Best Regards.
Hi, When we try to use the connect tool functionality in Manufacturing control plan, the following issue occurred. The connection can’t be created. What may be the possible root cause? Regards,Peshala
Hello,We are using IFS apps 8 SP2.While login into application with IFSAPP getting below error.Below are the information regarding our IFS environment.IFS Application version- Apps8SP2 on windows. LDAP configured (All end users mapped with AD are working fine and able to login in the application without any issue) Facing ‘Operation time out’ issue with IFSAPP user only because it is automatically bypass the LDAP authentication and use database authentication. Getting same error if we try to open the application from ifshome with ‘Ifs.Fnd.Explorer.exe’.Ifs.Fnd.FndSystemException: Unexpected error while calling server method ClientApplication/IdentifyCurrentUser at Ifs.Fnd.AccessProvider.FndConnection.InvokeInternal(Object requestBody, Object responseBody, String intface, String operation, FndRequestContext requestContext, FndManualDecisionCollection decisions, Boolean forcedSync) at Ifs.Fnd.AccessProvider.FndConnection.InvokeInternal(String intface, String operation, Object requestB
We have a situation where the customer is running in to a system crash for ALL users due to a middleware server data outage when running certain query parameters in the manufacturing visualizer from time to time.>> How was visualizer designed for and what technical limitations are related to the design>> What is the best practice and what action could be taken to mitigate a risk of such a system outage by using a query parameters that visualizer was not defined for? A simple typo could cause such an incident.
Working with a US customer that is about to start manufacturing one of their products in the UK, and have lots of parts in the BOM’s with UOM like feet, inch, gallon, lb, ounce, etc. They asked about having different UOM’s in the UK versus US and how could this work with Engineering Transfers to the different sites. They use Engineering Parts & Engineering Transfer today. They have the full CAD integration to IFS, and their drawings are also in the IFS doc man database.It is possible to have a different Inventory Part UOM versus the Part Master, as long as it’s same type of UOM (length, volume, weight) and the conversion factor is there. Inches to centimeters for example. However when it comes to Engineering Transfer, IFS does NOT do the BOM quantity conversion if the site’s UOM is different than the Engineering Part UOM. You get a warning on the different UOM, and it transfers the BOM with same Qty as on the Engineering BOM. You would have to convert it manually after, or us
What is the proper process when making entries for cycle counts and a part is reserved? We are preparing for annual physical inventory (only 2nd one in IFS) and had major issues with this last year at implementation. I have been advised that when counts are being entered that is different than what may be on hand and reserved that you are not allowed to save any of the entries on the current count sheet. Why is that? Perhaps we have a setting that is incorrect? Please advise ASAP, we are counting first week of Jan 2022 and I do not want to have to unreserve all the work in process at this point.
According to IFS Custom Menu type "PL/SQL Block" can be executed on both single and multiple rows but this is not the case while i attempted to do a simple display to see if it really works. Even though i selected multiple rows and run the Custom RMB menu it only processed the first row. Remaining rows are not picked. My code in the custom menu pl/sql block is as follows.This is on the purchase order lines. Trying to see the order numbers the error sys picks to see if all the selected orders are picked. DECLAREattr_ varchar2(32000);BEGINattr_ := &ORDER_NO ;Error_SYS.Record_General('PurchaseReqLine', '&Order_no:' || attr_);END;I selected the following rows and clicked on process multiple rows. The display is only for the first order I expected it to show all the three orders. Request to know why all the three rows are not picked.
Hi all,is there a way to translate part class in LU EngPartClass?I cannot find a possibility. May be there is a way over Basic Data Translation, but LU EngPartClass is not available there. Thanks for a feedback.BR,Jan
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.