Hi all, Does APB consider/schedule shop orders with a PARKED status? My understanding is that it doesn’t regardless of how APB is ran. Thanks,Jay
I would like to know if there is a way to manage actions sequencing in the change order actions because some actions cannot be done if the previous ones are not completed (Apps 8).Thanks
I duplicated a project from the IFS Projects window, I changed the project id, saved it, then I open the copy project wizard to copy everything from the original project to the new project. I accept all of the defaults, put in an early start day of a couple weeks ago. when I run this I get the following error:Server error messages: 4a558c3f-b8a1-4c66-b435-d24dc82b275d Ifs.Fnd.FndSystemException: Unexpected error while calling server method AccessPlsql/Invoke ---> Ifs.Fnd.FndServerFaultException: ORA-00001: unique constraint (IFSAPP.TRANSACTION_SYS_LOCAL_PK) violated Unique index constraint violated. (ORA-00001: unique constraint (IFSAPP.TRANSACTION_SYS_LOCAL_PK) violatedORA-06512: at line 19ORA-06512: at "IFSAPP.TRANSACTION_SYS", line 653ORA-06512: at "IFSAPP.TRANSACTION_SYS", line 1257ORA-06512: at "IFSAPP.TRANSACTION_SYS", line 1277ORA-06512: at "IFSAPP.PROJECT_CONN_REFRESH_UTIL_API", line 981ORA-06512: at "IFSAPP.PROJECT_CONN_REFRESH_UTIL_API", line 999ORA-06512: at "IFSAPP.PRO
We are in the process of implementing IFS for the first time, so this might be a newbie problem, but this is my first time working with the RESTful APIs in IFS10. We have a 3rd party application that scans the barcodes of each product as it comes off our assembly line, and records a timestamp in a separate SQL database identifying when each finished good was completed. They are identified by the Work Order and Sequence # from the shop order. I’ve been tasked with modifying the app to push this info into IFS updating the work order. Unfortunately, I can’t simply close out the order line each time a product is completed because most order lines have large quantities. If the order line has a QTY of 70 (for example), I need to be able to log each one of the products as a unique transaction incrementing them until the total equals 70, then close the order line. How would I log these transactions in IFS? If it matters, we do not log finished goods into inventory. They are literally stacked o
How do I configure the attachment type when scheduling a quick report. Currently it is attachment without any file type. Attached is how I configured the quick report schedule
Hello,I would like to register automatically purchase costs in the “Project cost registration -Non personal” window.When an expense sheet is authorized, automatically it is registered in the “Project cost registration - Personal” window. But, when a purchase order is invoiced or posted, it is not registered as a cost in this window.I could create an event, but I wonder if there is another way to get it.Best regards,Amaia
I am using IFS 8 and no matter what I have put in as an Expression, I get the error that the expression must return a date. I tried the solutions in other Topics, but none work for me.I even tried something really simple: SYSDATE + 1/3600; which comes directly from IFS Online Documentation and get the same error.Is there something weird about IFS 8?Any help is appreciated.
Hello, We are currently in the process of implementing IFS Apps 10. The system is setup as multi-site. We are a manufacturing company, and often times we have a part that will be manufactured across multiple plants. We may perform a stamping operation in one site, ship that part to another site for consumption in a Product Structure to create a finished part, which would then be shipped to a customer. We are finding that part setup can be quite tedious and time consuming. There is a lot of manual entry to setup an Inventory Part, Sales Part, Routing, Product Structure, Purchased Parts, etc. There are a few shortcuts I’ve used such as Standard Operation, Routing Templates, Copy Part, and creating a Sales Part first to have the Inventory Part automatically created. The vendor we are working with has suggested using a custom spreadsheet to create the parts and import them into the system from the spreadsheet. My feeling is that IFS has enough functionality built into it to streamline t
Has anyone used Transport Time in IFS Apps 8 ? What benefit would this give me over using Queue time on the Work Center
Hi, How to move part from one location type to another? Currently Part A sits at ‘Picking’ location but we want to move this to ‘Arrival’ or ‘Quality Assurance’ ? I am trying to move it using transport task but it is showing me an error that “cannot move to location type “Arrival” when not connected to purchase order. We have received PART A using purchase order. Please let me know how can we proceed on this. Thank you for your help.
Dear All, I am new in Aurena and don't know about Aurena development. Could you let me know about this that What is difference between Development in Aurena and IFS 10. Is Aurena use inside IFS 10 or we use in IFS 9.0 use also? Have anyone video then more appreciate and help me. Thanks in advance.
We have picking days set as 3 days but all Shop Orders seem to finishing just in time for the demand. We want stock to be on our shelves 3 days before it needs picked for the demand shop order or customer order. Anyone else having this issue ??? Or have we a setup incorrect ??
IFS Apps 10 UPD We have shop orders that are set to Auto Close but are not Auto Closing. The Close Code is set to Auto CloseThe Qty Complete is equal to the Lot Size StateMaterial = Completely IssuedOperations = Completely ReportedProducts = Complete Received Can anyone please advise what the program checks when the system attempts to Auto Close the Shop Order as I cannot see the issue. Thanking you. John
On the Engineering Part Revision screen, IFS provides a RMB option called Copy Services. When clicked, a dialogue box is shown which allows the user to specify a Source part number, and then select if they want to copy the Structure, Documents, or Characteristics (or any combination there-of).In IFS Apps 10, I can use this function to copy Characteristics (attributes, values, and Info) from one Eng Part Rev to another, but when i try the same in IFS Apps 9, the option for Characteristic is always greyed out. Details of my process are as follows…Open the Engineering Parts screen and create 2off new parts… Part No: RHU-TEST-111, Part No: RHU-TEST-222, Open the Engineering Part Revision screen, and search for RHU-TEST-111Open the attachment panel, select Characteristics,RMB, Select Technical Class…Select an existing technical class template (I used a tempate with ~50off attributes)Populate the Value and Info fields on one or more attributes.RMB, Save Attributes On the Engineering pa
In Operation clocking window IFS75 , account date and transaction date are not similar , there is 1 day dif.What could be the possible setting which caused this?No Time off set define in Time clock terminals / No site off set defined.Thanks
How can I identify common parts across various Product Structures
Hi, Does ‘Planning Alerts - Shop Order’ need to be configured (if so, how) before this page is useful? I’ve done partial testing by selecting ‘Approve Planning Alert’ for what is deemed as ‘Alert - High’. No changes occurred to the orders/parts question. At least, not according to the history of said orders. I’m not sure what to expect with this page, i.e. is this anything like actioning exception messages in other MRP vendors? What is the scope of these alerts? many thanks, Jay
Hi all,Apps10 has this nice new feature called ‘operation block’ for splitting reported time between multiple shop orders. But it does not seem to be working on the materials. Hence, how do we issue material the same way to multiple shop orders (and unissue afterwards)?
Hi all, I’m scheduling an entire product, to be manufactured from scratch, with MRP (Apps 10) and APB.How can I plan the upper levels of the bill, i.e. the assembly parts, to start only when the component pieces are projected to be available based on their CBS scheduled finish dates. So, the shop order for part .’..GA’ has an Earliest Start (as found in the header of the order) of much greater than whenever the requisition was accepted. Typical product:Level 0 = General AssemblyLevel 1 = Sub-assembliesLevel 2 = Piece Part Requirements Our capacity constraints are in making the piece parts (L2) which are time-consuming operations. Hence, I need to finitely schedule that list of parts in APB based on resource loading then, schedule the upper-levels to start based on the projected availability of L2. Tying materials with ‘Operation No.’ in ‘Product structure’ doesn’t provide assistance because the resulting action messages are downwards-looking. Early/Late Order actions would be among
Hello Guys. I am looking notes of Aurena, I don't know about Aurana anything, In my company started working In Aurena (IFS 10) in after few days. Please assist me, how can do work,developement in Aurena. Highly appreciate for such kind of help for us. Thanks in advance.
Hello,We have a question regarding fulfillment dates and feedback loops.We create a customer order for an item and put a planned ship date of 3 days from today Site MRP is run later and determines we will need to build the item and manufacturing lead time (and purchasing lead times) dictate it will take 3 weeks to buildIs there a mechanism in IFS that will alert (or modify) the original customer order that the original date is no longer feasible? Or are custom events or reports the only method?
Hi Guys, Kindly assist us that how to Copying user profiles and use other environment of same user in IFS 8 . Screenshot will be more helpful.
Hello,there are differents ways to create routing alternate by copy :from copy part,copy alternate , copy routing head …we would like to keep in all cases the origine routing alternate that create the new one.Is ther a way to get this information?Thanks
Hi all, Can I get a reference or manual for how to execute MS and then tend to any messages that may occur. What is the name of the page on IFS? thanks,Jay
Hi all, How can I update Need Dates for Shop Orders, in the event the Required Date for the independent demand against the top-level is changed?For instance, a product could be given a Required Date of next month. MRP then calculates backwards to determine the date at which each material in the bill must be available to salsify said date, using the component lead time (unprotected). I take it this is how Need Dates are calculated. But, if the business has a change in priorities, and we decide to amend our master schedule, I’d like to find a way to update the raised/released/started orders based on us having manually edited the Required Date.That way, when APB is executed over a group of orders, taking Need Date as a means to determine sequencing, it can reflect changes in our priorities at the top-level.Is there a report to provide this alignment? Any data requirements? As of now, we are not using pMRP or DOP. Just IFS Apps 10 (with APB for CBS Scheduling). thanks,Jay