Q&A Discussion of IFS Solutions for our IFS Employees, Partners and Customers
Recently active
Hi everyone, has anyone experienced this error message on a mobile device while using the MWO app? Thanks a lot Radovan
HelloWhen Purchase Type of Payment is "Normal" , supplier account department is able to use a tolerance of xx€ if they face a gap between the supplier invoice amount and the Recipts amount. When Purchase Type of Payment is "Stage", the tolerance is 0 € which imposes us to make a lot of modification (this is an internal extracost for Boccard)in the purchase order and receipts. We need to have the same tolerance in order to be smooth in treatement of invoices. Stage of PAyment are still mandarotry to manage terms of payments for components order with quantities different thant 1.How to implement this ? Kindly help me with this.
Hi community,I am experiencing an issue on the Resource Forecast Scenario screen where the output data remains at zero (0). As a result, the chart is not being displayed.Could you please advise what master settings or specific data are required to make the chart display properly?
We would like to utilize W/D/R #s on parst/qty in a certain location for allow for more flexibility than Handling Units currently provide. Is it possible to add W/D/Rs to several inventory lines/qtys at once of varying part numbers?If more info is desired:We have a control hold for quality to prevent the reservation of parts as parts are coming off our production line. Quality would remove this ACI from several lines at once once inspection is done, but we’d like to allow them to add the W/D/R to the lines they are currently inspecting (to prevent more qty from appearing on that “inventory part in stock” line if production is still ongoing). We wanted to add something like “Inspecting” as the W/D/R #. We already attenoted adding a quality operation after ops was done, and it was not successful so we’re looking for a more flexibile solution.
Hello community, CAMT version <?xml version="1.0" encoding="UTF-8"?><Document xmlns="urn:iso:std:iso:20022:tech:xsd:camt.053.001.08" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"> IFS Version 24R2 I have placed the CATM file on server IN folder. Here is the IFS provided routing rule with routing address. 2 application messages are generated for a single file and both are in Error. Can anyone help what is the issue with import? Thank you
I am calling the ReceiveEinvoiceService to import External Supplier Invoices into IFS. I have followed the 3 steps in the REST API documentation to post the Invoice Structure, upload 2 attachments, and finally process the invoice. I see everything was received correctly by IFS inside of the External Supplier Invoice screen. After IFS has received one of the invoices through the ReceiveEinvoiceService, a user in Finance needs to go into the External Supplier Invoice screen in order to click the ‘Create Invoice’ option for it to flow to the Manual Supplier Invoice where it will be review / match to purchase orders and receivers.A request has been made by our Finance Team to have the ‘Create Invoice’ option to automatically happen once the ReceiveEinvoiceService completes so that the Manual Supplier Invoice is created without user interation.To accomplish this, the External Supplier Invoice Parameters were change to ‘Check When Loaded’ and ‘Create When Checked’. Now the ProcessEinvoi
Is there a way to do a check on a user password in Cloud 25 R1? It was easy in Applications 10 because every user had a corresponding Oracle account but that is not the case in Cloud. Can it be verified using the IAM Users screen?Thank you
Why we don’t see the node 48210 (411) (yellow marked) form the Organization Structure in the supervisor - Access Setup. Both are on the same date 01.07.2026.Does anyone have any idea what might be causing this?Best Regards,André
We have a slight issue on our cloud environment; the Work Tasks screen is in accessible because the back-end view ACTIVE_SEPARATE was replaced with a different version accidentally. The select statement within the original view was saved down before the view was overwritten so we have that but the column headings of the view were not saved is there a codebase anywhere where this can be retrieved from?Thank you
Hello, I would like to see the received quantity of purchase order lines from the Purchase Order screen, PurchaseOrderLinePart and PurchaseOrderLineNopart. For example, each Part Order Line may be partially received, and I would like to see a reference to the quantity received for lines at any given time from this screen. Is this possible? Thank you!Adam
The HR department needs the ability to create records for candidates who have already been offered a position.In the HCM module, there is an Applicant object available; however, it does not meet our requirements because:it is visible to all users who have access to the view, there is no possibility to restrict access at the entity/company level, which in practice makes it unsuitable for secure use.Additionally, it is required that such a record supports an approval workflow.Given the above, the question is:which alternative object in IFS App10 could be used to meet these requirements (access control + approval workflow)?
Hi IFS team, I am getting below error while installing MT for IFS cloud 25R1 . [Fri Apr 24 14:30:26 UTC 2026][MTINSTALL] - INFO: Generating symmetric-keys. These will only be persisted if the secrets, 'symmetric-key' and 'bpa-odata-symmetric-key' does not exist.[Fri Apr 24 14:30:26 UTC 2026][MTINSTALL] - INFO: Running middle tier install step[Fri Apr 24 14:30:30 UTC 2026][MTINSTALL] - INFO: Repo updated successfully.[Fri Apr 24 14:30:30 UTC 2026][MTINSTALL] - INFO: Using local chart.[Fri Apr 24 14:30:30 UTC 2026][MTINSTALL] - INFO: Running dependency update..[Fri Apr 24 14:30:32 UTC 2026][MTINSTALL] - INFO: Dependency update failed. Retrying in 1 minute...[Fri Apr 24 14:30:32 UTC 2026][MTINSTALL] - INFO: Retry attempt: 1 of 5[Fri Apr 24 14:31:32 UTC 2026][MTINSTALL] - INFO: Dependency update failed. Retrying in 1 minute...[Fri Apr 24 14:31:32 UTC 2026][MTINSTALL] - INFO: Retry attempt: 2 of 5[Fri Apr 24 14:32:33 UTC 2026][MTINSTALL] - INFO: Dependency update failed. Retrying in 1 minut
I am looking to implement secondary status indicators for projects that have reached substantial completion (all operational work has been completed) but have not yet reached financial completion.My proposed approach is to utilize Project Category 2 by adding two additional values: In-Work and Closeout, alongside the existing Completed status. This would provide three distinct project phases:In-Work – Operational work is actively in progress. Closeout – Operational work is complete, but financial closeout activities are still outstanding. Completed – Both operational and financial work have been completed.My primary question is what the best method would be to transition a project from In-Work to Closeout. Is there an existing event or workflow in IFS that could be used to automate this transition, or would a manual update to Project Category 2 be the recommended approach?
I am missting the drag and drop option when creating new documents in all of our nordic presales environment on 21R2 - running in Chrome. If I run in Edge it worksWondering if I am missing a setup somewhere - or if I am experiencing a bugMy Create New Document form looks like this in Chrome and like this in Edge:
I created a post ~4.5 years ago about the challenges I was having when transitioning from EE to Aurena. In that post I listed many EE functions which were missing in Aurena. There were many positive replies with ideas / workarounds / alternatives which was great to see (the IFS Community working exactly as is should!).Here’s a link to that previous post: Aurena Vs Enterprise Explorer | IFS Community So here we are ~4.5 years later, I thought it might be interesting to re-visit that list, and see what progress has been made... Start pages – Still don’t exist in Aurena. Custom Elements on Lobbies offer some similar functionality, but there are some limitations and so it’s not quite as versatile as an EE Start Page. Doc macros – The “Aurena Agent” browser extension enables doc man macros on some Aurena Pages (but not all). Furthermore, I believe the Browser Extension is Windows only, so Doc Macros don’t work when running on non-windows Operating systems) Structured Docs – Still no method
Dear IFS Community, we have just installed a Demand Planning Server and are experiencing difficulties configuring it according to our company’s requirements. The problem is as follows: We only have these two tables available for selectionand they appear to contain only demand for “SalesParts.” We cannot use “SalesParts” for our company because we primarily sell finished goods based on “ProductStructures.” Our goal for the demand planner is to operate based on “InventoryPart.” Ideally, we would like to calculate demand based on “Inventory_Transaction_History” using selected transaction codes. Is there a way to configure the two views available in the demand planner module, or is there an option to add a custom view so that the demand planner calculates the correct demand for our company?We are on IFS Cloud Release 25R2. Thanks in advance. BR, Sabrina
Hello Everyone, I open this thread, I believe this is a know issue but I did not find the answer for now. I’m in the context of E-invoicing AR invoice from IFS to middleware Azure Platform. We are configuring 25R2 SU5 environment for that matter and we have to use an API logic. So far I struggle with that issue : ExecutionException from Sender thread Caused by: ifs.fnd.connect.senders.ConnectSender$PermanentFailureException: OAuth2 token request failed (HTTP 400): Bad request error: 400 ({"error":"invalid_request","error_description":"AADSTS90014: The required field 'scope' is missing from the credential. Ensure that you have all the necessary parameters for the login request. Trace ID: f2a6f0a9-8e24-4f1d-a51a-c8fba05e5700 Correlation ID: 302cae6a-7094-4804-af2c-5dbdd6b8f2a0 Timestamp: 2026-06-30 11:30:04Z","error_codes":[90014],"timestamp":"2026-06-30 11:30:04Z","trace_id":"f2a6f0a9-8e24-4f1d-a51a-c8fba05e5700","correlation_id":"302cae6a-7094-4804-af2c-5dbdd6b8f2a0","error_uri":"https
Hi Docman experts,I am working with a customer who wants to migrate documents from SharePoint to IFS Cloud.Could anyone advise on the best way to do this? I found a few posts mentioning the CreateAndImportDocument API, but I would appreciate any guidance or best practices from those who have done this before.Also, what is the recommended approach for creating the object connections? Should these be handled separately through another script, or is there a better method?Any help or suggestions would be greatly appreciated.Thanks,Chamath
Hi,We have a lot of parts that needs to be sales parts, purchase parts and inventory parts, but are low cost and classified as consumables. When our internal customers order these parts, they need to register arrival into stock as any other purchase order. Then they issue it on a material requisition.Our end users experience that it is time consuming to use the material requisition page to do this; yu need to register 1 by 1 part with location and quantity, then you need to reserve them, and then issue them. The latter 2 can be done in one operation, but it is the adding of lines that are time consuming. Does anyone know of any other more effecient way to do this, or have created fex a BPA for “Bulk registration” on MR? BR,Henning
Hi Community, I have a Customer Order with: A customer order line A charge line connected to the COLThe customer order line is connected to a project activity.In the project activity:The customer order line amount is displayed in the planned revenue The charge line amount is not displayed in the planned revenueSo, on my activity, my planned revenue is not complete.It should be: COL amount + COL charge amount. Is it possible to set up the system to achieve this?
Hello,we have a forecast flow all with Model: “EWMA Level”. I have received a manual forecast from a customer, which I have loaded in the demand planner by using a migration job and the external import function of the server. That worked fine. But I then changed the forecast model also with the use of a migration job. In the demand planner the model indeed was changed. But the system forecast was still there which normally is not the case for this forecast model. I grouped all items and changed the forecast model again to see if the system forecast was updated to 0. But this was not successful. Someone any idea of what I do wrong?
Hi everyone,Did anyone experiencing an internal server error while logging into IFS Cloud? It happens randomly even with initial load on IFS Cloud. Sometimes refreshing the page doesn't work. The user needs to restart the browser or navigate back to the startup page and log in again. Is this a cache issue? We are using Google Chrome. Are there any tricks to get rid of this?Thanks!
Hi all,This job was executed on 11/19 but has not been completed. I would like to know how long it will take and how to stop it. Thank you! I tried clicking "Stop Job" to stop it, but the following error message was displayed:Best regardsFeng
Normally when you create a customer order and then create an invoice the Income Type is fetched from the customer delivery address and added to the invoice lines Income Type field. But for single occurrences its not fetched correctly. How to make the connection between single occurrence and the income type? And then its fetched to the invoice lines But when you create a single occurrence on the co headerThe income type is not fetched.
Is there a way to Receive a RMA which has ownership consignment? we are currently getting the below error Below is the story behind this request We have a customer who would like to use their own labels for their deliveries. To create these, we need to process the order via Shipments, not via standard delivery notes. User created an order (G1159224) and then generated the shipment (14614) from it. When she went to print the labels, she realized she had forgotten to create the Sales Part Cross Reference for the parts. She rectified this by adding lines to the order with the sales part cross-reference and then dragging these into the shipment. However, she forgot to cancel the incorrect lines (those without a sales part cross-reference). She then finalized the shipment and realized that she had delivered most of the parts twice. Now she has to book back everything via an RMA (13536 and 13542). For some parts, this isn’t a problem, but she has also accidentally delivered consignment par
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.