At Shop Floor Workbench, the shop order is running, we want to interrupt it, we go to
Stop Production,
Can we change the default to
Ideally, we could assign a default option for the most used interruption cause too.
Could we adjust the defaults? Operators “2 vs 6 clicks, need to run the machine” and they are right.
Thank you in advance,