Hello everyone,There is the option in the IFS to deliver items to bulk goods
The Shop Orders at our customers often have a long through put time while the raw materials are located in silos with a limited capacity.In IFSCloud the MRP proposals for the total component quantity of the shop order are placed on the start date of the order.Is there a technique in IFS to spread the supply/ receipts proportionally to the demand consumption over the lead time of the shop orders so that the silos are regularly refilled with a smaller chance of overflow?
We are building different part #s (so they are on different SOs) to the same build process so we want to be able to charge time and execute the operations of the individual SOs at the same time. How would an employee be able to charge time between 2-5 SOs, where it either evenly splits between the operations, or splits based on lot sizes?
Hello,How can I start the production of an operation block, using timeclock interface?
Hello all I am trying to implement a Kanban replenishment for a part from supermarket to line.when scheduling a new database task, I get an error that the production line does not exist for the replenish source. the problem is that I am not replenishing from a production line but a warehouse (supermarket). In the Kanban circuit, I have set the replenish type as location and everything seems to be correct.
Hi CommunityRegarding the change of transaction processing date, the issue arises where the price recorded in the journal entries for manufacturing withdrawals and finished goods receipts does not correspond to the valid standard cost at the time of recording.Although it was previously mentioned that this issue could be addressed as a standard service request, it was found that even if the recording date is corrected, the cost is not updated, rendering it unusable. Please refer to the attachment for detailed information.How was the issue of the system's inability to provide specified date costs (historical costs) resolved after "Modify Date Applied" was performed in Inventory Transactions History?Thanks & Best RegardsKomine
Community, Does anyone know when the RMB menu option ‘Update Earliest Unlimited Supply Date’ is enabled? below screenshot, supplier 100201 is the primary supplier for this part. Thank you.
Our company does creates manual shop orders for the pre-assembly of equipment based on forecasted need. Business opportunities and sales quotes are used to anticipate future need. My question is, is there a way to peg a shop order to a business opportunity or sales quote for pre-assembly purposes, since there is no customer order created yet.
Is there anywhere or any screen, I am able to get these information for all the manufacturing parts? Client would like to see how far away of the system calculated Manufacturing lead time compare with the average actual manufacturing time for all the manufactured parts in their system. Thank you in advance. Ada.
Could you please give me some examples of Shop Order Priority Categories values?
Hi, what date uses the system from the warehouse when a material is reserveing (automatically) in production order ( like below) ? System to reservation uses the FIFO method - right ?
Hi Community,We are seeking your insight to address the following questions raised by one of our IFS customers regarding the "Modify Date Applied" feature available within the 'Inventory Transactions History Screen'.Could you please explain the design concept behind "Modify Date Applied" feature? Since the purpose of ‘Modify Date Applied’ is to move transactions from one financial period to another without changing the values in the postings, what is the significance behind changing the financial period?Following is the customer’s business requirement:Customer has a different effective cost in March compared to that of April. For a specific transaction registered in the system in April, customer expects to view the cost values in the postings in ‘Inventory Transactions History Screen’ in corresponding to March accounting period. Does IFS have this functionality?Thank you,Manthila Perera
Good Afternoon, We are a medical manufacturer using Apps 10 EE, We are looking for an effective way to trace product information based on their packaging hierarchy, for a customer order.For example, we are wanting to be able to pack in the format below: ----Pallet 1: ---Box 1:--60x Product A – LOT 010203 – Manufactured Date 08/04/2024 – Expiry Date 08/04/2025--85x Product A – LOT 014203 – Manufactured Date 11/04/2024 – Expiry Date 11/04/2025--74x Product B – LOT 014203 – Manufactured Date 11/04/2024 – Expiry Date 11/04/2025---Box 2--21x Product A – LOT 010203 – Manufactured Date 08/04/2024 – Expiry Date 08/04/2025--74x Product C – LOT 014783 – Manufactured Date 01/03/2024 – Expiry Date 01/03/2025--11x Product B – LOT 018503 – Manufactured Date 11/02/2024 – Expiry Date 11/02/2025 ----Pallet 2: ---Box 1--54x Product D – LOT 010203 – Manufactured Date 08/04/2024 – Expiry Date 08/04/2025--41x Product A – LOT 014203 – Manufactured Date 11/04/2024 – Expiry Date 11/04/2025--10x Product
Hi Community,Could someone advise what generates ‘Positive/ Negative Difference of Calculation’ record in Inventory Transaction History window? Thank you,Nimesha
as attachment, does any body know why shop order cost estimated material less than shop order material? in shop order material tab, there are 9 materials. but in shop order cost,estimate detail only have 5 materials. where can setup to make all of the material in estimate detail?
Community, Does any know aware that in IFS any shop order cost variance report that could be downloaded to Excel ? the screenshot below, the value ‘Calc Variance’ is the data we interested for each shop order.
How could I setup IFS Cloud in such a way that in a routing with 5 operations the sequence is:
Hi!We have problem to get a proper sorting (order by) on the X-axis in Lobby element Bar Chart.In our case we transform a date value to the string for start of the week, using to_char(TRUNC(&AO.Shipment_API.Get_Actual_Ship_Date(shipment_id),'D'),'MM/DD/YYYY') , for example 05/28/2023, 05/15/2023 etc.We are using above string format to get the order for the data. I have also tried using year + week number and truncated date. When I get to the lobby element I check the data source to use the data source order, but it keeps ordering by the y-axis amount. I am doing a horizontal bar chart and get least to most from the Y-axis. Bar ChartSo then my dates are in the X-axis are in the wrong order….??I saw there was a question exactly like this one from 3 years ago, but it did not have a solution. It was closed so couldn’t reply there. It looks like others are having this same problem. Is there anyone who knows a solution for this, or is this some kind of limitation in the Bar Chart?
Hi All, Is there a method to exclude unused Workcenter Resources from the Gantt chart in production planning? Despite work centers being hidden or deactivated, their names continue to appear on the chart. These centers no longer have capacity and there's no necessity for their visibility in this context. Many Thanks,Alex
The trip tracker App is not working for a normal user, it is only working with the Owner or an HR ADM. Anyone have an idea what it could be? I'm using IFS V10
Is it possible to kill a serial number in IFS? (Remove it from IFS completely) Only the top level manufactured part number is serialized in our system. (Lot/Batch tracking is not on, and no components used in the product structure are serialized) The serial number was built through a shop order. We have capabilities to scrap the unit or rename the unit, but we’d like to remove it from IFS completely.
Hello, I started working as a module consultant in the IFS Digital transformation project. Can you help with screenshots and documentation of the planning and production modules on IFSCloud?
Inventory parts With out Input UoM Group Shop order no: 204708Shop floor work bench Select issue material Manually When proceed to finish Error message pop up : Input unit of measure cannot be used when the issued quantity is split into serialsFor more information refer the attached document. Is there any option I need to select. To avoid this Error: Input unit of measure cannot be used when the issued quantity is split into serials.
Receive error message when trying to copy/paste from one Estimate item to another Estimate item.Error “The Estimate Node does not exist. “ But possible to save add new line with same product.Why this error come when copy/paste from one Estimate item to another Estimate item.
Hi , I’m getting following error when a large file with multiple data sets is imported , only one data set/line can be imported without an error message.STUCK thread while executing native sender: 'null' Caused by: ifs.fnd.connect.senders.ConnectSender$TemporaryFailureException: STUCK thread while executing native sender: 'null' Any suggestion to solve this? BR, Chathuri