This will include questions related to supply chain.
Recently active
Nous cherchons l’url qui permettrait d’afficher directement l’écran « Enregistrer Arrivées » (du module Approvisionnement) avec un filtre sur un numéro de commande
How can I see what delivery number a serial number shipped on? The serial numbers show on the Delivery note, but If I want to go the opposite direction, I can’t seem to see where the serial number records what delivery note it shipped on.
Hello - if I print off a handling unit label from a shipment in Apps9 there is a space for Supplier Code - however in my system the value is null and I can’t locate where in the UI that this field gets it data from, anyone able to help me please, thanks.
Hi Team:What could be the best way to obtain a query grouping (or counting) the parts in one location or warehouse?Why we dont have the same possibilities available than in GL Balance Analysis. ( see image ) ?
It is possible to change the values in the tabs of Export License (path: Part Master Data > Export Control > Export License > Export License) even though the Export License State is Approved. Change of values does not Triger a state change as well. Normally when the License is in the Approved state, it makes no sense if it can be altered.For example, it is possible to add a site in Site tab. This is what it is in 21R1 to the latest.Is there any desired functionality on this?Component: EXPCTR
Hello Experts,If goods have been returned against a customer order, for which we were already payed commissions, will IFS application create any commissions lines to deduct the already payed commissions based on the credit invoiced created ?, or do we need to manually deduct that commission amount?I did following steps in the test Instance. -Create a customer order with Qty =5 and add a commission line with commission %=10. -Process the order till Invoiced/Closed. -Ran the "Calculate Commission" job for the "Site", "Commission Receiver Group" and "Commission Receiver" combination. -It updated the record in "Commissions Per Receiver and periods" window with correct commission amount. -Then, retuned, 2 parts via RMA and created the Credit invoice. -Customer Order > Order line details > Order line details has not been updated upon "Update all Commissions"Cheers!
Hi folks,after 15 months of IFS live the ITH is up to 3.4 Mio records.That takes around 30 minutes to fetch all the data from ORACLE into MS SQL Server.I would like to load the data incremental.So the questions are:Is a ITH record fix the moment it is created or could it be changed?Is the TRANSACTION_ID “ongoing”, so we could be shure, the last (maximum)is the latest in a row? If so, I can easily fetch max(TRANSACTION_ID) from destination and use this as a filterfor the ORACLE fetch SQL command.Many thanksMichael
Hey there,How can we cancel the line in Sales Quotation or Business Opportunity with closed status?As a matter of fact, according to the attached file we have closed SQ or closed BO how can we cancel the two lines in In Progress status? All the best
Environment: IFS Cloud Hi I have a scenario whereby a Project is created on Company A. Theres a requirement for External Rental of equipment from Supplier 123. However Supplier 123 only has an account setup with Company B. Driving the demand and supply through the Project on Company A, is it possible to create a Rental to Supplier 123 from the Project? This is straight forward with Material, as we can create an Interco PO & CO from Company A to Company B and have a back to back PO created from the CO (Purch Order DIR) to the external vendor and Register a Direct Delivery. With Rentals, Im not sure whether this is possible? Has anybody faced this scenario in the past? Ideally, we do not want to create an admin burden with Interco transfers but im open to options here. ThanksJames
Hi everybody,my goal is to print a report twice if a material requisition is done.I’ve created the following report rule but it doesn’t work.Can anyone help?
Hello IFS Community, We are starting to use APB in our company and for it to work properly, I need to apply a material constraint. Since we are still new to this, we would like to apply this to only some Components PN. The question is: Is there a fast and convenient way to change the “Sched Capacity” for several PN at once, or at least in a list without having to open one by one in Inventory Part? Since we are still just testing it, I wouldn’t like to rely on our IT for it. Any tips?
In the Incoming Dispatch Advice page there are tabs regarding handling units, however there does not appear to be any options to create the handling units. Is this only possible when creating via connectivity? If so, how is that achieved?
When a shop order requests and reserves material to be moved as part of a transport task from stores to the point of use, how can these materials be made unavailable to other shop order?
Running into a strange error in which the Shipment Type is not being retrieved from the Site Default.Recreation Steps:Set-up default Shipment Type on Site (there is no Shipment Type defined for the Customer) Attempt to enter/save a Customer Order Line. The Shipment Type will not be fetched and the user must manually select it through the Required Fields assistant that pops up.This is in a 22R2 SUPD 5 environment.
Has anyone tried out a simple way of printing Site Address connected Phone Number in External Shipping documents like Shipment Proforma or Bill of Lading?Is there a possibility of fetching this value to the sender reference in shipment?
Hello Community;I am working with a client who is utilizing the Internal Purchase Direct Supply Code. In certain circumstances, they need to cancel the originating order in the demand site. The cancellation is being replicated from the originating order, to the PO, and the order on the supply site. However, on the supply site order, the cancellation is processing on the lines, but not the header. The lines all show as status of Cancelled, but header status is still Released. When you attempt to manually cancel the order header, the following message is provided. Here is the Supply Chain Customer Order Analysis Is there a way to cancel the demand site order header? Client is id 21.1.18 Thank you in advance.
Our EDI customer re-use the same PO references on different incoming orders (they aren’t able to change this). IFS can accept this, but when an order with the same PO reference is received, IFS rejects this order at the 'incoming customer order' screen (see below). The only way to work around it is to amend the PO ref, create the order, then change the PO ref back on the order that's created, but this is resource intensive. Does anyone know if there’s any configuration to allow duplicate Customer PO Numbers on incoming customer orders?
We have a scenario where when we create a customer order with currency is dollars. This customer order will be delivered.After two months when we received the invoice for this order, we can see that the currency of the invoice has changed from dollars to euros.Our question is, is it possible to change the currency in the customer order or invoice?And if it is not possible to change the available currency, how should this scenario be managed in the system?
We need to show the actual value of each unit within a given WBS and divvy up the excess inventory into specific WBS'. With this, we found a lot of purchase orders tied to shop orders through an operation, however, the cost of the PO is not increasing the value of the material. I could have sworn if you asked me, this was once functional. However, going back and looking at orders from a long time ago - it appears I would have lost the bet. Should the SO/PR/PO/SO tie have the complete value?
Hi Team, Is it possible to revert the status of Transport order from Arrived to Created status from frontend in IFS Apps 10? Thanks in advance.
Hi, Does anyone know if purchase order authorizaition rules are supported when transfering ownership from customer owned or supplier loaned to company owned?
Hi All, We have following situation for a machine building company: Their machines are build using different modules which are easily interchangeable. So we have for example a Serial Object with Serial ‘1’ which is composed of 5 modules A,B,C, D and E; Each module is also a Serial Object and ‘Contained’ within the structure of Serial Object 1. The Serial object 1 was purchased by a client X years ago, but his machine was outdated and he replaced it with a new one, our customer got the old one back as part of the new machine deal. Now they want to ‘upgrade’ that old machine. Upgrading means: they will disconnect all modules, and re-insert a combination of new and existing modules into the machine frame so it becomes a new model (= new part number, and new part serial). So Serial Object 1 is back on stock after the sale has been made. They will strip module A,B,C,D, E and put these on stock - together with the machine frame. Now they take the machine frame and insert modules, A,B, E,
Hi Guys,anyone of you have seen this error? We are trying to generate a work time calendar, which is in status “Changes pending”. Normally no problem, when we had this situation in Apps9. Calendar generated without any errors.Now in IFS Cloud (22R2 SU11), background job stops after one minute. These two line with error messages (ORA-20110: ChangePurchaseOrderLine.DATES_UPDATE: It is not allowed to update dates for Reopened order lines unless there is any qty to inspect.).One PO (Change Order) is a “No Part Line”. Makes it hard for me to understand, how to inspect this kind of PO Line?! Can I be sure, that this are the only to error lines? Thx for your help.
Hi,I am working with customer that received EDI order for configured parts and this working fine. The customer also sells groups of these parts as a package part item. The issue is that IFS incoming customer orders cannot support orders for configured package parts. You can receive the incoming order with configured components as individual order lines but that mean that in IFS they will not be treated as a package. I am wondering if anyone else has had this requirement for EDI order for configured package parts and how they worked around it ?
I have been using the Sales and Operations Model for nearly year and would like to know exactly how the Set Up Resource Consumption works. Currently we have copied it from the manufacturing routing which assumes that, for each product changeover, we need 0.5 hours to set up.My question is - how does the resource routing and S&OP know how many product changeover we need? Do I need to increase the consumption in the resource routing to account for this? and would that be to the average number of changeovers (say 30x0.5) per month? I am assuming the phase and out dates are important here also.
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.