Skip to main content

Hey everyone,

our customer has different machines that are subject to different maintenance intervals. These maintenance intervals are based on the number of operating hours. However, they are not always the same number of operating hours. For example, the first maintenance can take place after 250 operating hours, the second maintenance after another 500 operating hours, the third maintenance after another 1000 operating hours, and so on. How can different maintenance intervals be mapped for a machine in preventive maintenance?I assume that we are currently failing to correctly capture the criteria for triggering the PM and entering it in the work task template. Can anyone help out here? Many thanks in advance! 

P.S. the customer is working on the App10 environment 

Hi @Lela ,

As per the current design we can only provide the starting point and a fixed interval for an accumulated parameter (such as operating hours) to predict the maintenance plan. When the interval is not the same the only method I can think of is manually generating the work order based on the recorded operating hours. Or else you can cancel any work order created when the maintenance is not required. Here in your scenario if interval is set to 250 , you can cancel the work order generated at the generation value of 750.

Please let us know if you need further clarification.

Thanks & Best Regards,

Nethmini