Hey all,
We have 2 locations that are physically nearby each other (20 minute drive or so). Both locations will process shop orders, but, ultimately, the finished assemblies will be assembled into a final system at location A. We are considering making the 2 locations separate sites for financial and inventory segregation, but I am concerned about the shop order processing complexity that this will introduce.
Ideally, we’d be able to enter a shop order on Site A which has 2 components: Sub Assembly created at Site A and Sub Assembly created at Site B. Then we’d select which site we source each assembly from and that would create a linked shop order for that site.
I know it doesn’t work exactly like that, and there will probably be distribution orders or DOP orders involved, but hopefully that simplistic “ideal” makes sense. Is that ideal realistic in IFS? How do others handle multi-site manufacturing that is assembled and shipped to the customer from a single site?