However, can project time approval for cost accounting be controlled until the line manager authorizes the time?
Page 1 / 1
Hi @RASFE ,
There is a Company property setting to control the Approval based on the Confirmation of the Date(not against the Authorisation).
Property ID : NOAPRBFCON - No Approval before confirmation
In this example, you could see that the Day is not Confirmed yet in the Time Card. However, the option to Approve the transaction is available.
Now, I have set the property like below in the Company level, that is to block the Approval when the the Day is not Confirmed.
As a result, the option to Approve is not visible anymore in any Project Transaction in this Company.
I’m clear that you are looking for something similar but for “Authorization”, instead of “Confirmation”. So what can be done is to go for a customization (or a custom event) to setup a Property like above for “Authorization” as well. Then you can enable/disable it and maintain it even as a company setting (rather than a system-wide setting).
@Tharindu Illangasinghe
Thank you for the Response. I agree with your points.