can't change early finish date of an Activity, although we had modified the required dates on all the existing demands to be in line with the desired finish date
can't change early finish date of an Activity, although we had modified the required dates on all the existing demands to be in line with the desired finish date
Hi
Can you provide a screen shot of the “Demand” tab. Make sure you capture the “Required Date” field
Best Regards,
Tharaka.
Earlier we had modified the Required dates of all the existing demands on this particular Activity, to be within the Early Start & Finish dates..
To our surprise, we were able to change the dates the very next day!!
Thanks Much
Hi
If the required dates of all the demand lines are within the Early Start & Finish dates, I believe this issue needs in depth investigation. Hence creating a ticket to IFS support is the best solution I can think of.
Best Regards,
Tharaka.