Q&A Discussion of IFS Solutions for our IFS Employees, Partners and Customers
Recently active
It is my first time using ACTION with an IFS REST Connector for Cloud in Boomi. I am specifically using the Invoke action “PromoteToObsolete” on a document. This is the Post request:https://**********************.com/main/ifsapplications/projection/v1/ManageDocuments.svc/DocIssueSet(DocClass='{DocClass}',DocNo='{DocNo}',DocSheet='{DocSheet}',DocRev='{DocRev}')/IfsApp.ManageDocuments.DocIssue_PromoteObsoleteI’ve been using this forum to help me start but I think I’m stuck because I have multiple parameters that I need to pass. I am currently receiving a Bad Request so there must be something wrong with the way that I am passing the parameters.Before my Connector, I set up a “Set Property” shape of a Dynamic Process Property that contains he value that I will be using for the Bound Entity Set Parameters:After that, I connected it to my Connector. In the Dynamic Operation Properties tab, I call on the DPP that I set earlier as the Bound Entity Set Parameters. (in additional, I added the E
The PROJECT INVOICE should have direct access to the Customer details with hyperlink. This is already in place and active with the CUSTOMER INVOICE.
Hi, does anyone know why in this routeApplication Base Setup>Enterprise>Customer>Customer>CRM Infounder the representatives list some customers show an “add” button (first image) while some other customers don’t (second image)? Also if i try to add using the only available button i see this error
Hi All,We are using IFS Cloud 24R2 and MWo app based on this version.When Downtime Enablement Per Work Type Category is enabled then it works fine in IFS Cloud. How about assignments that are executed from MWo, as there seems no functionality in MWo where the downtime is asked for mobile used before closing assignment. The mobile user completes the work assignment and work task moves to Work Done status without asking for downtime registration.Please correct me if there is any setting or configuration that need to be done for Mobile app to use the downtime feature ?Thanks for your responses and help in advance.Regards,Srinivas
When attempting to edit B2B navigation for customer's environment, we are unable to see any way of editing the navigation for B2B users. The options don't appear on the Navigator Designer page in main and logging in as IFSADMIN to B2B show NO Navigator Designer option? Test Steps:Log into B2B and check for Navigator Designer related Jira : TEAURENAFW-3192
Hello,I saw a post Aurena Custom Command - Multiple Records that it is possible to select multiple records and execute Navigation Link.Is this possible or will this be possible for ExecuteQuickreport?I want to select some Purchase orders and then run a quickreport based on the selected records.We are currently on 23.1.7 Kind regards
Hi,I am facing an issue with mismatch in Unused Days in ‘Absence Limit Days’ Please see above screenshot, it is showing Days Used as 6 and Days Unused as 20. When clicking on Details, it is showing Unused Days as 18. I have checked employee has applied only 4 days leave, so why it is showing unused days as 18, it should be 20 days? How to correct this mismatch? ThanksVikas Jain
Hello everyone,our customer performs many manual changes in PSO. When we execute a mass change, we encounter the following issue: only some of the unplanned activities are assigned to the selected resource, while the rest are returned to the unplanned activities pool.According to the documentation, there should be an option to fix activities to a specific date and time. However, this option is not visible in our system. How can we enable this option?I have admin rights, and we are using version 6.13.0.51. Thank you in advance!
I am currently working with a client undergoing a major organizational restructuring. Naturally, this will impact various aspects of IFS, but especially the graphical organization structure.Everything from the hierarchy of organizational units to transfers between different units will be affected over a three-month period. This is not a very common scenario in any organization—certainly not on this scale—given how many individuals and units are involved.What is the best way to approach this? Where should I start, and what are the key elements I must not forget or overlook? Any insights or past experiences you can share would be greatly appreciated.
Is it possible to deploy PSO v6.15 to the same middletier kubernetes cluster setup for IFS Cloud FSM (24R1)?
Dear all,We were exploring the IFSAPP10 online documentation and we found the RCM ANalysis module, which has the Receive/Prepare/Execute the RCM Analysis.I have some questions about this functionality.1. Is this available for IFS App10?2. how do I use it, can someone share any support document? Is there any image as example? Because in the online documentation has some generic support documentation and I couldn’t understand how it really works.
We already reconciled the 4/1/25 bank rec. A clerk made an error and brought in another bank rec with a date of 4/1/25. IFS will not let us remove the bank rec. The error is that there are matched transactions. I believe it is from the original 4/1/25 bank rec.Is there a way to un-finalize the original 4/1/25 bank rec? Thanks
When I right click on a IFS page a huge options shows, Is there a way to minimize the number of options?
Regarding the pain002 file status report upload, we have received 2 files. One file has ACTC - Accepted technical validation, and the other file has ACCP. Once we upload the file which has the status code ACTC, then the order got acknowledged and the status code got changed accordingly. But when we upload the next file which has status code ACCP against the payment order, the system says that cannot acknowledge the order which is already acknowledged and the status is also not getting updated, it remains with the previous status code.How to handle this in IFS?
HiWe would like to automate our server patching process which would require clean shutdown and then startup of the Weblogic components on the Apps server before and after. If possible we would also like to automate the startup and shutdown of the Weblogic components.We currently manually run mws-svr.cmd and enter the required info when prompted (Start > all > Password).Has anybody automated the running of this script and the interaction with it, and if so how?We are on Apps 10 Update15.Thanks in advance
When I reconfigure IFS APPS 10 SERVER with PATHTRU Balancer when server start no port is open on the apps server, when I check the status all are running
hi IFS Community,I would like to know the (correct) step by step process of using an approval template to approve a project forecast and set it as Active Budget. Can someone please describe this process with some screenshots of the pages in IFS Cloud please? This is the sample DOA for reference. Value range (AUD) Project Role 0 - 10,000,000 Contract Administrator 10,000,001 - 20,000,000 CFO Above 20,000,000 Director Many thanks,Ashani
Dear Connections,In IFS’ standard cloud application, the Incoming Dispatch Advice is not particularly helpful when working with inbound sea freight operations. We have a requirement from one of our customers, where the customer procures material from overseas suppliers. As transit times via ocean vessels are quite uncertain these days, the final arrival date at the warehouse often changes. In this scenario, our customer wants to track the inbound shipment status.Additionally, a single vessel may contain multiple orders from multiple suppliers. However, in IFS, we do not find an option to perform receipt for multiple orders from different suppliers within a single shipment or dispatch advice. This is because the standard Incoming Dispatch Advice functionality only supports multiple orders from a single supplier.Is this something on the Road Map for the future IFS cloud releases?I appreciate your comments and suggestions on this.
I do a lot of forecasting using S&OP. I want to predict my future material requirements in MRP based on the MS set 2 forecasts. How do I do that?
Our initial install for IFS cloud completed without error, but our URL is not reachable. When checking our Kubernetes pods I see that our application pod had this event….Warning FailedMount 4m24s (x500 over 16h) kubelet MountVolume.SetUp failed for volume "secrets" : secret "ifsmtxapp-password" not found Has anyone had this type of error? Know how to fix it?
The default is set to "Same as To Location" Is it possible to change the default to "Same as From Location"
Apps 10Hi All,Does anybody know if its possible to extract the text in the ‘Help Description’ in Context pane?I’ve read this post And like the OP, I unable to do it..Thanks for any assistance..
When editing a Customer Credit Card expiry year field in 24R2, the following error occurs: IFS Web Version: 24.2.5.20250402090305.0Date: 2025-05-07T12:55:23.326ZCCustomerCrecar/CustomerCrecarPage (server error)Malformed Request.Error details: [{"code":"TYPES_NOT_COMPATIBLE","message":"The types 'Edm.String' and 'Edm.Int16' are not compatible."}]Request Id: 2da75f5a-8c93-44d5-a342-7a43156d7ca7Url: https://domain.com/main/ifsapplications/projection/v1/CCustomerCrecarHandling.svc/Reference_CCreditExpYearsLov?$filter=ExpYear%20eq%202033&$skip=0&$top=2 This did not happen in previous versions. I tested it in two of our environments, one with the most recent update and one with 23R1. The one with 23R1 has no issue. I’d imagine this error occurs because the ExpYear field changes from “int character” in 23R1 to just “int” in 24R2. Has anyone else encountered this issue and is there a workaround?
Are there release notes for 25R1 available?
Recently, a customer asked how required quantity is calculated when using a scrap factor (%). Here's the scenario:You have two components in the shop order (lot size = 1), but UOM in YK-S-P1 is PCS and in YK-S-P2 it is pcs (decimal allowed, qty calc = 2). The problem customer had, why the required qty is not calculated as: (qty per assembly * scrap factor + qty per assembly)According to that, for the second part required qty = 1 × 0.1 + 1 = 1.1. He asked why it was 1.1112?The calculation here is done according to the equation: lot size/ (1-scrap factor)So, for the first part: 1/ (1-0.1) = 1.1112 but the qty UOM here is PCS(decimals not allowed). Therefore, required qty = 2.For the second part, the same calculation, since the decimals are allowed, qty required = 1.1112.What is this equation lot size/ (1-scrap factor) and from where does it come from?There are 2 ways you can derive this equation:Using Proportional Inverse Relationship Using Recursive Loss / Geometric Series (found this t
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.