This will include the questions related to Procurement, Demand Planner, ASC, and SRM.
Recently active
Can I create purchase requisitions based on inventory part condition codes? Can this be done through MRP?
We are starting to look at alternate components and I am wondering how IFS handles demand for alternates that are not planned by MRP, but by Order Proposal. Our alternates are currently set a Planning Method B. Do they need to be set to a planning method that uses MRP? Also, if we run PRMP and select the box that will run MRP immediately after, will that plan for alternate components? We are in Apps 9, UPD17.
Can I generate a purchase requisition based on inventory levels in a particular inventory location? I would be dedicating a particular inventory part to that warehouse location.
Community, Does anyone has experience on below error? screenshot attached. It is a request from Work Order. Thank you.
Why does the Earliest Unlimited Supply Date calculation calculate only based Purchase Leadtime when Purchased Parts have a structure? (Cumulative leadtime is longer than the date indicated in the earliest unlimited supply date) Why does the Expected Leadtime seem to calculate based only on calendar days and ignoring the work calendar and exceptions list?
Hi, what event/configuration or settin doing to attached a pdf when an email is sent from the involve parties tab . example below.in standard when we clic on the “email” pictogram the email is openned without attached file.Thanks in advance
I tried creating a record in supplier for purchase part screen and also via migration jobs, it gives the error: ORA-20110: PurchasePartSupplier.NOTMATCHPURGRP: Part Category does not match with Supplier Category. I checked and the Purchase Group is the same on both the supplier and Purchase part, what else could it be?
We have a scenario of receiving multiple purchase orders through frieght forwarder , how can i enable the shipment transaction to recieve materials into our stock and enter invoice details of forwarder into the shipment transaction. Based on that i will be booking charges for frieght forwarder.
When creating a new user in the system, the user is getting granted access to all flows by default. Is this a bug/is there a way to ensure that the access is only granted manually and not by default Thanks, Callum
Kindly our company is in need to use scheduled order for the purchase orders, how the purchase order schedule or supplier schedule canbe activated? there is a check box in purchase order screen how it can be used? we are using IFS10 UPD11Thank youBilal Drayi
Hi,I have enabled the option allow changes to authorized requisition .Now i can change supply , quantity or any other details even after my PR is authorized,My question is - after i have done changes to my PR the status is still authorized, Is there any option i can set up so that system needs reapproval on PR after the changes.Note: My customer wants authorization only at PR level not at PO. so changes on auth PR is dangerous with reapproval.
Hello,We have several parts that need to be ordered with one unit of measure on the PO but stocked and transacted with another unit of measure. example: We purchase wire by the foot but stock and transact it in meters.All BOM requirements and stock balances are in meters, but need the PO to be expressed in feet for the supplier to see when ordering.Is there a method to handle this automatically when issuing the purchase order? Thank you.
What is the method to ship misc parts to suppliers? If an engineer wants to ship some samples of items to a supplier, without expectation of receiving them back into stock, how can we do that? Is there a way that a buyer can create a supplier shipment? Is there a backhand way of having a buyer create a customer order without actually going into the customer order module and creating one from scratch?
When printing out a PO the page #s auto generate. Is there a way to eliminate this option (so print out does NOT show page #s)
Hi Everyone, Freeze part while counting getting activated automatically, the original setting for the count report was created had this option deactivated, this is causing that parts to get frozen during counting Any suggestion, am I missing out on something? Thank you.
When updating it comes to this error message. Does anyone have any idea where the error could be? Is there possibly document with the basic settings?
We recently began using MRP and DDMRP to create purchase reqs for our planning method “G” and “H” parts. We are having an issue though, because when we allow MRP to create the purchase reqs for a work or shop order, the system does not reserve the material to the work order or shop order when it comes in.Is there a way, or a background job that we can run that will auto reserve material to work orders and shop orders where MRP created the purchase req required for the work or shop order? Thanks,Sarah
Hi , Purchase Requisition was not authorized, but we still can create a request for quotation. Any specific logic behind it?
Hi, I am intending to update delivery instructions on PO which is authorized, any suggestions on how can i change the delivery instructions and add contact no. Basically, I want updated contact no and delivery instructions on the PO printout. Please suggest
Hi, Unable to add tax code for screen order quotation approval lines . (tax code is flowing in PR but not in the approval screen) Any suggestions?? from where this tax code is flowing for the order quotation approval screen thanks in advance
Hi Sir, Our company is in need to use supplier schedule to create purchased based on supplier agreement and schedule. Kindly is it possible and what are the screens which they can be used?we are using IFS10 UPD11 Best Regards,Bilal Drayi
We have a situation where the purchase requisition rejected by Last approver will revoke the approvals of previous approvers . Let say we have a template of 3 people approving the purchase request like Department Head , HR and Finance. If the last approver Finance rejects the Purchase requistion, then it will revoke the approvals approved by previous approvers ( Department head and HR). Is there a setup to stop, what we need is even if the thirs approver rejects the other two approavals should remain in place. it seems to be a bug.
The attached image is the error thrown when attempting a PO for a particular internal supplier.
Hi,We have started to use the service and maintenance section of the system to record internal work done on our manufacturing tools. However whilst investigating moving this to the production of our new tools I have noticed an issue. When you pre post the work order to what we have classed as the project code (code F) I can not add departments to any pre posting on requisitions header that I raise. I have to go into every line on the requisition to add the department. Is this how the system is supposed to work? Or have I not set the permission up correctly to allow this?Pre Posting Option in requisition headerPre Posting Options on requisition line
Hello,is it possible to set up the intersite process for non-inventory sales parts?I tried creating a custom order but could not define the internal supplier for that part. Any help is appreciated.Golo