Q&A Discussion of IFS Solutions for our IFS Employees, Partners and Customers
Recently active
Hello everyone, I am trying to explore the supplier statistics feature but I dont get any data, even if I populate the data “F2” i get no result, any feedback?IFS10APP
I am seeking a solution to manage shop orders in a production workflow where parts are built, tuned, and tested. The process should allow for a dynamic flow such that:Operation 10: Approved → Progress to Operation 20 Operation 20: Approved → Progress to Operation 30 Operation 30: Approved → Progress to Operation 40 Operation 40: If a failure is detected during testing, the part should be reset and moved back to Operation 20 for reprocessing.
Error DescriptionWhile creating PO receipt transaction in the Purchasing site, IFS is showing error ‘Value is missing or has an invalid time interval for posting type M92 control type C31 code part A in the company’ in Purchase Transaction history in Purchasing site.Business ScenarioTwo companies defined, AUOWN1 which is the demand company and SGDOPR1 is the purchasing company. Inventory procurement is initiated in the demand site AUV1 (under company AUOWN1) and Purchasing site is SGDV1 (under company SGDOPR1). I have set “Allow Posting Creation Based on Demand Site Receipt” as TRUE.Site Setup for AUV1 (Demand Site) has linkage to Purchasing Site SGDV1.Posting type M92 is defined in Purchasing Company (SGDOPR1) with control type C31 - Purchase Group.As a precaution i have kept the mapping same in AUOWN1 (Demand company) as well.An Inventory Part PR is created in site AUV1, which creates a Dual Procurement PO in the purchasing site SGDV1.Upon PO receipt on site AUV1, two receipts are cr
Hello All, We are currently using IFS MWO Service 10 (UPD9) and we are experiencing increased Initialization time and slowness in MWO App. When we referred to the Lobby Page for Mobile App Status we noticed ‘Queued Out Messages’ has reached almost 700,000 and would you kindly share your thoughts and advice if there is any connection related to the above Message Queue and any recommendation on reducing the increased initialization time? Many thanks.
Hi Experts,In 24.2.0, I get notifications(toast) upon sending a new request task to the mobile (Test both Windows and android versions), but with same settings and devices in 24.2.1 the notifications not received. I sent a test notification and the logs don’t give any errors either.Would their be any known framework bugs ? or have I missed anything ? (application parameters relate to this notification hub and url also identical in these two env. In installed app details Push is also enabled. The environments are ifs demo environments. Note that push sync working ok)Can someone clarify please?Thank you,Roshan
Hi all, I'm working on implementing Linear Assets in IFS App10. Even after Map Element Position, accessing the Viewer tab is returning the message below:Ifs.Fnd.FndSystemException: Explorer: An Unhandled Exception has occurred ---> System.ArgumentNullException: Value cannot be null.Parameter name: path1 at System.IO.Path.Combine(String path1, String path2) at Ifs.Application.Linast.frmLinastVisualizer.InitializeMap() at Ifs.Application.Linast.frmLinastVisualizer.PopulateMapPositions() at Ifs.Application.Linast.frmLinastLinearAsset.vrtTabActivateFinish(SalWindowHandle hWnd, SalNumber nTab) at Ifs.Fnd.ApplicationForms.cTabManager.vrtTabActivateFinish(SalWindowHandle hWnd, SalNumber nTab) at Ifs.Fnd.ApplicationForms.cTabManager.__TabActivateFinish(SalWindowHandle hWnd, SalNumber nTab) at PPJ.Runtime.Windows.QO.SalQuickTabs.CallTabActivateFinish(Int32 tab) at PPJ.Runtime.Windows.QO.SalQuickTabs.SendTabmTabActivateFinish(Int32 tab) at PPJ.Runtime.Windows.QO.SalQuickTabs
Hi,We are currently migrating from IFSv8 (on site) to 24R1 in an onsite Remote (Amazon).All documents are stored in the Oracle Database. The annual growth is huge and want to be able to store in modern storage like S3.Has anyone have expérience with migration / clean up of old Documents ?Best regards
Hello,Surely, I must be missing something. I have a document(s) attached to Project Definition but I cannot view the document from the attachments pane. The eyeball isn’t there. I don’t have a problem using view document from the document revision itself. Any ideas what would cause this? Patrick
Hello Experts,While creating a new work through MWO app, there is no records are available in Service contract lines. Can anyone guide me on how to sync records from the back office to MWO app? I appreciate any insights you can provide.
Dear Colleagues,I encountered an issue with Sales Contract reporting Planned Revenue. There are 4 contracts and only one does not report Planned Revenue. The settings are the same - posting rules, Revenue Codes, definiton of items, etc. TEST is the last one which I created from the scratch with the same settings as W-0002. The prerequistions for reporting Planned Revenue seem to be fullfilled: Any ideas for further checking are very welcome :)Thanks in advance.
We are looking to start using HSBC for bankingHow can we update/amend our payment files to the HSBC Standard BACs 18 template?
Hello, everyone, I am working for a customer who has a PSO/IFS Cloud integration.I would like to define the average travel speed for the Central London area. The purpose is that the same technicians can operate all over London, but there are some areas ( like central London area) where such technicians must travel slower than other areas. Can anyone help me?Thanks
Hi, We are struggling with our setting of a DOP within a project. For some parts, which are set to “pegged”, want that IFS looks at the standard stock first. If we have it, we don’t need to make or buy it.But we notice that our DOP only looks at the project stock, which is off course empty. So he makes PR’s/SO’s for everything, without looking at the standard stock. How can we solve this?
We are trying to enter a Supplier for Purchase Part Record - supplier is set up as US$ and when we enter the part the Price Info comes up as US$ however as soon as we hit save it switches to CDN$ and it won’t let us change it. We need this to be US as the supplier and the purchase is to be in US
We are currently using a process where we use Warehouse Data Collection to issue a serialized part to a shop order. The part in question can be used up to 4 times with 4 different serial numbers. In our application, once we issue the 4 serial numbers, the part is built and those serial numbers are permanently covered and will not be able to be seen again without completely destroying the part.The question I have is if anyone has an idea of how we can sequence the issue of these parts to know which order they were scanned in? The reason is that I want to know the orientation of the serialized parts in the final assembly (Ex: Left to right is serial 2, 4, 7, 5). I would ideally want some sort of way for my operator to identify that this scan is the left most position, this scan is the second from left, and so on.Let me know if you need any clarification or is you have any ideas. Anything would help!
How to Track Work In Process in a ProjectI am working with a ship builder that has the requirement to track work in process as it moves from one work area to another. Think of large modules of a ship that may move to various areas. The manufactured components are then assembled together into a piece of work an process. It is not yet a finished item, but the customer wants to be able to locate that item somewhere in the facility, Oh let's complicate this a be=it more. The module that has been assembled may not have a part number.A long time ago, in a galaxy far away I worked on the project for the US Army at an arsenal that manufactured Howitzer cannons. They also wanted the ability to track the cannon tube (barrel) from the foundry, through all its manufacturing steps an assembly steps.We were un the midst of degning a process to do this but then the US Army put the project on hold.What creative solution have you seen or devised to more accurately tracking of work in process at the LOC
We need to import payments from a payment broker through the External File interface. But the file amounts are created with the thousand separator dot (.). We have tried to remove the dot using formulas in the External File Template Details section but with no result. On all rows with high amounts the status turns to “Unpack error” and the error message is “ character to number conversion error”.We would very much prefer to load these files without having to manipulate them before they are imported.Please advice!
Hi,After generated new Manifest for IFS Cloud 24R2SU1 i have this message on Excel Migration Jobs, Created in a earlier release of IFS Cloud in Excel when I select the Migration Job and select Load:“Please load a migration job to sheet appear in IFS 24R2SU1”It have the selected migration job, ref. logs”12:23 - Getting Migration Jobs”, but it does not open it in new Excel Sheet.How can I avoid this and use existing Excel Migrations Jobs?/Geir
@Alexander Heinze probably you’ll be able to answer this one.Is there any way to handle subcontracting usecase in NGSM using Requests? In ESM/EAM you can have subcontractors added to the work orders → generate Purchase Orders → contractors could execute the Work Task using B2B portal.In NGSM 24R2 I couldn’t find anything similar. If this feature is not available yet, do you have any idea if it’s on the roadmap?
When duplicating a customer order line, why does the price not also get copied over? The quantity does but not the price. Our units are second hand so the price varies so we do not have fixed pricing on our sales part. What is currently happening is the price of £0.00 on our sales part is what is populating the Price on the duplicated line rather than the price from the line it was copied on. is there a way to change this, selecting price freeze doesn't seem to stop this.
Hi, I can’t find any documentation related to IFS App 10/IFS Cloud or IFS in general on what are the standard VAT codes and VAT codes setup.I’m new to IFS, used to be using SAP ERP where it was much clearer to me. Do you have any ideas? Thanks!
Can you peg/un-peg parts through the purchase order line? I know you can manually peg through the customer order line or shop order, to an incoming PO but as a procurement team we would like the ability to manually peg a purchase order line to a customer/shop order via the PO.
I noticed an issue regarding the Time Registration and Employee Result Screen. Wage Code:Created OT time in time registration screen This was automatically transferred to the employee result screen I deleted the OT time in Employee Result Screen The OT time was automatically removed from the time registration screenWork Order/Task:I created a Work/Task time in time registration screen This was automatically transferred to the Employee Result Screen, under wage code 'REG' I deleted the REG time in the Employee Result Screen But when I checked in the Time Registration screen my Work/Task entry was still visible.Any reason why this is?
We are in the progress of planning the update from IFS Cloud 24R1 to 24R2. At the same time we would like to apply SU3. I have searched far and wide for guidelines but came up short. Our rough plan now is to first apply the RU and then apply the SU before creating the delivering to Use Place.Is there any best practices or guidelines available? Does anyone like to share their experiences?
We have previously taken a Out-of-band (OOB) fix for a critical bug that has been resolved in a SU. We have taken the SU when it was release. Before taking the SU, we obsoleted the files in our solution repository.Is it possible for us to completely remove the customisation files now after we have taken the SU and we are back on “core level” for these entities? This will obviously also apply for any other customisation, not only for OOBs.
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.