This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Recently active
For Shop Orders we have function “Mass update Shop Order structures” which you can use for component replacement in many Shop Orders at once. Do we have the same function for DOP Orders?
HiI’m having an issue where the operation after a set of parallel operations does not set as executable thus preventing the operation to be done on the shop floor workbench.
If a component i.e. “AG-TF-SUB-02“ is defined as “Not consumed“ in product structure and is driven by Master Scheduling and the assembly i.e “AG-TF-SUB-01“ which contain “AG-TF-SUB-02“ is driven by Master Scheduling it isn't recognized the “Not Consumed“ Status of Component AG-TF-SUB-02 and demand for “Not Consumed“ Component Part was created. Would like to know your opinion about this behavior. Product Structure AG-TF-SUB-1 Master Schedule AG-TF-SUB-1This is correct Master Schedule AG-TF-SUB-02Is this the expected behavior ? Subsequent MRP of Parts work as expected.
Can I phase in and phase out a revision on the same day?
Hi, Can someone indicate how this page works and its benefit plz. As it stands, when I paste a part no. into the search and enter the screen the page is blank. Are there preliminary data requirements? thanks, Joher
when we use MRP Type code of G with a cover time of 5 days on a Manufactured part, it does not combine the requisitions into a single requisition. Has anyone successfully used G codes on Manufactured parts
I’m facing strange IFS behaviour in Routing in IFS10. When I choose “Labor class” then in the field “Setup labor class” there is shown the same record. And after saving it disappears. It is impossible to choose different “Labor class” and “Setup labor class” in one edition. You need to save line and then choose the second value and save again. Do we have a fix for this bug?
Dear Experts In Window Control Plan - Manufacturing, may you suggest me how to set the number format in field to do not deduct 0 (Zero) behind?For example if I input criteria value or measured value is 2.500 the system will show 2.5 but I need system to show like this 2.500 instead by remain the number of digit after decimal point as I set. RegardsNithipatch
I have a strange request. A user wants to suppress printers setup in the print agent when the print dialog appears. I don’t think this is possible without removing them. Can someone please verify this or offer wisdom into how to do this? Thank you!!
Hi all, I am working on quality management subjects and I would like to create Audit and Non conformance report from customer order page. First of all, I know that should to add object connections page to do this. However, I can not find services relating to Audit and Non conformance report. Could you please help me find the services? ThanksOzge
Community, would like to borrow your mind here. Multi-site BOM set up procedure.for example a manufactured product 20-100. it is to be manufactured in 2 sites.20-100 (manufactured) - site 10120-110 (purchased raw) - site 101 20-120(purchased raw) - site 101 20-120 (manufactured) - site 102 20-121(purchased raw) - site 102 Site 101 will do final assembly for part 20-100, site 102 will manufacture part 20-120 and via distribution order transfer the material 20-120 to site 101 to do the final assembly.so, question here. from Engineering Transfer, how I could transfer to site 101 with part 20-120 Purchased Raw part type? since part 20-120 is already defined as a manufactured part. I have tried Detailed Transfer, in Engineering Part Transfer Graphic window, the part type cannot be changed, as I am planning to change the part type from Manufactured to Purchased Raw for part 20-120 in site 101. Thank you.
Have a query on scheduling inventory control plans for serial handled parts. When scheduling the inventory control plan, the analysis result generates a single form, but without the lot/batch numbers and serial numbers which the user has to select. However, lot/batch appears to be mandatory to enter and as such the created analysis can only be used for one lot/batch. Is there a way around this, as the customer has potentially tens/hundreds of batches and serials.
Hi, How to check who is performing copying cost set to cost set one, since we can only see the time stamping, but no user id.Thank you.
Hi,In DOP structures there may be many shop orders connected through structure relationships. If the machine shop resources are finite, upon creating a finite schedule for the shop orders, the relationship between respective parent DOP orders has to be respected also. APB is capable of doing it. The planners are able to schedule DOP header ( demand header) , forward , backward, drag-n-drop or insert : where in any case, the operation relationships, DOP order relationships( structure relationships) and the resource constraints are respected.Can you share the experiences in using this functionality ( pros and cons). How often this functionality is used?On the other hand when it comes to Operation Blocks, APB is capable of loading operation block as single object ( along with its operations) but APB does not keep the operation block scheduled space in the resource exclusively for the operation block. The operations in the block can freely schedule in the resource timeline if there are no
We are currently facing an issue where our WIP is being driven to a negative balance that appears to be driven by partially completed shop orders. As customer demand fluctuates, our production planning schedules are adjusted based on the priority of the newer orders/jobs received. Orders currently in process may be paused to start the newer, higher priority orders. Because of this, we have many shop orders which are processed partially, have operations reported partially and have shop order receipts received partially into finished goods. At any given time, there are a large number of shop orders found in partially completed status.The partially completed shop orders are receiving the full cost of material and labor into finished goods instead of a proportionate amount of material and labor. As a result, it appears that more cost is being taken out of WIP than has been added to it. For example,A 500 piece shop order is partially completed with 300 pieces. Expecting only the following t
Dear All, related to seasonal business we have the case that some machine capacities are fully loaded. To reach necessary quantity we set up additional manual assembly process for that time. So for one product which needs to be assembled we have an automatically process (e.g. for 80% of produced pars) and additional to that an manual process (e.g. for 20% of produced parts). If we use the routing for machine process for calculation, the part is calculated to cheap, if we use the manual process the part is calculated to expensive. Is there a kind of possibility to mix that both production processes for one part number for calculation, which not impact production planning and logistic etc.? Thanks in advance for feedback regards Sebastian
Hi we are using apps 10 and wanted to know if there is a setting or configuration that can set the dates below on the Resource Analysis screen red if the dates are in the past from now?regardsJamie
I am trying to get the NET WEIGHT field in INVENTORY PART filled in. The help says it comes from Master Part. I have a net weight in Master Part, but it doe not populate over to Inventory Part. I am using Apps 10 Thank You, Dave Lyon
Community, will “Plan Alternate Component” check box should be checked when running MRP? if i want the alternate component to be involved in MRP calculation? we did this, but looks like nothing changed, do you experience the same? Thank you.
Hello everyone. We’re on IFS 10 update 11. We’ve recently noticed an issue with part revisions that has us very concerned. We’ve reported the issue to IFS but haven’t got any resolution or information about what may be causing this issue. Wondering if anyone else has seen this issue.When an Engineering Part is up-rev'd and transferred, the most current existing Inventory Revision should be phased out and a new Inventory Revision created with a new phase in date correlating to the new Engineering Revision. Current orders that are in process such as started Shop Orders, or closed orders such as Purchase Orders, Shop Orders, Structures and Inventory Parts in Stock should retain their revision. However, we have observed that the revision of the parts on closed PO's, Shop Order Structures, and Inventory in stock are all updated. Instead of the current Inventory Part Revision with the former Engineering Revision being phased out, it is being overwritten.
In Aurena I noticed that I get an error when the alpha value of a part contains a '?’.Any idea if there are any other characters that can't be used?Before:Now trying to insert a ? at the end of the attribure value and pressing Save:Is this truely programmed as such?
In IFS Cloud I am able to create a Prototype Shop Order, produce a serialized part, receive it into inventory and reserve it on a Customer Order. Is it normal? I don’t think it is correct that a prorotype could be sold, furthermore with the same price of a normal item.Could anyone explain me if there is any setting to prevent this scenario?Thanks a lotStefano
I want to do an monthly report with work in progress data from shop orders.What is the nice way to get it done ?The costs under the Shop Order costs page are reliable for this purpose ?
We use standard cost which we calculate every month.Is it possible to automate so new parts automatically is calculated once they are released? So only calculate standard cost on parts where it is zero.Is there standard functionality to achive this? It would be perfect if we got an automated report daily saying “These parts are calculated today and here is the result” Any input is appreciated!
Hi,Is there a possibility in APP10 to see the complete manufacturing lead time over all production stages?