This will include the questions related to Procurement, Demand Planner, ASC, and SRM.
Recently active
Hi – can anyone tell me if MRP will trigger purchase requisitions for status 5 parts that are showing inventory below safety stock?
Hello,I’m looking into setting up the Intersite automation and have a question. You need to set an Internal Customer and Internal Supplier in the sites. I want to use an existing customer/supplier to do this as we already have that set up, it’s just manual. I can only find an option to “Create Internal Customer/Supplier” in the site, I can’t choose an existing one. Is it possible for me to do this?Thanks,Mike
Hi Falks, What is the best way to handle Critical safety parts and which field/s can be used to identify a part as a critical safety part ? How to implement ITAR control for suppliersI know it a open ended question but at this state I am after info as much as I can find Thanks
Every module in IFS has the logic - first status planned and when ready to process release (purchase requisition, purchase order, sales quotation..) Apart from Customer Order whose lines are always in released status. That is causing our business troubles, parts not meant for MRP are considered by it, purchase requisitions are generated without project connection etc. We have to constantly search for ways to “trick” the system while our problems would be solved if also CO follows the general IFS logic. If there are business which want even planned lines to be considered in MRP, there is Release for MTRL planning option. Is there any way to preset CO having first planned status?
Hello Community, When raising a Purchase Requisition or Purchase Order, is there no way to consolidate the view of all lines in the document. Having to toggle between Part Lines & No Part Lines tabs is problematic when you have high volumes to deal with. What is the best transaction to view / manage these?
Hi Folks, Need your guidance here:Is there an option in IFS to not change the price on a line item if quantity is changed? We have a situation where an order line is entered with a certain price. The order takes a long time to fill and then the system reflects the new price when they try to change the quantity since now the price in IFS for that part has changed. I would like to know if there is a way to “lock” the price on a line item. Thanks.
how can we downlaod Latest purchase price for all items in IFS
Hi Guys, Can anyone assist me on below error while trying to convert Sales quotation to Customer order getting error: Regards,Vaishali
Hello, We are seeing this information message when a user manually receive/issue parts from a standalone material requisition. The message does Not pop-up when materials are receive/issue automatically. No expiry date is set up for the part. no availability control ID is set up at any level of the warehouse. the Asset class connected does not have an expiry date set up. No shelf life is defined for the part. revision is not phased out. Anyone knows what’s causing this?---------------------------IFS Applications---------------------------Reserving from expired quantity. Do you want to continue?---------------------------[OK] [Cancel] ---------------------------
Hi, I would like the approver rules for a Puchase Order being derived from which parts that are ordered, Like you can do with the Pre Posting tab in the Purchase requisitions rule. We now have a workaround using the coordinator, but this is prone for error. Any suggestions?
Hi, Anybody know where you can find back the supplier bank account a supplier payment was paid to?With payment method and payment address id I can go and check on supplier payment details but this could have changed in the meantime so would like to find the account used when payment was made (account included in payment file). Thanks,/Anna
Hi All, Do we have similar window/view to Delivery Note Analysis in IFS Application 7.5? BR Champika
Hi,Please has anyone perform Distribution requirement planning DRP in IFS and how do we do that if possible . Thanks Julius
Is it possible to preset the system that it first creates requisition and not directly purchase order for Internal Supplier?
Hello community,We are using IFS version 8Are there available documentation regarding MRP(Material Requirement Planing) for Supply chan module from IFS?something similar as “ MRP instruction from Customer order to purchase requisition“Would like to understand better its capabilities. Thanks in advanceDeepak
Hi, I'm preparing a warehouse demo for customer on APP10 UPD10.Inside the demo, I will set the "Stardard Putaway Qty" to 3.And set the PO Receive Qty to 5.So, I think when I perform put-away,IFS will cut it to two trasnport task1st: qty-32nd: qty-2While, it is still only one transport task.Is there anything I missing?(I already set the storage zone for the inventory parts.)
Hello, Are you able to disconnect a PO from one activity and connect it to another activity within a project? We would close the PO and create a new one but the PO has already been sent to the supplier.
Question, if you’re receiving customer schedule forecasts from Customers but they are for parts that are not Master Scheduled, where does that schedule go after releasing the schedule. I see the Demand Line in Inventory Part Availability Planning with a status Planned. But how do I clear that? MRP is planning for this. Typically when I import that into Master Scheduling, I no longer see the demand type of Customer Schedule Forecast, but for this case where I am not MS’ing this part, how do I clear that?
I want to know if it is possible to have one incoming customer schedule (DELSCH) through EDI that has multiple part numbers that get parsed out into their own incoming customer schedules. I see the XML Schema allows for multiple Article Lines with a Part No field and the Demand Lines also have a Part No field. When I tried to do this however, I get multiple customer schedules for each article line with the demand lines duplicated across all of the schedules.
Dear All, Does anyone kow if it possible to make the fields in Miscellaneous ready only when you create a new Application for payment fot out a sales contract? Can this be done in the persmission sets? My idea was disable some with APi.new but then i'm unable to create them or it has no effect. Anyone an idea?
We are on Apps 8 and use the Sub-Contract function. However, having created a revised template containing approvals, we cannot understand how the sub-contract can be activated when it has not previously been ‘Reviewed’ which is the step that precedes Activate. It’s as if the approvals have no impact on the activation of the sub-contract.Has anyone else come across this and if so, is this a bug or standard functionality?Thanks in advance for any assistance.
Trying to ‘automatically’ print PDFs to Send PDF to Connect printer for the Route to Connect action. I already have several rules set up for either email, printing to printers based on Printer Definition etc and want to have a Route to Connect rule that will automatically select the Send PDF to Connect printer without the user having to do it and without messing with any other printer options required for other printing options.
Is there anyone who have experience from product structure with connection to supplier and for what kind of processes and scenarios it’s used? We have scenario to solve where certain products we need to use component from defined supplier, same code is used for other products. Is it possible by connecting supplier to bom?
Hi everyone, we’d like to use the Supplier schedule agreements, Supplier schedules and Call-off for the procurement of some of our products but I can’t find any kind of “usuer’s manual” on this topic. Can anyone help ?
Since I am not so strong in SQL, I tried query builder to come up with a report with the below columns for Inventory parts Part NoPart Description Site = X only Created Date (on or after 1-1-2020) Has 5 or more transactions “ Primary supplier for the purchase part” with Supplier name and supplier ID (2 columns) However, for the number of transactions column I am facing a challenge since there is no view for me to chose in query builder. So I omitted that column, but still need the report sorted for parts with only for 5 or more transactions. How should I do? an advise with the right SQL statement would also help.
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.