This will include the questions related to Procurement, Demand Planner, ASC, and SRM.
Recently active
hi, community, while receiving the goods I need to perform the inspection for the goods, however after choosing the receive case as receive into arrival ,inspection at arrival , location to receive, and no of qty to inspect there is an error “ goods cannot be moved to the specified location before being fully inspected” Steps performed: I have checked the same in ref no in inspection management it is not reflected there. Looking for your assistance,thanks
User cancelled line on Customer Order first - now when we try to cancel line on PO we get the error that manual peggings exist for this line - unpeg before cancelling except we can’t unpeg because line is already cancelled on CO.Help!!! How do I find the record to unpeg
Hi all, I have a question (well actually 1000 questions) in regards to MRP. We are trying to move the planning process into MRP, I am fairly new to the company and to IFS. We want the forecast to be generated in the DP client, and then transferred to MS1 and MRP, and then for MRP to plan purchase requirements. However, we are raising shop orders for our finished goods, as well as assembled parts. As far as I can tell MRP would plan for both, Forecast from the DP client and shop orders, which would a duplication. How can I set MRP to look at Forecast only, not at shop orders? Thank you, Jess
I am looking for direction on how to set the system up to allocate costing accurately when we have to order in batch qtys. For instance, our supplier sells the part in boxes of 100. We have to order from the supplier in eaches, so we order 1 box from the supplier. When we receive it into inventory, it is received in as one box. How do we reconcile this when we begin utilizing this material in work orders, shop orders etc? We want to be sure that the costing works appropriately and that we are only allocating cost for the portion of the material that we use. Is there a way to purchase in box qtys, but receive in single qtys for costing purposes without messing anything up?
IFSAPP9Please let me know when purchase order line is automatically closed when receiving is done and receiving qty = invoice_qty
Hi,I’m looking to send items away for refurbishment to then bring back into inventory but I’m unsure how to set this up correctly. The process I have to follow is missing something with this step and I’m unsure how to correct it. How do I do this step below as it doesn’t seem to give me this option or I don’t have the correct access to do so? The above step completes this transaction below which I’ve been unable to replicate
I am trying to generate spend analysis data in my environment, but I keep getting an error saying that I don’t have the required access to the companies. On the Spend Analysis settings I have only set up 1 company to which I do have access. The category assortment on the spend analysis settings also only has the same company, and there are no transactions for parts on belonging to this assortment.Are there any other reasons why I would be getting this error, and how do I resolve this?This is on IFS Cloud 22R1.
Hello,I want to trace Create Forecase option in the Demand Plan Server for belong problem. So can u share which api using for that process?Best Regards.
We have a supplier who requires 50% payment in advance and 50% at acceptance.I have created a Milestone/Stage Payment Template, but I can’t see it on the Purchase order Line. The Validity is Active. Is there something else I need to do to make the template available to attach to the PO?Thanks in advance.
Hi We have just activated our supplier invoice workflow module and have come across couple of issues and find some of the rules aren't working the way we would like them to.For all cost/overhead invoice we have PO authorization rule and have chosen to use Inherit Purchase rule, but the issue I have we have MRP related orders for all stock items these sit in diff stat group and we have excluded these from Purchase Order authorisation rule.But now the issue we have is when Supplier invoice do not match PO this these are invoices are going catch all rule, is there anyway when Invoices do not match they automatically go to the person who raised the original PO, for pricing issue.Is there way we can fix this as its causing lot admin time assigning authoriser for these invoices. Please help :) ThanksSwati
Team, please assist & point us in the right direction to resolve the following. We are on Apps9When Registering PO Arrivals on PO 8737, the user received an error stating: Connecting a Purchase Order to a project is only allowed when the Purchase Order is in Planned Status.The Order of Operations for our order is:Customer Order created with a connected Project Customer Order Released - which created Purchase Order with linked project in Planned status Purchase Order Released - sent to Supplier. Supplier sent parts to our warehouse Team trying to receive in the parts, and is receiving the following error: Confirmed there were no changes on the line items for the customer order, purchase order or the project activities. Please help determine why we are receiving this message on this Purchase Order.Thanks
Hello, I have not found much detail on this functionality, but I am hoping there is a way to accomplish this. In many instances, we may have a single PO with multiple receipts against it. In the event we need to perform a return of defective material to the Supplier, it appears only 1 MRB case can be created against 1 receipt. If the total returned qty is spread across multiple Receipts, can they be combined into one Receipt that the MRB case can be opened against? Receipt 1 - 50 pcsReceipt 2 - 25 pcsTotal qty needed to be returned to Supplier - 75. Ideally, 1 MRB case is opened for the total qty, and is attached to both Receipts. The only work around I have found is to move the material to an MRB Inventory Location and open an MRB case against that amount. This unfortunately disconnects the process and you are logically managing the inspection/disposition of the materials. Any guidance would be greatly appreciated.
I have created ‘ comment’ as a custom field in Purchase requisition screen , I need to create a custom event to copy the comments on the Purchase order header from Purchase requisition header when converting PR to PO . similarly to display the comments on Request for purchase order screen from purchase requisition header screen when converting from PR to RPQ . Can someone please help me with it . I tried creating events but no idea how to copy those comments on conversion .
I am looking to see if there is a field that will allow us to determine how low the safety stock can get before MRP will issue a req to replenish. For example, if we set the safety stock at 100, do we not want a req to generate for 1 pc every time we dip down to 99. Instead, let’s say that we only want safety stock to replenish when it falls below 50 pcs. Is there a field where we can tell IFS to wait until we are at 50% of safety stock before replenishing? We want to move away from lot size and reorder points on planning method “C” and move to safety stock on planning method “G” but are looking to solve this issue first. I see that there is a field for “Service Rate” - would this perform the function I am seeking? If not, is there a field that will serve that purpose? Thanks - Sarah
Hello Has anyone an answer to the below problem ? We need to undo a delivery as a customer has added a new line. There are no invoices created at this stage. Ian
Please help me to answer our Customer: IFSAPP8 version……Is there a reverse function in the IFS for the project header: RMB->netting->Net Project MaterialBy chance, the function used generated material reservations for all materials pinned to the project warehouse. Is there a reverse function that will "unreserve" all reserved items?………...
I’m trying to pinpoint why demand for a specific part in our system is fluctuating from day to day with no input changes other than the occasional order entry. We have a customer that takes 1,000 units (per forecast). As I’m still only 2 months into using IFS I’m trying to make sure I understand this properly in regards to flow:-Customer sends forecast-Planner enters forecast into system for finished unit-Forecast drives supply side to enter purchase orders which then show as system supply-Customer sends an actual order to fulfill-Planner enters the order in the system which should then reduce the forecast (ie. order is for 200 units so June demand should drop to 800 with the hard order for 200)-Nowhere should the demand fluctuate for a given part just so no orders are made in excess of the actual forecastNow I may be misunderstanding this but since I started here I’ve been monitoring IFS reports daily to try and pinpoint where there are opportunities to understand the system better.
Hello I created a custom field in Suppliers screen, and i want to make it Unique, is it possible ? Thank you
Can anybody explain such situation:In 7.5 version of IFSAPP when user wanted to cancel PO lines wchich was authorized there was POP window appeared with communicate: Cancellation is not permitted when PO is authorizedBut in 10 version cancellation authorized lines is availabed.
kindly what is the best way to defeine parts in a site or copy from site to site for a secific commodity Group2 without using assortment. I need another way for it if someone can help us as we are using IFS10 Thank you and best Regards,Bilal Drayi
Has anyone ever seen where you can reserve a part number without selecting the lot# to reserve?We have large parts and they are not necessarily put away by FIFO and would like to be able to auto reserve (RMB from shop order header) the part without reserving a specific lot#.We are running IFSAPP10.Any insite would be appreciated.
Hello, I have released as supplier schedule and am trying to generate a new schedule. When I run MRP again, a new schedule does not generate even when new demand requirements have been entered in the system. Do I have to transfer the schedule first before MRP can generate a new supplier schedule? I have selected the manual transfer option in the supplier schedule agreement part, but when I try to transfer the schedule I get an error message stating: the the message transfer is not enabled for supplier. What setting do I have to enable to transfer the schedule? Thanks,
Hi All, I am testing the New Part Assistant to be used by our Procurement team to create new parts. When we Selected the Purchased Inventory Part in the New Part Assistant, it creates everything correctly, except that the inventory part is Purchased. We woukld like the inventory part to be Purchased(Raw). Is there some configuration that we can do to maake it create the inventory part as Purchased(raw).
Hello All, I need help to know how can I get customer specific total sales and total projected estimated sales under Forecast and Demand planning module? Thanks,
Hey all,We are having the issue described here:https://community.ifs.com/buying-procurement-demand-planner-asc-srm-41/apps9-payment-advice-failing-on-occasion-when-emailing-to-supplier-13312but that forum appears to be a bit lower on volume -- no response. While it deals with APPS9, we are seeing the issue in APPS10.The bottom line is that automated emailing of Payment Advice stopped working, out of the blue. It had been working since the start of the year for progressively more Suppliers each month as we entered email addresses and configured Suppliers to receive the payment advice emails.We are not using a Custom Event. We have been using native IFS functionality that runs through IFS Connect’s emailer.. One of our devs has figured out how to make things work with a Custom Event/Action, but we'd rather not have to add a configuration when native IFS functionality should do the job (and has been working for several months).Does anyone have advice on how to overcome the "Mail Address '