I have a scenario where we have created a packing instruction which we are assigning to a shop order to handle the receipt element pre-packed into the handling units. However, I have a scenario where I want to change the packing instruction at receipt so that received product gets built using a different packing instruction.

 

Does anyone have any suggestions on how to do this as the receipt screen from shop order does not let you specify the packing instruction.

Hi;

Click on the “Handling Unit Structure "Tab

If Handling Units are already connected, we can disconnect or delete them as desired by Selecting the Node and RMB and select desired option.

 

Then we can straightaway add  handling units directly or Generate Handling Units based on a Packing Instructions as below or connect Existing Handling Units also possible by selecting required RMB option from the Tree Structure.

 