Q&A Discussion of IFS Solutions for our IFS Employees, Partners and Customers
Recently active
insert page break after the notes field. how ? i dont see page break in conditions field
Hello, We want to set up authorization for the Business Opportunity. We want employees to have to get permission from a supervisor to create a Sales Contract from the Opportunity. This could be done, for example, by ensuring that the status of the Opportunity can only be changed after authorization from the supervisor. I have been working with ‘Sales Process’ and the Approval feature it contains. But I can't find what I'm looking for there.Can anyone advise me on this and suggest a solution? We are working in App10 Update 7.
Hi all,We are using IFS Cloud mainly for Maintenance, and I’m curious about how others are handling Asset Criticality and Work Task Priority. Do you keep them completely separate, or have you built any kind of automation where they are connected? Are there any best practices on how to align these two values? Or do you mainly use asset criticality as more of a “flag” rather than something that drives task/work order priority? I’d really appreciate hearing how different companies are using this in practice. Any lessons learned or tips would be great!
Hi Experts,I get this fail transaction if I create an additional work from a request task using option ‘Request additional work that needs to be done’. I use copy task detail option as well.It is not clear how to refresh map positions in back end. I refreshed the relevant tasks but still cannot get rid of the fail transaction. Has anyone come up with this issue? how to get rid of this without erasing the already synced transactions in backend. ORA-20114: MapPosition.FND_MODIFIED: The Map Position record has already been changed. Please refresh the record and reenter your changes.ORA-06512: at "IFSAPP.ERROR_SYS", line 140ORA-06512: at "IFSAPP.ERROR_SYS", line 509ORA-06512: at "IFSAPP.MAP_POSITION_API", line 911ORA-06512: at "IFSAPP.MAP_POSITION_API", line 961ORA-06512: at "IFSAPP.MAP_POSITION_API", line 809ORA-06512: at "IFSAPP.SERVICE_ENG_APP_SVC", line 76923ORA-06512: at "IFSAPP.SERVICE_ENG_APP_SVC", line 76923ORA-06512: at "IFSAPP.SERVICE_ENG_APP_SVC", line 76931ORA-06512: at "IFSAPP
I defined an operational subcontract for production and linked the work order to the project. When I send the intermediate inventory to the subcontractor, a purchase requisition is created. The relevant requisition line appears to be linked to the project, but it is not linked to the project in preprocessing. The project value is mandatory for the relevant account in the company's accounting settings. Therefore, I receive an error when entering the order on the manual supplier invoice screen. Why doesn't the link appear in preprocessing for purchasing even though I linked the project to the work order? I request your assistance.
Hello Community,We have a scenario where a Shop Order with a lot size of 100 pcs is scheduled using APB.For Operation 10, all 100 pcs are planned to be completed in 21 hours.Considering an 8-hour workday, the operation 10 would take roughly 3 days to complete.My question is: Where in IFS Cloud can we see the per-day planned quantity for such operations?I am looking for a way to monitor the breakdown (e.g., daily planned output) instead of only seeing the total planned hours or duration for the operation.Any guidance, best practices, or navigation tips would be highly appreciated. @Björn Hultgren @matt.watters would appreciate your input.
Hello,We are unstalling the MT and I’m looking for a detailed description of the pod and where they are needed for , because some pods are crashing etc and we would like to optimize memory usage. Best regards
According to documentation DateTime format is returned depending on http X-Ifs-Time-Zone-Aware-Request parameter value.When we are performing request /main/ifsapplications/projection/v1/MeasurementsForObjectHandling.svc without the parameter we are getting response "RegDate": "2025-08-18T20:03:59Z",when adding X-Ifs-Time-Zone-Aware-Request = "true"response is "RegDate": "2025-08-18T16:03:59Z", as I understand, according to the documentation it should return "RegDate": "2025-08-18T16:03:59+04:00" since database timezone is configured to GMT+4
Hello IFS Community, Can someone please explain to me how the Absence Limit Details work? I would like to be able to accrue vacation absences every 2 weeks. I thought the settings below would do that, but it is not working. When I generate the limits, I get the full year no matter the hire date and accrual time of the employee. This is the Employee File Here is the Absence Limit Year that I used to generate the balances This is the result How do you get IFS to accrue a partial year? Specifically, 2 weeks at a time? Thanks,
Scenario 1. One manufacture part with multilevel structure and routing. When I calculate All level part cost calculation and All part cost calculation . Part cost calculation will be the same or different. Scenario 2 If we have the same part with only one default structure and routing. When I calculate All level part cost calculation and All part cost calculation. Part cost calculation will be the same or different. Can please clear this two Scenario
Issue Description : Activity Details Disappear After opening the Project Scope and schedule Steps to recreate the issue 1. Navigate to Project Management >Plan and Execute> Activity - Activity Details - Dropdown option is available for Setup Parameters, Material and Services, Resource Planning and Monitoring 2. Navigate to Project Management > Plan and Execute > Project Definition - From project details go to Scope and schedule 3 Activity Scope and Schedule > select Activity 4. Now Navigate to Project Management >Plan and Execute> Activity - Activity Details is not available.
Hi Everyone,I came across several posts related to DB connection issues in Developer Studio. I’m also facing a similar error – “too long” – when trying to log in with the same credentials provided for the dev environment. All the details seem correct, but after clicking on Test Connection, I get the “too long” error within a few seconds.We are on the IFS 25R1 environment. Could you kindly advise on this?Many thanks,
Hi!The requirement is to display the absence hours in the ‘Activity Load Details’ in the “Resource Analysis” page (See screenshot 1) when an employee records absence using ‘Attendance Hours’ in the “Time Registration” window (See screenshot 2). When using the “Time registration” window to record absence, it picks ‘Wage Type’ and ‘Wage Code’ not the absence type. However, would like to know how this connection is built and what are the basic data that we must review to ensure the connection. This is from 24R2 version. Please assist. Thank you!Screenshot 1 Screenshot 2
Hi,Customer needs to analyses material, labour and OH cost in project connected shop order separately in the project monitoring. So, I followed below steps in 25R1 environment. Create the posting cost group as Labour, Material and OH and connected to respective cost bucketConnect 3 WIP GL accounts for M40 posting using control type posting cost groupThen create the shop order connecting to project and release the shop order. Then it appears cost breakup correctly in Project monitoring pageScreen Preview 1 - Shop Order is in Planned Status Screen Preview 2 - Shop Order is in Released Status However, once I close the shop order all cost shown under one cost elementScreen Preview 3 - Shop Order is in Closed Status Is there any additional setup that we need to do or is this the normal system behaviour?Appreciate if anyone can give insight on this Best RegardsNarmada
Hello!I have made a custom field/custom attribute which is editable and required on page purchase requisition (Entity: PurchaseRequisition). I want the same field on the purchase order page (Entity: PurchaseOrder), but as an uneditable reference to the connected purchase requisition.Both entities are able to host custom fields, and I understand that I must make some sort of read-only custom field on purchase order page as well, but I am lost with regards to what reference option/statement I should use.Can anyone help?
Please provide an updated list of tables to export from a target DB, before you clone and overwrite the target DB. The lists of tables i see here in community are about 3 years old.Is there a new list with updated tables?
Good morning, Has anyone managed to do an integration of WeChat into CE? Thank you,Violeta
Hi team, We are working on using Boomi to integrate IFS and Procore. We are facing a few issues with the IFS Apps10 connector and unsure if this is lack of our understanding or something the connector does not support. Appreciate any insights in our challengesFor get operations we are unable to send query parameters which we can when using Postman, this has forced us to create custom projections when we could use a standard with query parameters. For post operations we run into the XSRF issue and have to perform a get call first to get the XSRF token. Is the approach always to perform the get and then use the post connector or can the post connector handle the XSRF call internally.Appreciate your insights. Thanks,Nitin
We’re integrating IFS Apps 10 to Salesforce via Boomi. We’re finding that the standard APIs as defined in IFS do not contain all of the data elements needed to create or update records in Salesforce and we may be creating custom APIs to achieve our objectives. Are there other customers who have connected Salesforce to IFS via Boomi? It would be helpful to know whether you were able to use standard or had to create custom APIs and other helpful lessons learned as we progress in our journey.
Hello, Reaching out for your expert advice.I have a shop order connected to a Project. The transactions are generated as in the table. At the cost bucket, the Inventory value gets distributed in Labour, Overhead and Direct Materials, but at Project Monitoring the cost split between cost elements - Labour, Overhead and Material is also to be displayed.How should the cost elements be mapped to display those elements in Project Monitoring? Thank you.
Hello IFS Community,--IFS version: v10As part of one of our lobbies, we’re trying to enable users to navigate to the applicable screen/form based on the record from the lobby and its invoice type. In other words and as displayed in the image, trying to navigate to the invoice in Preliminary status based on its invoice type (eg. If Instant Invoice, go to such form and if Cust Order, go to Customer Invoice).Note that in order to join invoices in Preliminary status, we created a custom data source.Thanks in advance.
Dears,Iam trying to add customized Scheduling exception on the PSO(6.13), by using id >999, but I cannot see any Exception type data from the drop list. How we can associate these rules to real exceptions?Where and how should i configure to trigger this exception.? Thanks//
HiWe are using IFS Cloud for Service Management connected to IFS PSO 6.15. I am currently trying to run a simulation of a day of service using the OSV functionality. I have successfully created the activity data to replicate the time slots for appointments used for work in the simulation. The problem arises that the shift defaults to a 9am start and the start of the simulation is from 08:50, but the first appointment starts at 8am.My question is if this time can be adjusted to cover the time period I’m looking to replicate in this scenario?My only alternative I can think of is to move all appointment slots back 1hr (so the earliest starts at 9am) and then extend the shift back 1hr using an overtime at the same cost as the regular shift.Thanks
We have a customer that have customizations in IFS10 Aurena UPD10 and will get error Cannot read properties of null (reading 'metadata') in Aurena.Have someone else had the same problem and have a solution? First I enter a person that already exists and I get an error message in customized detail page Individual. I press “Cancel New” and then I search in the overview page, mark the row and click on command Individual to get back to the detail page Individual. Then I get a client error in the detail page Individual. Error stack:Cannot read properties of null (reading 'metadata')TypeError: Cannot read properties of null (reading 'metadata')
Hello, I am looking for a way to restrict users’ access to some of the controls in the IFS table view. I have not seeing anything in Permission Sets. I would like to prevent them from going into settings and column chooser. I would also like to set a default view for the table and the number of records it returns. I have not found anything in the help or on the community that outlines how this control works. In IEE I was able to user Permission Sets to prevent users from making changes to the appearance of screen. Any guidance for IFS Cloud would be greatly appreciated.
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.